Letter Sequence RAI |
---|
|
Results
Other: L-08-123, Drawing Lr 1-46-2, Rev. 5, Post DBA Hydrogen Analyzer System., L-08-189, Drawing Lr 2-27A-2, Rev. 4, Auxiliary Steam and Condensate System (Ass)., L-08-261, Schedule for Submittal of Annual Update for License Renewal Application, L-08-262, Drawing, Lr Drawing 2-31-1, Rev. 5, Demineralized Water System (Wtd)., L-08-263, Submittal of Revision to License Renewal Application Amendment No. 24, L-08-292, Lr Drawing 1-21-1, Rev. 7, Main Steam System (Ms)., L-08-316, License Renewal Application Amendment No. 26 (TAC Nos. MD6593 and MD6594), Revisions, L-08-393, License Renewal Application, Amendment No. 33, L-09-058, Comments on Safety Evaluation Report with Open Item Related to the License Renewal, L-09-138, License Renewal Application, Amendment No. 36, L-09-151, License Renewal Application Amendment No. 37, ML081000322, ML081000323, ML081000324, ML081000326, ML081000327, ML081000328, ML081000329, ML081000330, ML081000331, ML081000332, ML081640592, ML081640593, ML081640594, ML081640596, ML081640597, ML081640598, ML081640599, ML081640600, ML081640601, ML081640602, ML081640603, ML081640604, ML082550686, ML082550687, ML082550688, ML083010249, ML092740576, ML092920050, NRC-2009-0496, Beaver Valley Federal Register Notice - Record of Decision to Renew License
|
MONTHYEARL-07-130, Submittal of Pressure and Temperature Limits Report, Revision 42007-09-19019 September 2007 Submittal of Pressure and Temperature Limits Report, Revision 4 Project stage: Request ML0805902622008-03-0303 March 2008 Request for Additional Information, License Renewal Application (TAC Nos. MD6593 and MD6594) Project stage: RAI ML0806402162008-03-0505 March 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 and 2, LRA Project stage: RAI ML0806010202008-03-0505 March 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 & 2, LRA Project stage: RAI ML0807202882008-03-21021 March 2008 Request for Additional Information, Section B.2.35 Project stage: RAI ML0807907442008-03-26026 March 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application, for Sections B.2.6, B.2.19, and B.2.23 Project stage: RAI L-08-122, Reply to Request for Additional Information for the Review of the License Renewal Application and Revisions to License Renewal Application Boundary Drawings2008-03-31031 March 2008 Reply to Request for Additional Information for the Review of the License Renewal Application and Revisions to License Renewal Application Boundary Drawings Project stage: Response to RAI ML0807903922008-04-0101 April 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 & 2, LRA Project stage: RAI ML0807905382008-04-0101 April 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 & 2, LRA Project stage: RAI L-08-124, Reply to Request for Additional Information for Review of the License Renewal Application and License Renewal Application Amendment No. 52008-04-0202 April 2008 Reply to Request for Additional Information for Review of the License Renewal Application and License Renewal Application Amendment No. 5 Project stage: Response to RAI ML0807907352008-04-0303 April 2008 RAI for the Reveiw of the Beaver Valley, Units 1 and 2, License Renewal Application Project stage: RAI ML0810002962008-04-0303 April 2008 Reply to Request for Additional Information for the Review of License Renewal Application, Amendment No. 4, and Revised License Renewal Boundary Drawings Project stage: Response to RAI ML0810003222008-04-0303 April 2008 Drawing Lr 1-07-2, Rev. 4, Chemical and Volume Control System. Project stage: Other ML0810003232008-04-0303 April 2008 Drawing Lr 1-07-3, Rev. 6, Chemical and Volume Control System. Project stage: Other ML0810003242008-04-0303 April 2008 Drawing Lr 1-08-1, Rev. 4, Boron Recovery Degasifiers. Project stage: Other ML0810003262008-04-0303 April 2008 Drawing Lr 1-09-2, Rev. 4, Vent and Drain System. Project stage: Other ML0810003272008-04-0303 April 2008 Drawing Lr 1-12-1, Rev. 5, Containment Vacuum and Leakage Monitoring System. Project stage: Other ML0810003282008-04-0303 April 2008 Drawing Lr 1-14A-1, Rev. 7, Sample System. Project stage: Other ML0810003292008-04-0303 April 2008 Drawing Lr 1-14A-2, Rev. 5, Sample System. Project stage: Other ML0810003302008-04-0303 April 2008 Drawing Lr 1-19-1, Rev. 5, Gaseous Waste Disposal System. Project stage: Other ML0810003322008-04-0303 April 2008 Drawing Lr 1-30-1, Rev. 5, River Water System. Project stage: Other L-08-123, Drawing Lr 1-46-2, Rev. 5, Post DBA Hydrogen Analyzer System.2008-04-0303 April 2008 Drawing Lr 1-46-2, Rev. 5, Post DBA Hydrogen Analyzer System. Project stage: Other ML0810003312008-04-0303 April 2008 