April 2, 2009 LICENSEE:
FIRST ENERGY NUCLEAR OPERATING COMPANY (FENOC)
FACILITY:
BEAVER VALLEY UNITS 1 AND 2
SUBJECT:
SUMMARY
OF THE MARCH 2009 ANNUAL ASSESSMENT OPEN-HOUSE PUBLIC MEETING On March 31, 2009, at 6:30 p.m., the NRC conducted an Annual Assessment Open-House Meeting at the Shippingport Community Building in Shippingport, PA. The NRC conducted the open house meeting to discuss the NRCs assessment of the safety performance of the Beaver Valley Units 1 and 2 for the calendar year 2008.
A notice of the open-house meeting was issued on March 18, 2009, and was posted on the NRCs external (public) web page (ADAMS Accession No. ML090771222).
The NRC presented posterboards and was available to discuss its assessment of the safety performance of Beaver Valley Units 1 and 2 for the period of January 1 through December 31, 2008, as documented in our letter dated March 3, 2009 (ADAMS Accession No. ML090620768).
A number of local officials and FENOC employees attended the open-house and were offered the opportunity to question the NRC regarding FENOCs performance and the role of the agency in ensuring safe plant operations.
Sincerely,
/RA by G. Scott Barber Acting For/
Ronald R. Bellamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects Attachments:
See List of Attendees
April 2, 2009 LICENSEE:
FIRST ENERGY NUCLEAR OPERATING COMPANY (FENOC)
FACILITY:
BEAVER VALLEY UNITS 1 AND 2
SUBJECT:
SUMMARY
OF THE MARCH 2009 ANNUAL ASSESSMENT OPEN-HOUSE PUBLIC MEETING On March 31, 2009, at 6:30 p.m., the NRC conducted an Annual Assessment Open-House Meeting at the Shippingport Community Building in Shippingport, PA. The NRC conducted the open house meeting to discuss the NRCs assessment of the safety performance of the Beaver Valley Units 1 and 2 for the calendar year 2008.
A notice of the open-house meeting was issued on March 18, 2009, and was posted on the NRCs external (public) web page (ADAMS Accession No. ML090771222).
The NRC presented posterboards and was available to discuss its assessment of the safety performance of Beaver Valley Units 1 and 2 for the period of January 1 through December 31, 2008, as documented in our letter dated March 3, 2009 (ADAMS Accession No. ML090620768).
A number of local officials and FENOC employees attended the open-house and were offered the opportunity to question the NRC regarding FENOCs performance and the role of the agency in ensuring safe plant operations.
Sincerely,
/RA by G. Scott Barber Acting For/
Ronald R. Bellamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects Distribution:
S. Collins, RA M. Dapas, ORA D. Lew, DRP J. Clifford, DRP R. Bellamy, DRP G. Barber, DRP C. Newport, DRP D. Werkheiser, DRP, SRI D. Spindler, DRP, RI P. Garrett - Resident OA S. Campbell, RI OEDO H. Chernoff, NRR J. Lubinski, NRR N. Morgan, NRR R. Guzman, NRR After declaring this document An Official Agency Record it will be released to the Public.
Document Name: G:\\DRP\\BRANCH6\\ROP ASSESSMENT FOLDERS\\ROP 9\\BEAVER VALLEY\\END-OF-CYCLE\\BV 2009 AA MEETING
SUMMARY
.DOC To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME DWerkheiser/ DW SBarber/ GSB RBellamy/GSB for DATE 04/01/09 04/ 02 /09 04/ 02/09
OFFICIAL RECORD COPY