Letter Sequence Response to RAI |
---|
|
Results
Other: L-08-123, Drawing Lr 1-46-2, Rev. 5, Post DBA Hydrogen Analyzer System., L-08-189, Drawing Lr 2-27A-2, Rev. 4, Auxiliary Steam and Condensate System (Ass)., L-08-261, Schedule for Submittal of Annual Update for License Renewal Application, L-08-262, Drawing, Lr Drawing 2-31-1, Rev. 5, Demineralized Water System (Wtd)., L-08-263, Submittal of Revision to License Renewal Application Amendment No. 24, L-08-292, Lr Drawing 1-21-1, Rev. 7, Main Steam System (Ms)., L-08-316, License Renewal Application Amendment No. 26 (TAC Nos. MD6593 and MD6594), Revisions, L-08-393, License Renewal Application, Amendment No. 33, L-09-058, Comments on Safety Evaluation Report with Open Item Related to the License Renewal, L-09-138, License Renewal Application, Amendment No. 36, L-09-151, License Renewal Application Amendment No. 37, ML081000322, ML081000323, ML081000324, ML081000326, ML081000327, ML081000328, ML081000329, ML081000330, ML081000331, ML081000332, ML081640592, ML081640593, ML081640594, ML081640596, ML081640597, ML081640598, ML081640599, ML081640600, ML081640601, ML081640602, ML081640603, ML081640604, ML082550686, ML082550687, ML082550688, ML083010249, ML092740576, ML092920050, NRC-2009-0496, Beaver Valley Federal Register Notice - Record of Decision to Renew License
|
MONTHYEARL-07-130, Submittal of Pressure and Temperature Limits Report, Revision 42007-09-19019 September 2007 Submittal of Pressure and Temperature Limits Report, Revision 4 Project stage: Request ML0805902622008-03-0303 March 2008 Request for Additional Information, License Renewal Application (TAC Nos. MD6593 and MD6594) Project stage: RAI ML0806402162008-03-0505 March 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 and 2, LRA Project stage: RAI ML0806010202008-03-0505 March 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 & 2, LRA Project stage: RAI ML0807202882008-03-21021 March 2008 Request for Additional Information, Section B.2.35 Project stage: RAI ML0807907442008-03-26026 March 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application, for Sections B.2.6, B.2.19, and B.2.23 Project stage: RAI L-08-122, Reply to Request for Additional Information for the Review of the License Renewal Application and Revisions to License Renewal Application Boundary Drawings2008-03-31031 March 2008 Reply to Request for Additional Information for the Review of the License Renewal Application and Revisions to License Renewal Application Boundary Drawings Project stage: Response to RAI ML0807903922008-04-0101 April 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 & 2, LRA Project stage: RAI ML0807905382008-04-0101 April 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 & 2, LRA Project stage: RAI L-08-124, Reply to Request for Additional Information for Review of the License Renewal Application and License Renewal Application Amendment No. 52008-04-0202 April 2008 Reply to Request for Additional Information for Review of the License Renewal Application and License Renewal Application Amendment No. 5 Project stage: Response to RAI ML0807907352008-04-0303 April 2008 RAI for the Reveiw of the Beaver Valley, Units 1 and 2, License Renewal Application Project stage: RAI ML0810002962008-04-0303 April 2008 Reply to Request for Additional Information for the Review of License Renewal Application, Amendment No. 4, and Revised License Renewal Boundary Drawings Project stage: Response to RAI ML0810003222008-04-0303 April 2008 Drawing Lr 1-07-2, Rev. 4, Chemical and Volume Control System. Project stage: Other ML0810003232008-04-0303 April 2008 Drawing Lr 1-07-3, Rev. 6, Chemical and Volume Control System. Project stage: Other ML0810003242008-04-0303 April 2008 Drawing Lr 1-08-1, Rev. 4, Boron Recovery Degasifiers. Project stage: Other ML0810003262008-04-0303 April 2008 Drawing Lr 1-09-2, Rev. 4, Vent and Drain System. Project stage: Other ML0810003272008-04-0303 April 2008 Drawing Lr 1-12-1, Rev. 5, Containment Vacuum and Leakage Monitoring System. Project stage: Other ML0810003282008-04-0303 April 2008 Drawing Lr 1-14A-1, Rev. 7, Sample System. Project stage: Other ML0810003292008-04-0303 April 2008 Drawing Lr 1-14A-2, Rev. 5, Sample System. Project stage: Other ML0810003302008-04-0303 April 2008 Drawing Lr 1-19-1, Rev. 5, Gaseous Waste Disposal System. Project stage: Other ML0810003322008-04-0303 April 2008 Drawing Lr 1-30-1, Rev. 5, River Water System. Project stage: Other L-08-123, Drawing Lr 1-46-2, Rev. 5, Post DBA Hydrogen Analyzer System.2008-04-0303 April 2008 Drawing Lr 1-46-2, Rev. 5, Post DBA Hydrogen Analyzer System. Project stage: Other ML0810003312008-04-0303 April 2008 Drawing Lr 1-24-1, Rev. 6, Feedwater System. Project stage: Other ML0809804832008-04-17017 April 2008 Request for Additional Information, Review