MONTHYEARL-13-395, Request for NRC Assistance to Obtain Information from the U.S. Army Corps of Engineers (Usace) Related to Dam Failure Analysis2013-12-17017 December 2013 Request for NRC Assistance to Obtain Information from the U.S. Army Corps of Engineers (Usace) Related to Dam Failure Analysis Project stage: Request ML14184B1962014-08-14014 August 2014 Summary of June 18, 2014, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, Nuclear Regulatory Commission, and Firstenergy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Stat Project stage: Meeting ML15110A4062015-04-23023 April 2015 Notice of Closed Meeting with FENOC on Beaver Valley Project stage: Request ML15135A2982015-05-21021 May 2015 Summary of April 28, 2015, Meeting Between Representatives of the U.S. Army Corps of Engineers, Nuclear Regulatory Commission, and First Energy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Station, Project stage: Meeting ML15201A4812015-07-20020 July 2015 Notice of Forthcoming Closed Meeting to Discuss Basin-Wide Probable Maximum Flood Analysis for Beaver Valley Power Station, Units 1 and 2 Project stage: Request ML15225A4812015-08-14014 August 2015 July 23, 2015, Summary of Meeting with Representatives of the U.S. Army Corps, U.S. Nuclear Regulatory Commission and First Energy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Station Project stage: Meeting ML15254A2732015-09-10010 September 2015 Transmittal of U.S. Army Corps of Engineers Flood Hazard Reevaluation Information Project stage: Other ML16063A2882016-03-0202 March 2016 Response to NRC Request for Additional Information, Per 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-ichi Accident Project stage: Response to RAI ML16105A2112016-04-26026 April 2016 Nrc'S Plan for the Audit of First Energy Nuclear Operating Company'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1-Flooding for Beaver Valley Power Station, Units 1 and 2 (TAC Nos. MF3286 Project stage: Other 2015-07-20
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23135A7872023-05-19019 May 2023 Summary of Conference Calls Regarding the Spring 2023 Steam Generator Tube Inspections ML23026A3552023-01-31031 January 2023 Summary of Public Meeting with Energy Harbor Nuclear Corp. Regarding Beaver Valley Power Station License Amendment Request to Consolidate Fuel Decay Time TS Into New Limiting Condition for Operation ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML22105A3932022-04-20020 April 2022 Summ. of March 17, 2022, Public Meeting with Ehnc Regarding Planned License Amendment Request to Consolidate Fuel Decay Time Requirements in a New Limiting Condition for Operation for Beaver Valley Power Station, Units 1 and 2 ML22053A2982022-02-25025 February 2022 Summary of the February 15, 2022, Meeting with Energy Harbor Nuclear Corp. Regarding the License Amendment Request Related to Revising TS 5.6.3 Core Operating Limits Report (COLR) ML21308A0712021-11-0909 November 2021 Summary of Teleconference with Energy Harbor Nuclear Corp. Regarding Fall 2021 Steam Generator Inspections at Beaver Valley Power Station, Unit 2 ML20197A2722020-07-15015 July 2020 2020 Beaver Valley, Calvert Cliffs, Limerick Peach Bottom, Susquehanna Annual Assessment Webinar Summary ML20148M3852020-06-0101 June 2020 Summary of May 26, 2020, Public Meeting with Energy Harbor Nuclear Corp. Potential License Amendment Request Related to Steam Generator Tube Sleeve Inspections and Maintenance ML20122A0032020-05-19019 May 2020 Summary of April 22, 2020, Teleconference with Energy Harbor Nuclear Corp. Regarding Spring 2020 Steam Generator Inspections at Beaver Valley Power Station, Unit 2 ML20111A0142020-04-27027 April 2020 Summary of March 31, 2020, Public Meeting with Energy Harbor Nuclear Corp. to Discuss COVID-19 Potential Submittals of Regulatory Actions ML16125A5072019-10-22022 October 2019 Ti 191 Issue Matrix ML19280A0382019-10-22022 October 2019 Ti 2515-191 Summary of Findings ML19191A1882019-07-0909 July 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - Meeting Summary ML18325A0232018-11-28028 November 2018 Summary of Teleconference with Firstenergy Nuclear Operating Company Regarding Fall 2018 Steam Generator Inspections at Beaver Valley Power Station, Unit 2 ML18099A0812018-04-0606 April 2018 Bv Annual Assessment Meeting Summary and Attendance List 2018 ML17347A8082017-12-20020 December 2017 December 5, 