Request for Additional Information, License Renewal Application
ML080590262
Person / Time
Site: Beaver Valley
Issue date: 03/03/2008
From: Kent Howard
NRC/NRR/ADRO/DLR/REBB
To: Sena P
FirstEnergy Nuclear Operating Co
HOWARD, KENT, NRR/ADRO/RPB2, 415-2989
References
TAC MD6593, TAC MD6594
Download: ML080590262 (6)


Text

March 3, 2008 Mr. Peter P. Sena, III Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-BV-SEB-1 P.O. Box 4, Route 168 Shippingport, PA 15077

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MD6593 AND MD6594)

Dear Mr. Sena:

By letter dated August 27, 2007, FirstEnergy Nuclear Operating Company submitted an application pursuant to 10 CFR Part 54, to renew the operating licenses for Beaver Valley Power Station, Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.

Items in the enclosure were discussed with Mr. Cliff Custer of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-2989 or by e-mail at klh1@nrc.gov.

Sincerely,

/RA/

Kent L. Howard, Sr. Project Manager Reactor Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosure:

As stated cc w/encl: See next page

ML080590262 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR NAME SFigueroa KHoward RFranovich DATE 02/29/08 02/29/08 03/03/08 BEAVER VALLEY POWER STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION REQUESTS FOR ADDITIONAL INFORMATION, SECTIONS 2.3.3.2, 2.3.3.8 Section 2.2 RAI 2.3.3.2-01 LR Drawing 1-44B-1: At drawing coordinates C-6, valves VS-D-4-11B and VS-D-4-11A are shown receiving a containment isolation signal, phase B (CIB). This seems to indicate that these valves are used as an isolation barrier following a CIB signal.

LR Drawing 1-44B-1 indicates these valves are in scope for fire protection only. Please explain why these valves and associated duct between the valves and from the valves to the penetration are not in scope as a pressure boundary or leakage barrier.

RAI 2.3.3.2-02 LR Drawing 2-44B-3: At drawing coordinates C-3, shows a direct expansion cooling unit 2HVP-ACUS301. There are two pipe connections shown for this unit, a capped line and a 3/4-inch hose connection. Is there a condensate drain for the cooling unit? If so, is the condensate drain in scope for 10 CFR 54.4(a) (2) for leakage?

Section 2.3.3.8 RAI 2.3.3.8-01

a. LR Drawing 2-47-1: At drawing coordinates C-8/9 the lines from panel 2PHS-EALI associated with the connections labeled CNMT. BLKD. SHAFT A SEAL TEST CONN.

and CNMT. BLKD. SHAFT B SEAL TEST CONN. are not highlighted as being in scope while the lines from the connections labeled CTMT. BLKD. DOOR SEAL TEST CONN. and ATMOS. BLKD. SHAFT A SEAL TEST CONN. are highlighted as being in scope. Both sets of lines appear to enter the hatch airlock volume. Explain why the scoping difference.

b. Also, the test panel connection labels ATMOS. BLKD. SHAFT A SEAL TEST CONN, ATMOS. BLKD. DOOR SEAL TEST CONN. and ATMOS. BLKD. SHAFT B SEAL TEST CONN do not appear to match up with the lines whose test connections they are closest to. Please clarify this labeling arrangement.

Enclosure

Letter to P. Sena from K. Howard, dated March 3, 2008 DISTRIBUTION:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MD6593 AND MD6594)

HARD COPY:

DLR RF E-MAIL:

PUBLIC SSmith (srs3)

SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDciCvib RidsNrrDciCpnb RidsNrrDraAfpb RidsNrrDeEmcb RidsNrrDeEeeb RidsNrrDssSbwb RidsNrrDssSbpb RidsNrrDssScvb RidsOgcMailCenter KHoward ESayoc PBuckberg NMorgan MModes, RI PCataldo, RI DWerkheiser, RI

Beaver Valley Power Station, Units 1 and 2 cc:

Joseph J. Hagan President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308 James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 David W. Jenkins, Attorney FirstEnergy Nuclear Operating Company Mail Stop A-GO-15 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 Ohio EPA-DERR ATTN: Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149 Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, Ohio 44308 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-A P.O. Box 4, Route 168 Shippingport, PA 15077 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.

Harrisburg, PA 17110-9364 76 South Main Street Akron, OH 44308

Beaver Valley Power Station, Units 1 and 2 cc:

Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077 Cliff Custer FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077 Mike Banko FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077 Julie Firestone FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077