of License Renewal Application Project stage: RAI ML0810503332008-04-17017 April 2008 Request for Additional Information, Review of License Renewal Application Project stage: RAI L-08-143, Reply to Request for Additional Information for Review of License Renewal Application and License Renewal Application Amendment No. 62008-04-18018 April 2008 Reply to Request for Additional Information for Review of License Renewal Application and License Renewal Application Amendment No. 6 Project stage: Response to RAI L-08-144, Reply to Request for Additional Information for the Review of License Renewal Application2008-04-25025 April 2008 Reply to Request for Additional Information for the Review of License Renewal Application Project stage: Response to RAI ML0811303942008-04-28028 April 2008 Request for Additional Information, Review of License Renewal Application Project stage: RAI ML0810502702008-04-30030 April 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: RAI L-08-146, Reply to Request for Additional Information for Review, License Renewal Application and License Renewal Application Amendment No. 72008-04-30030 April 2008 Reply to Request for Additional Information for Review, License Renewal Application and License Renewal Application Amendment No. 7 Project stage: Response to RAI L-08-174, Request for Revised Submittal Date for Reply to Request for Additional Information for the Review of the License Renewal Application2008-05-0202 May 2008 Request for Revised Submittal Date for Reply to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI L-08-149, Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application2008-05-0505 May 2008 Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: Response to RAI ML0814104162008-05-0808 May 2008 Transmittal of Correction to Reply to RAI for the Review of License Renewal Application, License Renewal Application Amendment No. 8 & Revised License Renewal Boundary Drawings Project stage: Request ML0810505432008-05-0808 May 2008 Request for Additional Information, Sections 3.5.2.2, B.2.1, B.2.3 and 4.6 of License Renewal Application Project stage: RAI ML0811604672008-05-0808 May 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0812009202008-05-0808 May 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC MD6593 and MD6594) Project stage: RAI ML0811205392008-05-15015 May 2008 Request for Additional Information, License Renewal Application (TAC Nos. MD6593 and MD6594) Project stage: RAI ML0814405432008-05-19019 May 2008 Reply to Request for Additional Information for the Review of the License Renewal Application Amendment No. 9. and Revised License Renewal Boundary Drawings Project stage: Response to RAI L-08-169, Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application2008-05-19019 May 2008 Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: Response to RAI ML0811304122008-05-22022 May 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0813605572008-05-22022 May 2008 Revision of Schedule for the Conduct of Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: Approval ML0811505772008-05-28028 May 2008 Request for Additional Information for Sections B.2.27, 4.3 and 4.7.4 of the BVPS LRA Project stage: RAI L-08-180, Reply to Request for Additional Information for the Review of the License Renewal Application2008-05-28028 May 2008 Reply to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI L-08-147, Reply to Request for Additional Information for Renewal License Application2008-06-0202 June 2008 Reply to Request for Additional Information for Renewal License Application Project stage: Response to RAI ML0814306872008-06-0404 June 2008 Request for Additional Information the Review of Beaver Valley, Units 1 and 2, License Renewal Application Project stage: RAI L-08-181, Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application, Amendment No. 102008-06-0606 June 2008 Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application, Amendment No. 10 Project stage: Response to RAI ML0816405052008-06-0909 June 2008 Reply to Request for Additional Information for the Review of the License Renewal Application License Renewal Application Amendment No. 11, and Revised License Renewal Boundary Drawings Project stage: Response to RAI ML0816405922008-06-0909 June 2008 Drawing Lr 1-14A-1, Rev. 8, Sample System (Ss). Project stage: Other ML0816405932008-06-0909 June 2008 Drawing Lr 1-21-1, Rev. 6, Main Steam System (Ms). Project stage: Other ML0816405942008-06-0909 June 2008 Drawing Lr 1-22-1, Rev. 4, Condensate System (Cn). Project stage: Other 2008-04-03
