L-08-174, Request for Revised Submittal Date for Reply to Request for Additional Information for the Review of the License Renewal Application

From kanterella
Jump to navigation Jump to search

Request for Revised Submittal Date for Reply to Request for Additional Information for the Review of the License Renewal Application
ML081270236
Person / Time
Site: Beaver Valley
Issue date: 05/02/2008
From: Sena P
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-08-174, TAC MD6593, TAC MD6594
Download: ML081270236 (2)


Text

FENOC FirstEnergyNuclear OperatingCompany

'Peter P. Sena III 724-682-5234 Site Vice President Fax: 724-643-8069 May 2, 2008 L-08-174 10 CFR 54 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Request for Revised Submittal Date for Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC Nos. MD6593 and MD6594)

The referenced letter provided the FirstEnergy Nuclear Operating Company (FENOC)

License Renewal Application for the Beaver Valley Power Station (BVPS). Reference 2 requested additional information regarding BVPS license renewal time-limited aging analyses in Sections 4.7.1 and 4.7.3 of the BVPS License Renewal Application.

The FENOC reply to the NRC request for additional information (RAI) was originally due May 1, 2008. FENOC respectfully requests a revised submittal date of June 2, 2008.

Additional time is needed to evaluate and address, as necessary, an emergent issue identified in the documents that are being used to prepare the FENOC response to the NRC RAI.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Clifford I. Custer, Fleet License Renewal Project Manager, at 724-682-7139.

Sincerely, Peter P. Sena Ill

Beaver Valley Power Station, Unit Nos. 1 and 2 L-08-174 Page 2

References:

1. FENOC Letter L-07-113, "License Renewal Application," August 27, 2007.
2. NRC Letter, "Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC Nos.

MD6593 and MD6594)," April 1, 2008.

cc: Mr. K. L. Howard, NRC DLR Project Manager Mr. S. J. Collins, NRC Region I Administrator Dr. S. S. Lee, NRC DLR Acting Director Mr. D. L. Werkheiser, NRC Senior Resident Inspector Ms. N. S. Morgan, NRC DORL Project Manager Mr. D. J. Allard, PA BRP/DEP Director Mr. L. E. Ryan, PA BRP/DEP