2017, Summary of Public Meeting with Firstenergy Nuclear Operating Company to Discuss a Proposed License Amendment Request Extending Sleeve Life on the Steam Generator at Beaver Valley Power Station, Unit 2 ML17158B1662017-06-0909 June 2017 Summary of Meeting with Firstenergy Nuclear Operating Company Regarding the Spring 2017 Steam Generator Inspections at Beaver Valley Power Station, Unit 2 ML17082A1842017-03-28028 March 2017 March 20, 2017, Summary of Annual Assessment Meeting with Beaver Valley, Units 1 and 2 ML16250A5012016-10-0303 October 2016 Summary of August 30, 2016, Meeting with Firstenergy Nuclear Operating Company Regarding Planned Submittal of Emergency Action Level Scheme Change ML16105A0082016-04-25025 April 2016 March 30, 2016, Summary of Meeting with Firstenergy Nuclear Operating Company on Its Draft Probabilistic Risk Assessment RAI Related to Its License Amendment Request to Adopt NFPA Standard 805 ML16091A0702016-03-31031 March 2016 2016 Beaver Valley Annual Assessment Meeting Summary 2016 ML15320A3912015-11-24024 November 2015 Summary of Conference Call Regarding the Fall 2015 Steam Generator Inspections ML15225A4812015-08-14014 August 2015 July 23, 2015, Summary of Meeting with Representatives of the U.S. Army Corps, U.S. Nuclear Regulatory Commission and First Energy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Station ML15135A2982015-05-21021 May 2015 Summary of April 28, 2015, Meeting Between Representatives of the U.S. Army Corps of Engineers, Nuclear Regulatory Commission, and First Energy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Station, ML15104A6652015-04-14014 April 2015 April 9, 2015 Summary of Annual Assessment Meeting with Beaver Valley Power Station, Units 1 and 2 ML14325A7782014-12-16016 December 2014 October 6, 2014, Summary of Pre-Application Meeting with Firstenergy Nuclear Operating Company to Discuss Proposed Combination of Site Emergency Plans ML14184B1962014-08-14014 August 2014 Summary of June 18, 2014, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, Nuclear Regulatory Commission, and Firstenergy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Stat ML14160B1032014-07-10010 July 2014 June 6, 2014 Summary of Meeting with FENOC Flooding Hazard Reevaluation Extension Request for Beaver Valley Power Station, Units 1 and 2 and Flooding Hazard Reevaluation Report for Davis-Besse Nuclear Power Station, Unit 1 ML14142A0872014-06-0909 June 2014 Summary of Conference Call Regarding the Spring 2014 Steam Generator Inspections ML14099A1732014-04-0909 April 2014 Annual Assessment Meeting Summary, ROP14 ML13295A2182013-10-22022 October 2013 Summary of Public Meeting with Beaver Valley, ML13114A2072013-04-22022 April 2013 Summary of Annual Assessment Meeting at Beaver Valley ML13057A6782013-03-11011 March 2013 2/20/2013 - Summary of Meeting with Firstenergy Nuclear Operating Company to Discuss Proposed Request for Additional Information Response Regarding Beaver Valley Power Station End-of-Life Moderator Temperature Coefficient Testing ML12321A3012012-11-29029 November 2012 Summary of November 15, 2012, Meeting with Firstenergy Nuclear Operating Company to Discuss Upcoming License Amendment Request Relating to the Implementation of the Alternate Pressurized Thermal Shock Rule ML12310A0662012-11-13013 November 2012 Summary of Conference Call with Firstenergy Nuclear Operating Company to Discuss 2012 Steam Generator Tube Inspections ML12293A0402012-11-0101 November 2012 October 18, 2012 - Summary of Meeting with Firstenergy Nuclear Operating Company to Discuss Request for Additional Information Regarding Fenoc'S Extension Request for Upcoming Beaver Valley Power Station National Fire Protection Association ML12277A4082012-10-0303 October 2012 September 26, 2012, Summary of Public Meeting to Discuss FENOC Fleet Performance ML12223A4672012-08-22022 August 2012 August 1, 2012 - Summary of Meeting with FENOC to Discuss Upcoming National Fire Protection Association Standard 805 License Amendment Request Status ML12195A1132012-07-16016 July 2012 Summary of Public Meeting with FENOC Regarding Licensing Practices and Processes ML12104A1052012-04-13013 April 2012 Meeting Summary of Annual Assessment Meeting on March 22, 2012 ML1115805152011-06-15015 June 2011 (BVPS-2) - Summary of Conference Call Regarding the Spring 2011 Steam Generator Tube Inspection Results ML1112504622011-05-0505 