Drawing Lr 1-24-1, Rev. 6, Feedwater System. Project stage: Other ML0809804832008-04-17017 April 2008 Request for Additional Information, Review of License Renewal Application Project stage: RAI ML0810503332008-04-17017 April 2008 Request for Additional Information, Review of License Renewal Application Project stage: RAI L-08-143, Reply to Request for Additional Information for Review of License Renewal Application and License Renewal Application Amendment No. 62008-04-18018 April 2008 Reply to Request for Additional Information for Review of License Renewal Application and License Renewal Application Amendment No. 6 Project stage: Response to RAI L-08-144, Reply to Request for Additional Information for the Review of License Renewal Application2008-04-25025 April 2008 Reply to Request for Additional Information for the Review of License Renewal Application Project stage: Response to RAI ML0811303942008-04-28028 April 2008 Request for Additional Information, Review of License Renewal Application Project stage: RAI ML0810502702008-04-30030 April 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: RAI L-08-146, Reply to Request for Additional Information for Review, License Renewal Application and License Renewal Application Amendment No. 72008-04-30030 April 2008 Reply to Request for Additional Information for Review, License Renewal Application and License Renewal Application Amendment No. 7 Project stage: Response to RAI L-08-174, Request for Revised Submittal Date for Reply to Request for Additional Information for the Review of the License Renewal Application2008-05-0202 May 2008 Request for Revised Submittal Date for Reply to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI L-08-149, Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application2008-05-0505 May 2008 Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: Response to RAI ML0814104162008-05-0808 May 2008 Transmittal of Correction to Reply to RAI for the Review of License Renewal Application, License Renewal Application Amendment No. 8 & Revised License Renewal Boundary Drawings Project stage: Request ML0810505432008-05-0808 May 2008 Request for Additional Information, Sections 3.5.2.2, B.2.1, B.2.3 and 4.6 of License Renewal Application Project stage: RAI ML0811604672008-05-0808 May 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0812009202008-05-0808 May 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC MD6593 and MD6594) Project stage: RAI ML0811205392008-05-15015 May 2008 Request for Additional Information, License Renewal Application (TAC Nos. MD6593 and MD6594) Project stage: RAI ML0814405432008-05-19019 May 2008 Reply to Request for Additional Information for the Review of the License Renewal Application Amendment No. 9. and Revised License Renewal Boundary Drawings Project stage: Response to RAI L-08-169, Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application2008-05-19019 May 2008 Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: Response to RAI ML0811304122008-05-22022 May 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0813605572008-05-22022 May 2008 Revision of Schedule for the Conduct of Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: Approval ML0811505772008-05-28028 May 2008 Request for Additional Information for Sections B.2.27, 4.3 and 4.7.4 of the BVPS LRA Project stage: RAI L-08-180, Reply to Request for Additional Information for the Review of the License Renewal Application2008-05-28028 May 2008 Reply to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI L-08-147, Reply to Request for Additional Information for Renewal License Application2008-06-0202 June 2008 Reply to Request for Additional Information for Renewal License Application Project stage: Response to RAI ML0814306872008-06-0404 June 2008 Request for Additional Information the Review of Beaver Valley, Units 1 and 2, License Renewal Application Project stage: RAI L-08-181, Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application, Amendment No. 102008-06-0606 June 2008 Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application, Amendment No. 10 Project stage: Response to RAI ML0816405052008-06-0909 June 2008 Reply to Request for Additional Information for the Review of the License Renewal Application License Renewal Application Amendment No. 11, and Revised License Renewal Boundary Drawings Project stage: Response to RAI ML0816405922008-06-0909 June 2008 Drawing Lr 1-14A-1, Rev. 8, Sample System (Ss). Project stage: Other ML0816405932008-06-0909 June 2008 Drawing Lr 1-21-1, Rev. 6, Main Steam System (Ms). Project stage: Other ML0816405942008-06-0909 June 2008 Drawing Lr 1-22-1, Rev. 4, Condensate System (Cn). Project stage: Other 2008-04-03