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-053, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-04-14014 April 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-058, 180-Day Steam Generator Tube Inspection Report2023-03-27027 March 2023 180-Day Steam Generator Tube Inspection Report L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-036, Report of Facility Changes, Tests and Experiments2023-03-13013 March 2023 Report of Facility Changes, Tests and Experiments L-23-086, Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0404 March 2023 Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-087, Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027)2023-03-0404 March 2023 Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027) L-23-073, Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0101 March 2023 Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-016, Twenty-Eighth Refueling Outage Inservice Inspection Summary Report2023-02-21021 February 2023 Twenty-Eighth Refueling Outage Inservice Inspection Summary Report L-23-064, Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-02-21021 February 2023 Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-22-193, Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H2023-02-14014 February 2023 Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H L-22-286, Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time2023-02-14014 February 2023 Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-032, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 20222023-01-23023 January 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 2022 L-22-281, Discharge Monitoring Report (NPDES) Permit No. PA00256152022-12-16016 December 2022 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-246, Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO2022-12-0707 December 2022 Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO L-22-217, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-11-21021 November 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-226, Emergency Preparedness Plan2022-11-0404 November 2022 Emergency Preparedness Plan L-22-222, Cycle 29-1 Core Operating Limits Report2022-10-31031 October 2022 Cycle 29-1 Core Operating Limits Report L-22-228, Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2022-10-26026 October 2022 Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-22-200, Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage2022-10-21021 October 2022 Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage L-22-232, Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes2022-10-21021 October 2022 Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes L-22-238, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-10-20020 October 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-227, Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins2022-10-0303 October 2022 Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins L-22-219, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-09-26026 September 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-204, Submittal of Evacuation Time Estimates2022-09-0707 September 2022 Submittal of Evacuation Time Estimates L-22-137, Request for Fire Protection Program Changes2022-09-0606 September 2022 Request for Fire Protection Program Changes L-21-238, License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident2022-08-31031 August 2022 License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident L-22-188, Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage2022-08-22022 August 2022 Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage L-22-191, Spent Fuel Storage Cask Registration2022-08-17017 August 2022 Spent Fuel Storage Cask Registration 2023-09-14
[Table view] |
Text
FENOC FirstEnergy Nuclear OperatingCompany Peter P. Sena III 724-682-5234 Site Vice President Fax: 724-643-8069 May 28, 2008 L-08-180 10 CFR 54 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Beaver Valley Power Station, Unit Nos. 1 and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC Nos. MD6593 and MD6594)
Reference 1 provided the FirstEnergy Nuclear Operating Company (FENOC) License Renewal Application (LRA) for the Beaver Valley Power Station (BVPS). Reference 2 requested additional information from FENOC regarding BVPS license renewal time-limited aging analyses in Section 4.2.4 of the BVPS LRA.
The Attachment provides the FENOC reply to the U.S. Nuclear Regulatory Commission request for additional information.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Clifford I. Custer, Fleet License Renewal Project Manager, at 724-682-7139.
I declare under penalty of perjury that the foregoing is true and correct. Executed on May V_, 2008.
Sincerely, Peter P. Sena III
f-Beaver Valley Power Station, Unit Nos. 1 and 2 L-08-180 Page 2
References:
- 1. FENOC Letter L-07-113, "License Renewal Application," August 27, 2007.
- 2. NRC Letter, "Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC Nos.
MD6593 and MD6594)," April 28, 2008.
