UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 March 31, 2016 MEETING

SUMMARY

LICENSEE:

FirstEnergy Nuclear Generation, LLC FACILITY:

Beaver Valley Power Station, Units 1 and 2

SUBJECT:

Annual Assessment Meeting Summary On March 21, 2016, from 5:00 p.m. to 6:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Shippingport Community and Municipal Building, in Shippingport, PA. The NRC conducted the open house to discuss its assessment of the safety performance at Beaver Valley Power Station, Units 1 and 2, for 2015.

A notice of the open house was issued on March 7, 2016, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16067A328.

ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC displayed poster boards and was available to discuss its assessment of the safety performance of the Beaver Valley Power Station for the period of January 1 through December 31, 2015, as documented in our Annual Assessment Letter dated March 2, 2016 (ADAMS Accession No. ML16054A769). The NRC poster boards included background information on the Reactor Oversight Process (ROP) and plant-specific performance. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Beaver Valley Power Station can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public attended the open house and were offered the opportunity to question the NRC regarding Beaver Valleys performance and the role of the agency in ensuring safe plant operations.

/RA Steve W. Shaffer Acting for/

Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects

MEETING

SUMMARY

LICENSEE:

FirstEnergy Nuclear Generation, LLC FACILITY:

Beaver Valley Power Station, Units 1 and 2

SUBJECT:

Annual Assessment Meeting Summary On March 21, 2016, from 5:00 p.m. to 6:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Shippingport Community and Municipal Building, in Shippingport, PA. The NRC conducted the open house to discuss its assessment of the safety performance at Beaver Valley Power Station, Units 1 and 2, for 2015.

A notice of the open house was issued on March 7, 2016, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16067A328.

ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC displayed poster boards and was available to discuss its assessment of the safety performance of the Beaver Valley Power Station for the period of January 1 through December 31, 2015, as documented in our Annual Assessment Letter dated March 2, 2016 (ADAMS Accession No. ML16054A769). The NRC poster boards included background information on the Reactor Oversight Process (ROP) and plant-specific performance. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Beaver Valley Power Station can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public attended the open house and were offered the opportunity to question the NRC regarding Beaver Valleys performance and the role of the agency in ensuring safe plant operations.

/RA Steve W. Shaffer Acting for/

Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects DISTRIBUTION w/encl:

DDorman, RA DLew, DRA MScott, DRP RMcKinley, DRP RLorson, DRS BSmith, DRS SKennedy, DRP SShaffer, DRP SElkhiamy, DRP MHenrion, DRP JKrafty, DRP, SRI BReyes, DRP, RI CBozlinski, DRP, ROAA TClark, RI, OEDO RidsNrrPMBeaverValley Res RidsNrrDorlLpl1-2 Res ROPreports Res DOC NAME: G:\\DRP\\BRANCH6\\Communications\\Public Meetings\\Annual Assessment Meetings\\2016\\

Beaver Valley\\BV Annual Assessment Meeting Summary 2016.docx ADAMS Accession No.: ML16091A070

SUNSI Review Non-Sensitive Sensitive

Publicly Available

Non-Publicly Available OFFICE RI/DRP RI/DRP NAME LCruz/ LC SKennedy/SWS for DATE 03/30 /16 03/30 /16

OFFICIAL RECORD COPY

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 March 31, 2016 MEETING

SUMMARY

LICENSEE:

FirstEnergy Nuclear Generation, LLC FACILITY:

Beaver Valley Power Station, Units 1 and 2

SUBJECT:

Annual Assessment Meeting Summary On March 21, 2016, from 5:00 p.m. to 6:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Shippingport Community and Municipal Building, in Shippingport, PA. The NRC conducted the open house to discuss its assessment of the safety performance at Beaver Valley Power Station, Units 1 and 2, for 2015.

A notice of the open house was issued on March 7, 2016, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16067A328.

ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC displayed poster boards and was available to discuss its assessment of the safety performance of the Beaver Valley Power Station for the period of January 1 through December 31, 2015, as documented in our Annual Assessment Letter dated March 2, 2016 (ADAMS Accession No. ML16054A769). The NRC poster boards included background information on the Reactor Oversight Process (ROP) and plant-specific performance. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Beaver Valley Power Station can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public attended the open house and were offered the opportunity to question the NRC regarding Beaver Valleys performance and the role of the agency in ensuring safe plant operations.

/RA Steve W. Shaffer Acting for/

Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects

MEETING

SUMMARY

LICENSEE:

FirstEnergy Nuclear Generation, LLC FACILITY:

Beaver Valley Power Station, Units 1 and 2

SUBJECT:

Annual Assessment Meeting Summary On March 21, 2016, from 5:00 p.m. to 6:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Shippingport Community and Municipal Building, in Shippingport, PA. The NRC conducted the open house to discuss its assessment of the safety performance at Beaver Valley Power Station, Units 1 and 2, for 2015.

A notice of the open house was issued on March 7, 2016, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16067A328.

ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC displayed poster boards and was available to discuss its assessment of the safety performance of the Beaver Valley Power Station for the period of January 1 through December 31, 2015, as documented in our Annual Assessment Letter dated March 2, 2016 (ADAMS Accession No. ML16054A769). The NRC poster boards included background information on the Reactor Oversight Process (ROP) and plant-specific performance. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Beaver Valley Power Station can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public attended the open house and were offered the opportunity to question the NRC regarding Beaver Valleys performance and the role of the agency in ensuring safe plant operations.

/RA Steve W. Shaffer Acting for/

Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects DISTRIBUTION w/encl:

DDorman, RA DLew, DRA MScott, DRP RMcKinley, DRP RLorson, DRS BSmith, DRS SKennedy, DRP SShaffer, DRP SElkhiamy, DRP MHenrion, DRP JKrafty, DRP, SRI BReyes, DRP, RI CBozlinski, DRP, ROAA TClark, RI, OEDO RidsNrrPMBeaverValley Res RidsNrrDorlLpl1-2 Res ROPreports Res DOC NAME: G:\\DRP\\BRANCH6\\Communications\\Public Meetings\\Annual Assessment Meetings\\2016\\

Beaver Valley\\BV Annual Assessment Meeting Summary 2016.docx ADAMS Accession No.: ML16091A070

SUNSI Review Non-Sensitive Sensitive

Publicly Available

Non-Publicly Available OFFICE RI/DRP RI/DRP NAME LCruz/ LC SKennedy/SWS for DATE 03/30 /16 03/30 /16

OFFICIAL RECORD COPY