[Table View] |
|
---|
Category:Letter
MONTHYEARML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 IR 05000334/20230112023-12-0404 December 2023 Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports IR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20230032023-11-0606 November 2023 Integrated Inspection Report 05000334/2023003 and 05000412/2023003 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary IR 05000334/20234022023-09-29029 September 2023 Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000334/20234012023-09-21021 September 2023 Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) ML23263A0192023-09-20020 September 2023 Operator Licensing Examination Approval ML23243A9272023-09-19019 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23249A1842023-09-18018 September 2023 Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000334/20230052023-08-31031 August 2023 Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000334/20230022023-08-0909 August 2023 Integrated Inspection Report 05000334/2023002 and 05000412/2023002 ML23219A0592023-08-0707 August 2023 Steam Generator Inspection Reports - Spring 2023 Spring Refueling Outrage L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 ML23188A0982023-07-17017 July 2023 Correction to the Safety Evaluation Issued Related to Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23188A0672023-07-10010 July 2023 Project Manager Assignment L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report ML23157A1072023-06-0707 June 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000334/2023011 and 05000412/2023011 ML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23135A7872023-05-19019 May 2023 Summary of Conference Calls Regarding the Spring 2023 Steam Generator Tube Inspections L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report ML23124A3882023-05-16016 May 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Technical Specification 5.6.3, Core Operating Limits Reports (COLR) and TS 4.2.1 Fuel Assemblies ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000334/20230012023-05-0808 May 2023 Integrated Inspection Report 05000334/2023001 and 05000412/2023001 L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23118A3812023-04-28028 April 2023 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23107A2502023-04-18018 April 2023 Requalification Program Inspection 2024-01-25
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test ML23125A1462023-05-0505 May 2023 NRR E-mail Capture - Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23125A1602023-05-0505 May 2023 NRR E-mail Capture - Correction to Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23122A0342023-05-0202 May 2023 NRR E-mail Capture - Beaver Valley - Request for Additional Information Regarding Unit 1 - 180 Day Steam Generator Tube Inspection Report ML22312A5912022-11-0808 November 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1&2 - Request for Additional Information LAR to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML22278A0972022-10-0606 October 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Fire Protection Program Changes ML22178A1322022-06-24024 June 2022 Request for Additional Information for Beaver Valley Unit 2 Steam Generator Inspection Report - Fall 2021 Refueling Outage ML22068A1822022-03-0909 March 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1 & 2 - Request for Additional Information for License Amendment Request to Revise Technical Specification 3.3.5 ML22013A7512022-01-13013 January 2022 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000334/2022010 and 05000412/2022010 ML21292A0482021-10-19019 October 2021 Ti 2515/194 Inspection Documentation Request ML21259A1642021-09-16016 September 2021 NRR E-mail Capture - Request for Additional Information Regarding the LAR for Core Operating Limits ML21124A1322021-05-0404 May 2021 Notification of Conduct of a Fire Protection Team Inspection ML21102A1542021-04-0909 April 2021 Request for Additional Information (2nd Round) - Steam Generator Tube Sleeve LAR ML21082A4942021-03-23023 March 2021 Final RAIs for GL 04-02 Closure (Email) ML21068A3502021-03-0909 March 2021 Final Request for Additional Information for Reactor Coolant System (RCS) and Pressure and Tempature Limits Report(Ptlr) TS LAR ML21053A0252021-02-20020 February 2021 NRR E-mail Capture - Request for Additional Information (Rais) - LaSalle Request for Exemption from Pre-Access Drug and Alcohol Testing ML21015A5762021-01-14014 January 2021 Final RAIs for Steam Generator 180 Day Tube Inspection Report ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20290B0082020-10-0808 October 2020 Draft Request for Additional Information - Steam Generator Letter ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20072N0402020-03-12012 March 2020 Request for Additional Information - Control Envelope Habitability LAR ML19192A2222019-07-18018 July 2019 Request for Additional Information Regarding Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML19143A0732019-05-29029 May 2019 FENOC Fleet - Beaver Valley, Units 1 and 2; Davis-Besse, Unit 1, Perry, Unit 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action; Application for Order Consenting to License Transfer and Conforming Amendments ML18242A3642018-08-29029 August 2018 Request for Additional Information (Final) -Steam Generator Technical Specification LAR ML18102B0852018-04-12012 April 2018 NRR E-mail Capture - Follow-up Request for Additional Information (RAI) FENOC FLEET-- Exemption Request for a Physical Barrier Requirement for Beaver ML18043A0102018-02-0909 February 2018 NRR E-mail Capture - FENOC--MG0010-MG0011, MG-0012, MG0013-- Request for Additional Information (RAI) - Exemption Request Security Barrier in Physical Plans ML18024B3642018-01-24024 January 2018 NRR E-mail Capture - Beaver Valley 10 CFR 50.54(f) - NTTF 2.1 SPRA Review ML18019A0722018-01-18018 January 2018 NRR E-mail Capture - Beaver Valley Unit No. 1: Request for Additional Information - Modified Rtpts Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule ML17353A1582017-12-19019 December 2017 NRR E-mail Capture - Request for Additional Information: Beaver Valley Unit No. 1 - Proposed Alternative Request, 1-TYP-4-BA-01 ML17352B2612017-12-18018 December 2017 NRR E-mail Capture - Request for Additional Information: Beaver Valley Unit No. 1 - Proposed Alternative Request, 1-TYP-4-BA-01 ML17303B1582017-11-0707 November 2017 FENOC-Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, Perry Nuclear Power Plant Unit 1 - Generic Letter 2016-01, Request for Supplemental Information ML17256A2502017-09-13013 September 2017 NRR E-mail Capture - Beaver Valley Power Station Units 1&2: Request for Additional Information for Emergency Plan EAL Change to Adopt NEI 99-01, Rev. 6, ML17220A2342017-08-0808 August 2017 E-mail Regarding Request for Additional Information for NFPA 805 License Amendment Request ML17093A7622017-04-10010 April 2017 Request for Additional Information Regarding Emergency Action Level Scheme Change License Amendment Request ML17031A0362017-02-0303 February 2017 Request for Additional Information Regarding Relief Request Numbers PR6 and PR7 ML16333A0162016-12-0202 December 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML16147A2842016-06-14014 June 2016 Request for Additional Infomation Regarding Fall 2015 Refueling Steam Generator Tube Inspections ML16071A1222016-04-0707 April 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML16084A8442016-03-30030 March 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML16060A0122016-02-29029 February 2016 FENOC - Email RAI to Licensee Regarding LAR for Changes to TS 5.3.1 CAC Nos. MF7118, MF7119, and MF7120 ML15320A4132015-11-24024 November 2015 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML15280A0742015-10-0909 October 2015 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML15279A1252015-10-0505 October 2015 Licensed Operator Positive for Fitness-for-Duty-Test ML15181A2142015-07-14014 July 2015 Request for Additional Information Regarding License Amendment Request to Revise Steam Generator Technical Specifications to Reflect TSTF-510 and to Revise Alloy 800 Sleeve Technical Specifications (TAC Nos. MF6054 & MF6055) ML15125A4162015-05-11011 May 2015 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 (TAC Nos. MF3301 & MF3302) ML15016A4392015-01-20020 January 2015 Draft Request for Additional Information ML15007A5582015-01-15015 January 2015 Request for Additional Information Steam Generator Inspection Reports ML14218A7622014-12-11011 December 2014 RAI Request to Implement 10 CFR 50.61a Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events ML14316A3902014-11-14014 November 2014 Request for Additional Information Review of Licensee Security Plans 2023-05-05
[Table view] |
Text
March 5, 2008 Mr. Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-BV-SEB-1 P.O. Box 4, Route 168 Shippingport, PA 15077
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NO. MD6593, MD6594)
Dear Mr. Sena:
By letter dated August 27, 2007, FirstEnergy Nuclear Operating Company submitted an application pursuant to 10 CFR Part 54, to renew the operating licenses for Beaver Valley Power Station, Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.