May 2011 Summary of Annual Assessment Open House Public Meeting, Beaver Valley ML1035606612010-12-29029 December 2010 Summary of Beaver Valley Power Station, Unit 2 Public Conference Call Regarding Spent Fuel Pool Rerack LAR Draft RAI Responses Discussion ML1027903512010-10-18018 October 2010 Summary of Meeting with Firstenergy Nuclear Operating Company, on the Request for Additional Resposnses Regarding the Spent Fuel Rerack for Beaver Valley Power Station, Unit No. 2 ML1014105172010-05-21021 May 2010 Summary of the May 2010 Annual Assessment Open-House Public Meeting ML1013206652010-05-18018 May 2010 Summary of Category 1 Teleconference with Firstenergy Nuclear Operating Company to Discuss NRC Request for Additional Information Regarding Generic Letter 2004-02 ML1009502432010-04-0505 April 2010 Meeting Summary of 3-31-10 Public Meeting with FENOC ML0931407282009-11-18018 November 2009 Steam Generator Tube Inspections 2024-06-03
[Table view] |
Text
LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Beaver Valley Power Station, Units 1 and 2
SUBJECT:
SUMMARY
OF JULY 23, 2015, MEETING BETWEEN REPRESENTATIVES OF THE U.S. ARMY CORPS OF ENGINEERS, U.S. NUCLEAR REGULATORY COMMISSION, AND FIRSTENERGY NUCLEAR OPERATING CO. TO DISCUSS FLOODING ANALYSIS ASSOCIATED WITH BEAVER VALLEY POWER STATION, UNITS 1AND2 (TAC NOS. MF3286 AND MF3287)
On July 23, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff held a closed meeting with the U.S. Army Corps of Engineers (USAGE) and FirstEnergy Nuclear Operating Company (FENOC, the licensee) to discuss the flooding hazard reevaluation report (FHRR) for the Beaver Valley Power Station, Units 1 and 2 (BVPS, Beaver Valley). The meeting was held at USACE's offices in Pittsburgh, Pennsylvania. The closed meeting notice dated July 20, 2015, can be found in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML15201A481. The participants in the meeting included the following individuals:
- USAGE - Lieutenant Colonel Gerald R. Dull, MAJ Kimberly Giles, Jeanine Hoey, Dennis Zeveney, Sara Weida, Bill Lenart, Roger Kay, Teresa Reinig, Chris Fassero
- FENOC - Colin Keller, Greg Halnon, Eric P. Hohman, Steve Osting, Phil Lashley, Carmen Mancuso and Eugene Ebeck,
- FENOC contractors (Enercon) - Kurt Roblyer The purpose of the meeting was to discuss the portion of the FHRR the USAGE is developing under contract to the NRC for BVPS. By letter dated December 17, 2013 (ADAMS Accession No. ML13353A566), FENOC requested NRC assistance in having the USAGE perform a dam failure analysis to support FENOC's development of an FHRR in response to the March 12, 2012, request for information (ADAMS Accession No. ML12073A348).
The USAGE and NRC provided FE NOC with pre-final results of the USAGE basin-wide probable maximum flood analysis and discussed the hydrographs being developed for the Beaver Valley site prior to the NRC issuing the results of the USAGE analysis to the licensee.
The NRC stated that it expects to issue the results to FENOC by the end of August 2015. The licensee had an opportunity to comment and ask questions during the meeting and no follow up questions remained.
The USAGE and FENOC were provided an opportunity to comment on this summary prior to its issuance for completeness and accuracy of information. Any comments received were addressed and incorporated, as applicable, in the final version of this summary.
Please direct any inquiries to me at 301-415-3809 ov
/~1,,
~ **;
'v \..,/'~
Juan ribe, Project Manager Hazar anagement Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: Distribution via ListServ
The USAGE and FENOC were provided an opportunity to comment on this summary prior to its issuance for completeness and accuracy of information. Any comments received were addressed and incorporated, as applicable, in the final version of this summary.
Please direct any inquiries to me at 301-415-3809 or at Juan.Uribe@nrc.gov IRA/
Juan Uribe, Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: Distribution via ListServ DISTRIBUTION:
PUBLIC JOMB R/F RidsNrrDorllpl 1-2 Resource RidsNRRPMBeaverValley CCook, NRO ACampbell, NRO BHarvey, NRO KSee, NRO A DA MSAccession Nos.: M eetin~ Not1ce. ML15201A481 M eetmg s ummarv ML15225A481 OFFICE NRR/JLD/JHMB/PM NRR/JLD/JHMB/LA NRR/JLD/JHMB/BC NRR/JLD/JHMB/PM NAME JUribe SLent MShams JUribe DATE 08/13/15 08/13/15 08/14/15 08/14/15 OFFICIAL RECORD COPY