Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application
ML081050270
Person / Time
Site: Beaver Valley
Issue date: 04/30/2008
From: Kent Howard
NRC/NRR/ADRO/DLR
To: Sena P
FirstEnergy Nuclear Operating Co
HOWARD, KENT, NRR/ADRO/RPB2, 415-2989
References
TAC MD6593, TAC MD6594
Download: ML081050270 (7)


Text

April 30, 2008 Mr. Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-BV-SEB-1 P.O. Box 4, Route 168 Shippingport, PA 15077

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MD6593 AND MD6594)

Dear Mr. Sena:

By letter dated August 27, 2007, FirstEnergy Nuclear Operating Company submitted an application pursuant to 10 CFR Part 54, to renew the operating licenses for Beaver Valley Power Station, Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.

Items in the enclosure were discussed with Mr. Cliff Custer of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-2989 or e-mail Kent.Howard@nrc.gov.

Sincerely,

/RA/

Kent L. Howard, Sr., Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosure:

As stated cc w/encl: See next page

ML081050270 OFFICE LA:DLR BC:RER2:DLR PM:RLRB:DLR BC:RPB2:DLR NAME IKing RAuluck w/correction KHoward RFranovich (JRowley for)

DATE 04/28/08 04/29/08 04/15/08 04/30/08

BEAVER VALLEY POWER STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION REQUEST FOR ADDITIONAL INFORMATION SECTIONS B.2.13 AND B.2.39 Section B.2.39 RAI B.2.39-1 Beaver Valley Power Station (BVPS) license renewal application (LRA) does not discuss the issue of aging of coatings or has any aging management program (AMP) to manage the aging of coatings. The generic aging lessons learned (GALL) Report recommends such a program.

Please justify why an aging management program for coatings is not needed at BVPS. The failure of coatings could result in aging effects for the steel shell in containment. The failure of coatings could also result in the failure of safety systems to perform their intended functions (for instance, safety injection).

RAI B.2.39-2 In the BVPS LRA, AMP B.2.39, Structures Monitoring Program, is not clear as to how it satisfies the GALL Report program element Parameters Monitored/Inspected. BVPS enhancement for this program element does not include the frequency of periodic sampling of groundwater for pH, chloride, and sulfate concentrations. Please, provide the time frame of your periodic sampling, and the results for the last two samplings of groundwater.

RAI B.2.39.3 BVPS LRA, AMP B.2.39, Structures Monitoring Program, does not include the 2006 inspection results. Please provide:

a. 2006 inspection results, and how these compare with the 1996 baseline inspection, and the 2001 inspection results.
b. The location, size, and depth of the reappear corroded steel found in 2001 inspection, which was painted as a result of the 1996 baseline inspection. What was the condition found in 2006 inspection? Was any other corrective action taken to ensure its capability to maintain its design function for the end of period of extended operation?

RAI B.2.39.4 In the BVPS LRA, AMP B.2.39, Structures Monitoring Program, is not clear in how it satisfies the GALL Report program element Parameters Monitored/Inspected. Specifically, the GALL Report program element suggested ACI 349.3R-96 and ANSI/ASCE 11-90 for an acceptable basis for selection of parameters to be monitored.

ENCLOSURE

On page B.2.109 of the LRA, under operating experience element, the applicant stated, The Structures Monitoring Program inspection of floors was found to be sufficient to identify and repair any cracks large enough to allow water seepage. Please, explain when does a crack become large enough and which industry codes, standards, and guidelines form the basis for this program element?

Section B.2.13 RAI B.2.13-1 In the BVPS LRA, AMP B.2.13, Electrical Wooden Poles/Structures Inspection Program

[Unit 2 Only], it is not clear as to how it satisfies the GALL Report program element parameter monitored/inspected. Please clarify the parameters of electrical wooden poles/structures that need inspection for aging effects and aging effects mechanisms affecting the ability of the wooden poles to perform their intended function. How will the buried part of the wooden pole be monitored/inspected?

Letter to P. Sena from K. Howard, dated April 30, 2008 DISTRIBUTION:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MD6593 AND MD6594)

HARD COPY:

DLR RF E-MAIL:

PUBLIC SSmith (srs3)

SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDciCvib RidsNrrDciCpnb RidsNrrDraAfpb RidsNrrDeEmcb RidsNrrDeEeeb RidsNrrDssSbwb RidsNrrDssSbpb RidsNrrDssScvb RidsOgcMailCenter


KHoward ESayoc NMorgan MModes, RI PCataldo, RI DWerkheiser, RI

Beaver Valley Power Station Units 1 and 2 cc:

Joseph J. Hagan Ohio EPA-DERR President and Chief Nuclear Officer ATTN: Zack A. Clayton FirstEnergy Nuclear Operating Company P.O. Box 1049 Mail Stop A-GO-19 Columbus, OH 43266-0149 76 South Main Street Akron, OH 44308 Peter P. Sena III Site Vice President James H. Lash FirstEnergy Nuclear Operating Company Senior Vice President of Operations Beaver Valley Power Station and Chief Operating Officer Mail Stop A-BV-SEB-1 FirstEnergy Nuclear Operating Company P.O. Box 4, Route 168 Mail Stop A-GO-14 Shippingport, PA 15077 76 South Main Street Akron, OH 44308 Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Danny L. Pace Mail Stop A-GO-2 Senior Vice President, Fleet Engineering 76 South Main Street FirstEnergy Nuclear Operating Company Akron, OH 44308 Mail Stop A-GO-14 76 South Main Street Manager, Site Regulatory Compliance Akron, OH 44308 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Jeannie M. Rinckel Mail Stop A-BV-A Vice President, Fleet Oversight P.O. Box 4, Route 168 FirstEnergy Nuclear Operating Company Shippingport, PA 15077 Mail Stop A-GO-14 76 South Main Street Commissioner James R. Lewis Akron, OH 44308 West Virginia Division of Labor 749-B, Building No. 6 David W. Jenkins, Attorney Capitol Complex FirstEnergy Nuclear Operating Company Charleston, WV 25305 Mail Stop A-GO-15 76 South Main Street Director, Utilities Department Akron, OH 44308 Public Utilities Commission 180 East Broad Street Manager, Fleet Licensing Columbus, OH 43266-0573 FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 Director, Pennsylvania Emergency 76 South Main Street Management Agency Akron, OH 44308 2605 Interstate Drive Harrisburg, PA 17110-9364

Beaver Valley Power Station Units 1 and 2 cc:

Dr. Judith Johnsrud Julie Firestone Environmental Coalition on Nuclear Power FirstEnergy Nuclear Operating Company Sierra Club Beaver Valley Power Station 433 Orlando Avenue P.O. Box 4, Route 168 State College, PA 16803 Shippingport, PA 15077 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077 Cliff Custer FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077 Mike Banko FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077