Items in the enclosure were discussed with Mr. Cliff Custer of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-2989 or e-mail klh1@nrc.gov.
Sincerely,
/RA/
Kent L. Howard, Sr. Project Manager Reactor Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412
Enclosure:
As stated cc w/encl: See next page
ML080640216 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR NAME SFigueroa (MSayoc for) KHoward RFranovich DATE 3/4/08 3/4/08 3/5/08 BEAVER VALLEY POWER STATION (BVPS), UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (LRA)
REQUEST FOR ADDITIONAL INFORMATION (RAI)
RAI #1 Tables 4.2-5 and 4.2-6 of the Beaver Valley License Renewal Application (LRA) lists Chemistry Factor (CF) and pressurized thermal shock (PTS) reference temperature (RTPTS) values for several reactor vessel (RV) beltline materials that were calculated in accordance with both Regulatory Positions (RPs) 1.1 and 2.1 of Regulatory Guide (RG) 1.99, Rev. 2. Only one of these two RPs may be used for determining the actual CF, adjusted reference temperature (ART), and RTPTS values for each material. Therefore, please indicate which RP (RP 1.1 or RP 2.1) was used in determining the actual CF, ART, and RTPTS values for the RV beltline materials. Please provide justification for the selection of RP 1.1 or 2.1 for each material, based on factors such as surveillance data credibility or non-credibility, conservatism of RP 2.1 data, or other factors (i.e., NRC recommendation that non-credible surveillance data be used for calculating the CF for limiting plate B6903-1 with full ? margin of 17 °F).
RAI #2 For Beaver Valley, Unit 1 (Beaver Valley 1), the staff noted several discrepancies among LRA Section 4.2.2, LRA Table 4.2-5, Appendix D of WCAP-15571, Analysis of Capsule Y from First Energy Company Beaver Valley Unit 1 Reactor Vessel Radiation Surveillance Program, Rev. 0 (Surveillance Data Credibility Analysis), and WCAP-15571, Supplement 1, regarding the application of surveillance data for determining the RTPTS value for Intermediate Shell Longitudinal Weld 19-714 (Heat 305424).
First, Page D-5 of Appendix D of WCAP-15571 states: The surveillance weld [Heat 305424]
has two out of four data points outside the 28 °F scatter band. Hence, the surveillance data is not credible. Please reconcile this statement with the statement in the second paragraph of Page 4.2-6 of the LRA, which indicates that the data for the Unit 1 surveillance program weld material is deemed credible and the similar statement in Section 6.1 of Supplement 1 to WCAP-15571 indicating that the data for the surveillance program weld material is deemed credible. It should be noted in reconciling these statements that Intermediate Shell Longitudinal Weld 19-714 (Heat 305424) is represented in the Beaver Valley 1 surveillance program. However, a review of Appendix D of WCAP-15571 shows that two of the four surveillance data points (Capsules V and Y) fall outside of the 28 °F ?RTNDT scatter band.
Therefore, the surveillance weld data is not credible, and the CF for Weld 19-714 must be determined using RP 1.1.
Second, the second paragraph of Page 4.2-6 of the LRA states that the data for the Beaver Valley 1 surveillance program weld material was used with a OL115\f"SymbolPropBT"\s11?
margin of 14 °F. Likewise, Section 6.1 of Supplement 1 to WCAP-15571 indicates that The
[surveillance program weld] data was used with a ? margin of 14 °F. Please reconcile these statements with the 28 °F value for ? presented in Table 4.2-5 for Intermediate Shell ENCLOSURE
Longitudinal Weld 19-714, based on RP 2.1. It should be noted that, per RG 1.99, Rev. 2, the correct value for ? is 28 °F, based on RP 1.1, and the use of RP 2.1 is not permitted for this weld because the surveillance data is not credible. Furthermore, the use of a ? value of 14 °F is not permitted because the surveillance data is not credible.
RAI #3 Intermediate-to-Lower Shell Circumferential Weld 11-714 (Heat 90136) and Lower Shell Longitudinal Weld 20-714 (Heat 305414) are not represented in the Beaver Valley 1 surveillance program. However, CF and RTPTS values based on RP 2.1 were reported in Table 4.2-5 for these welds. Please confirm whether the heats for these welds are represented in the surveillance programs for St. Lucie (Heat 90136) and Fort Calhoun (Heat 305414).
