Summary of Beaver Valley Power Station, Unit 2 Public Conference Call Regarding Spent Fuel Pool Rerack LAR Draft RAI Responses Discussion
ML103560661
Person / Time
Site: Beaver Valley
Issue date: 12/29/2010
From: Nadiyah Morgan
Plant Licensing Branch 1
To:
Morgan N, NRR/DORL, 415-1016
References
TAC ME1079
Download: ML103560661 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 29, 2010 LICENSEE:

FirstEnergy Nuclear Operating Company FACILITY:

Beaver Valley Power Station, Unit No.2

SUBJECT:

SUMMARY

OF DECEMBER 15,2010, CATEGORY 1 PUBLIC CONFERENCE CALL WITH FIRSTENERGY NUCLEAR OPERATING COMPANY ON THE REQUEST FOR ADDITIONAL INFORMATION REGARDING THE SPENT FUEL POOL RERACK FOR BEAVER VALLEY POWER STATION, UNIT NO.2 (TAC NO. ME1079)

On December 15,2010, a Category 1 public conference call was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of FirstEnergy Nuclear Operating Company (the licensee) and Holtec International. Inc. (the vendor). The purpose of the conference call was to discuss the licensee's draft responses to the questions posed by the NRC staff during the September 27, 2010, public meeting. The NRC staff issued a request for additional information (RAI) by letter dated March 19, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML100760584), after reviewing the Spent Fuel Pool (SFP) Rerack License Amendment Request dated April 9, 2009 (ADAMS Accession No. ML091210251). as supplemented by letters dated June 15,2009 (ADAMS Accession No. ML091680614) and January 18. 2010 (ADAMS Accession No. ML100191805) for Beaver Valley Power Station, Unit No.2 (BVPS-2). Enclosed is the list of meeting attendees.

The licensee provided draft responses for RAI questions 5,6,8, 17, and 19 for discussion during the public meeting. The licensee discussed changes made to their draft response for RAI question #8. The licensee also discussed their intended change to Sections 5 and 7 of the BVPS-2 Licensing Report submitted with the original application.

The NRC staff queried the licensee and the vendor on the draft response to RAI question 8.

The NRC staff requested (1) justification for the use of 0.362 failure strain limit for the existing SFP liner, (2) justification as to how the formula used to determine tensile force yields conservative results, (3) detailed discussion on the safety factors for one-way shear discrepancy, and (4) an updated safety factor for the base slab when the tensile force is taken into account. The NRC staff did not have any additional questions in regards to the draft responses for RAI questions 5,6, 17, and 19.

The licensee agreed to submit final RAI responses and additional information to address the NRC staff's questions and concerns by January 2011.

Members of the public were in attendance, via teleconference. No Public Meeting Feedback forms or comments, via electronic mail, were received.

-2 If you have any questions, please contact me at (301) 415-1016, or Nadiyah,Morgan@nrc,gov, Sincerely,

~

~

Nadiyah S. Morgan, Project Manager Plant licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No, 50-412

Enclosure:

As stated cc w/encl: Distribution via Listserv

- 2 If you have any questions, please contact me at (301) 415-1016, or Nadiyah.Morgan@nrc.gov.

Sincerely, IRA!

Nadiyah S. Morgan, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-412

Enclosure:

As stated cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsOgcRp Tony Nakanishi Branch Reading RidsOpaMail Evan Davidson RidsAcrsAcnw _ MailCTR RidsRgn1 MailCenter Steve Jones RidsNrrOd RidsNrrDeEmcb DWerkheiser RidsNrrDorlLpl1-1 Farhad Farzam EBonney RidsNrrPM BeaverValley William Jessup RBeliamy RidsNrrLASLittle KWood KManoly ADAMS Accession: ML103560661 OFFICE DORLlLPL 1-1/PM DORLlLPL 1-1/LA DORLlLPL1-1/BC NAME NMorgan SUttle NSalgado DPickett for DATE 12/29/10 12/29/10 12/29/10 OFFICIAL RECORD COPY

LIST OF MEETING ArrENDEES DECEMBER 15. 2010, PUBLIC CONFERENCE CALL WITH FIRSTENERGY NUCLEAR OPERATING COMPANY AND HOL TEC, INC.

SPENT FUEL POOL RERACK DRAFT RAI RESPONSES Nadiyah Morgan NAME NRC ORGANIZATION I

Nancy Salgado NRC Meena Khanna NRC Farhad Farzam NRC William Jessup NRC Kamal Manoly NRC Dave Werkheiser NRC Erin Bonney NRC Mark Manoleras FENOC

. Nathan Walker Tom Westbrook FENOC FENOC I

Jim Starr FENOC Carmen Mancuso FENOC Tom Lentz Julie Firestone FENOC FENOC I

Phil Lashley Mike Testa FENOC FENOC I

Kevin Rogers Chuck Bullard John Zhai FENOC HOLTEC HOLTEC I

i Rick Trotta

  • Evan Rosenbaum HOLTEC HOLTEC I

Larry Ryan PA Dept. of Envr. Protection Rich Janati PA Dept. of Envr. Protection Enclosure