July 23, 2015, Summary of Meeting with Representatives of the U.S. Army Corps, U.S. Nuclear Regulatory Commission and First Energy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Station
ML15225A481
Person / Time
Site: Beaver Valley
Issue date: 08/14/2015
From: Juan Uribe
Japan Lessons-Learned Division
To:
First Energy Services
Uribe, Juan 415-3809
References
TAC MF3286, TAC MF3287
Download: ML15225A481 (3)


Text

LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Beaver Valley Power Station, Units 1 and 2

SUBJECT:

SUMMARY

OF JULY 23, 2015, MEETING BETWEEN REPRESENTATIVES OF THE U.S. ARMY CORPS OF ENGINEERS, U.S. NUCLEAR REGULATORY COMMISSION, AND FIRSTENERGY NUCLEAR OPERATING CO. TO DISCUSS FLOODING ANALYSIS ASSOCIATED WITH BEAVER VALLEY POWER STATION, UNITS 1AND2 (TAC NOS. MF3286 AND MF3287)

On July 23, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff held a closed meeting with the U.S. Army Corps of Engineers (USAGE) and FirstEnergy Nuclear Operating Company (FENOC, the licensee) to discuss the flooding hazard reevaluation report (FHRR) for the Beaver Valley Power Station, Units 1 and 2 (BVPS, Beaver Valley). The meeting was held at USACE's offices in Pittsburgh, Pennsylvania. The closed meeting notice dated July 20, 2015, can be found in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML15201A481. The participants in the meeting included the following individuals:

  • USAGE - Lieutenant Colonel Gerald R. Dull, MAJ Kimberly Giles, Jeanine Hoey, Dennis Zeveney, Sara Weida, Bill Lenart, Roger Kay, Teresa Reinig, Chris Fassero
  • FENOC - Colin Keller, Greg Halnon, Eric P. Hohman, Steve Osting, Phil Lashley, Carmen Mancuso and Eugene Ebeck,
  • FENOC contractors (Enercon) - Kurt Roblyer The purpose of the meeting was to discuss the portion of the FHRR the USAGE is developing under contract to the NRC for BVPS. By letter dated December 17, 2013 (ADAMS Accession No. ML13353A566), FENOC requested NRC assistance in having the USAGE perform a dam failure analysis to support FENOC's development of an FHRR in response to the March 12, 2012, request for information (ADAMS Accession No. ML12073A348).

The USAGE and NRC provided FE NOC with pre-final results of the USAGE basin-wide probable maximum flood analysis and discussed the hydrographs being developed for the Beaver Valley site prior to the NRC issuing the results of the USAGE analysis to the licensee.

The NRC stated that it expects to issue the results to FENOC by the end of August 2015. The licensee had an opportunity to comment and ask questions during the meeting and no follow up questions remained.

The USAGE and FENOC were provided an opportunity to comment on this summary prior to its issuance for completeness and accuracy of information. Any comments received were addressed and incorporated, as applicable, in the final version of this summary.

Please direct any inquiries to me at 301-415-3809 ov

/~1,,

~ **;

'v \..,/'~

Juan ribe, Project Manager Hazar anagement Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: Distribution via ListServ

The USAGE and FENOC were provided an opportunity to comment on this summary prior to its issuance for completeness and accuracy of information. Any comments received were addressed and incorporated, as applicable, in the final version of this summary.

Please direct any inquiries to me at 301-415-3809 or at Juan.Uribe@nrc.gov IRA/

Juan Uribe, Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: Distribution via ListServ DISTRIBUTION:

PUBLIC JOMB R/F RidsNrrDorllpl 1-2 Resource RidsNRRPMBeaverValley CCook, NRO ACampbell, NRO BHarvey, NRO KSee, NRO A DA MSAccession Nos.: M eetin~ Not1ce. ML15201A481 M eetmg s ummarv ML15225A481 OFFICE NRR/JLD/JHMB/PM NRR/JLD/JHMB/LA NRR/JLD/JHMB/BC NRR/JLD/JHMB/PM NAME JUribe SLent MShams JUribe DATE 08/13/15 08/13/15 08/14/15 08/14/15 OFFICIAL RECORD COPY