The staff reviewed Revision 4 of the Beaver Valley 1 Pressure-Temperature Limits Report (PTLR), which was referenced in the LRA (LRA Section 4.2.6, Reference 4.2-8). Table 4.2-4a of the Beaver Valley 1 PTLR provides a note indicating that the use of the St. Lucie and Fort Calhoun surveillance capsule data was approved by the NRC by letter dated February 20, 2002.
Per your response to RAI Question 1, please indicate whether this surveillance data was used (per RP 2.1) in the determination of the actual CF, RTPTS, and ART values for these welds.
Please verify whether these surveillance data sets were deemed credible in accordance with RG 1.99, Rev. 2, and provide references for the documents where the analyses for determining credibility (or non-credibility) may be found.
Please indicate whether the CFs for these welds based on RP 2.1 (84.8 for Intermediate-to-Lower Shell Circumferential Weld 11-714 and 223.9 for Lower Shell Longitudinal Weld 20-714) were calculated by adjusting the measured ?RTNDT values by the ratio of the CF for the vessel weld to the CF for the surveillance weld, as prescribed in RG 1.99, Rev. 2. If the ?RTNDT values were properly adjusted for determining these CF values, please provide the CF ratio adjustment factors for these welds or a reference for the document where these adjustment factors may be obtained. If the ?RTNDT values were not adjusted for determining these CF values, please modify the Beaver Valley 1 PTLR and LRA Table 4.2-5 to include CF calculations based on RP 2.1 for these welds that account for this adjustment.
RAI #4 Table 4.2-5 of the Beaver Valley 1 PTLR (Rev. 4) states that the CF for Lower Shell Plate B6903-1 is 147.2 (based on RP 1.1). This is the incorrect CF for this plate, per the February 12, 1998 NRC-Industry meeting, where the NRC recommended that the non-credible surveillance data for this specific plate be used along with a full ? of 17 °F for RTPTS and ART calculations.
LRA Section 4.2.2 accurately reflects that the non-credible surveillance data and full ? of 17 °F were used to arrive at a 54 effective full power year (EFPY) RTPTS value of 275.7 °F, based on a RP 2.1 CF value of 149.2. Furthermore, Table 4.2-7 of the PTLR provides ART calculations for this limiting plate that are based on the correct CF value of 149.2 and states that these calculations are based on the non-credible plate surveillance data and full ? of 17 °F. Please modify Table 4.2-5 of the Beaver Valley 1 PTLR to reflect the correct CF (149.2) for Lower Shell Plate B6903-1. The application of surveillance data and selection of CFs for calculation of RTPTS and ART values in the Beaver Valley 1 PTLR should be consistent with the LRA.
RAI #5 LRA Section 4.2.2 states that a neutron flux management program is in place at Beaver Valley 1 for ensuring that the limiting material would meet the PTS screening requirements of 10 CFR 50.61 at the end of the current 40-year license term. Please verify whether the limiting material is projected to exceed the 270 °F screening limit of 10 CFR 50.61 in the year 2033 (43.87 EFPY) under this same flux management program. If the current flux management program will not maintain the limiting material below the PTS screening limit until 2033 (43.87 EFPY), please discuss any additional measures that are required to ensure that the limiting material does not exceed the PTS screening limit until 2033 (43.87 EFPY).
LRA Section 4.2.2 states that documentation of a flux reduction program for Beaver Valley 1 will be submitted in accordance with the requirements of 10 CFR 50.61. The staff requests that you provide a formal commitment to submit the appropriate documentation of your program for maintaining the limiting RV beltline plate (Plate B6903-1) below the 10 CFR 50.61 PTS screening criterion through the end of the period of extended operation (54 EFPY). This commitment must include a schedule for submitting this documentation relative to the projected date (year 2033, 43.87 EFPY) when the limiting material will exceed the 270 °F PTS screening limit.
Note: For the Palisades LRA, which documented a similar situation regarding PTS, the licensee provided Long Term Commitment No. 3, which reads as follows:
At the appropriate time, prior to exceeding the PTS screening criteria, Palisades will select the optimum alternative to manage PTS in accordance with the NRC regulations and make relevant submittals to obtain NRC review and approval.