Attachment:
Reply to Request for Additional Information Regarding Beaver Valley Power Station, Units 1 and 2, License Renewal Application, Section 4.2.4 cc: Mr. K. L. Howard, NRC DLR Project Manager Mr. S. J. Collins, NRC Region I Administrator cc: w/o Attachment Dr. S. S. Lee, NRC DLR Acting Director Mr. D. L. Werkheiser,, NRC Senior Resident Inspector Ms. N. S.'Morgan, NRC DORL Project Manager Mr. D. J. Allard, PA BRP/DEP Director Mr. L. E. Ryan, PA BRP/DEP
ATTACHMENT L-08-180 Reply to Request for Additional Information Regarding Beaver Valley Power Station, Units 1 and 2, License Renewal Application, Section 4.2.4 Page 1 of 2 Question RAI 4.2.4-1 In the BVPS, LRA, it is not readily apparent if the Low-Temperature Overpressure Protection System (OPPS) was affected by recent plant changes (extended power uprates). The applicant states that, "As part of any update, the OPPS setpoints (OPPS enable temperature and power-operated relief valve setpoints) for both units are reviewed and updated as required based on the updated P-T limit curves." Please provide additional details or documentation to show if the OPPS itself was/was not affected by the extended power uprate.
RESPONSE RAI 4.2.4-1 The Low-Temperature Overpressure Protection System (OPPS) analyses for Beaver Valley Power Station (BVPS), Unit 1 and Unit 2, have been updated to include extended power uprate (uprate to 2900 MWt) conditions.
Unit 1 The current BVPS Unit 1 Pressure and Temperature Limits Report (PTLR) is revision 4 (Reference 1). This revision changed the applicability of the heatup and cooldown requirement to 30 effective full power years (EFPY), and included changes to reflect the corresponding OPPS analysis. WCAP-16799-NP (Reference 2) documented the generation of the Unit 1 pressure-temperature (P-T) limit curves for 30 EFPY, and the resulting P-T limit curves were used as inputs to revision 4 of the Unit 1 PTLR and the corresponding OPPS analysis. The P-T limit curves in WCAP-1 6799-NP were based on updated dosimetry analyses that accounted for the increase in neutron fluence as a result of the extended power uprate. Therefore, the Unit 1 OPPS analysis has been updated to include extended power uprate conditions.
Unit 2 The BVPS Unit 2 PTLR, revision 1 (Reference 3), contained editorial changes to reflect the Technical Specifications and Licensing Requirements that reference the PTLR.
This revision to the Unit 2 PTLR also included changes to reflect the Capsule W analysis and corresponding OPPS analysis. The applicability of the heatup and cooldown requirement remained at 22 EFPY in revision 1 of the PTLR. WCAP-15677 (Reference 4) documented the generation of the P-T limit curves for 22 EFPY, and the resulting P-T limit curves were used as inputs to revision 1 of the Unit 2 PTLR and the corresponding OPPS analysis. The P-T limit curves in WCAP-1 5677 were based on
Attachment L-08-180 Page 2 of 2 updated dosimetry analyses that accounted for the increase in neutron fluence as a result of the extended power uprate (uprate to 2900 MWt). Therefore, the Unit 2 OPPS analysis has been updated to include extended power uprate (uprate to 2900 MWt) conditions.
The current BVPS Unit 2 PTLR is revision 2 (Reference 5), and was associated with the implementation of the BVPS Improved Technical Specification conversion License Amendment for Unit 2. The applicability of the heatup and cooldown requirement remained at 22 EFPY.
References:
- 1. FENOC Letter L-07-130, "Beaver Valley Power Station, Unit No. 1, Unit 1 Pressure and Temperature Limits Report, Revision 4," September 19, 2007 (ML072670026).
- 2. WCAP-16799-NP, "Beaver Valley Power Station Unit1 Heatup and Cooldown Limit Curves for Normal Operation," Revision 1, June 2007.
- 3. FENOC Letter L-05-063, "Beaver Valley Power Station, Unit Nos. 1 and 2, Pressure and Temperature Limits Report, Revision 1," March 31, 2005 (ML050960554).
- 4. WCAP-1 5677, "Beaver Valley Unit 2 Heatup and Cooldown Limit Curves for Normal Operation,',' August 2001.
- 5. FENOC Letter L-07-087, "Beaver Valley Power Station, Unit No. 2, Core Operating Limits Report, COLR 13-2, Pressure and Temperature Limits Report, Revision 2,"
June 25, 2007 (ML071790328).