RAI #6 The staff noted that the 54 EFPY Upper Shelf Energy (USE) value for the limiting plate at Beaver Valley 1 (Plate B6903-1) may be slightly less than 50 ft-lbs (lowest allowable USE value at EOL per 10 CFR Part 50, Appendix G), when calculated using Figure 2 from RG 1.99, Rev. 2, without applying the surveillance data. Please discuss why the surveillance data were deemed credible for determining the USE value for this plate, based on the five credibility criteria specified in Section B of RG 1.99, Rev. 2.
RAI #7 A review of Appendix D of WCAP-16527-NP indicates that the data for the surveillance weld at Beaver Valley 2 (Heat No. 83642) were not adjusted by the ratio of the CF for the vessel weld to the CF for the surveillance weld, as prescribed in RG 1.99, Rev. 2. Please verify that the copper and nickel content of the surveillance weld is identical to that for all vessel welds at Beaver Valley 2. If there is a difference between the chemistry of the surveillance weld and that of the vessel welds, please modify LRA Section 4.2.2, LRA Table 4.2-6, and the Beaver Valley 2 PTLR to account for the CF ratio adjustment.
RAI #8 LRA Section 4.2.2, LRA Table 4.2-6, and WCAP-16527-NP, Supplement 1 all incorporate data from the evaluation of surveillance capsules U, V, W and X for Beaver Valley 2. However the Beaver Valley 2 PTLR (Rev. 2) only incorporates data from the evaluation surveillance capsules U, V, and W. As the Beaver Valley 2 PTLR forms part of the basis for the Beaver Valley LRA, the staff requests that you update the Beaver Valley 2 PTLR to incorporate the results from the evaluation of surveillance capsule X. The application of surveillance data and selection of CFs for calculation of RTPTS and ART values in the Beaver Valley 2 PTLR should be consistent with the LRA.
Letter to P. Sena from K. Howard, dated March 5, 2008 DISTRIBUTION:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NO. MD6593, MD6594)
HARD COPY:
DLR RF E-MAIL:
PUBLIC SSmith (srs3)
SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDciCvib RidsNrrDciCpnb RidsNrrDraAfpb RidsNrrDeEmcb RidsNrrDeEeeb RidsNrrDssSbwb RidsNrrDssSbpb RidsNrrDssScvb RidsOgcMailCenter KHoward ESayoc PBuckberg NMorgan MModes, RI PCataldo, RI DWerkheiser, RI
Beaver Valley Power Station, Units 1 and 2 cc:
Joseph J. Hagan Ohio EPA-DERR President and Chief Nuclear Officer ATTN: Zack A. Clayton FirstEnergy Nuclear Operating Company P.O. Box 1049 Mail Stop A-GO-19 Columbus, OH 43266-0149 76 South Main Street Akron, OH 44308 Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company James H. Lash Mail Stop A-GO-2 Senior Vice President of Operations 76 South Main Street and Chief Operating Officer Akron, OH 44308 FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 Manager, Site Regulatory Compliance 76 South Main Street FirstEnergy Nuclear Operating Company Akron, OH 44308 Beaver Valley Power Station Mail Stop A-BV-A Danny L. Pace P.O. Box 4, Route 168 Senior Vice President, Fleet Engineering Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 Commissioner James R. Lewis 76 South Main Street West Virginia Division of Labor Akron, OH 44308 749-B, Building No. 6 Capitol Complex Jeannie M. Rinckel Charleston, WV 25305 Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Director, Utilities Department Mail Stop A-GO-14 Public Utilities Commission 76 South Main Street 180 East Broad Street Akron, OH 44308 Columbus, OH 43266-0573 David W. Jenkins, Attorney Director, Pennsylvania Emergency FirstEnergy Nuclear Operating Company Management Agency Mail Stop A-GO-15 2605 Interstate Drive 76 South Main Street Harrisburg, PA 17110-9364 Akron, OH 44308 Dr. Judith Johnsrud Manager, Fleet Licensing Environmental Coalition on Nuclear Power FirstEnergy Nuclear Operating Company Sierra Club Mail Stop A-GO-2 433 Orlando Avenue 76 South Main Street State College, PA 16803 Akron, OH 44308 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection
Beaver Valley Power Station, Units 1 and 2 cc:
Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077 Cliff Custer FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077 Mike Banko FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077 Julie Firestone FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077