December 5, 2017, Summary of Public Meeting with Firstenergy Nuclear Operating Company to Discuss a Proposed License Amendment Request Extending Sleeve Life on the Steam Generator at Beaver Valley Power Station, Unit 2
ML17347A808
Person / Time
Site: Beaver Valley
Issue date: 12/20/2017
From: Booma Venkataraman
Plant Licensing Branch 1
To: Bologna R
FirstEnergy Nuclear Operating Co
Venkataraman B, NRR/DORL/LPL1
References
EPID L-2017-LRM-0061
Download: ML17347A808 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 20, 2017 Mr. Richard D. Bologna Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077

SUBJECT:

SUMMARY

OF DECEMBER 5, 2017, MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY TO DISCUSS A POTENTIAL LICENSE AMENDMENT REQUEST RE: EXTENDING SLEEVE LIFE ON THE STEAM GENERATOR AT THE BEAVER VALLEY POWER STATION, UNIT NO. 2.

(EPID L-2017-LRM-0061)

Dear Mr. Bologna:

On December 5, 2017, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of FirstEnergy Nuclear Operating Company (the licensee) and of Westinghouse at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the licensee's plan to submit a license amendment request {LAR) for extending the approved service life of the Alloy 800 leak-limiting sleeves in the Beaver Valley Power Station (Beaver Valley), Unit No. 2, steam generators. The meeting notice and agenda, dated November 7, 2017, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17335A054. A list of attendees is enclosed.

The licensee presented meeting slides (ADAMS Accession No. ML17335A037) regarding its plan to submit an LAR in March 2018 that would request extending the service life of Alloy 800 leak-limiting sleeves for three additional operating cycles. The licensee indicated that license Amendment No. 184, approved on December 16, 2015 (ADAMS Accession No. ML15294A439),

authorized use of the Alloy 800 leak-limiting sleeves for up to five operating cycles. The new LAR will request NRC approval by March 2019 for a planned implementation by April 2020. The licensee also indicated that this LAR will be specific to Beaver Valley, Unit No. 2, and the request will not reference any topical report. The presentation included a brief overview of the Beaver Valley, Unit No., 2 steam generator program, a discussion on the Alloy 800 leak-limiting sleeves, and a summary of the technical justification for extending the service life of the Alloy 800 leak-limiting sleeves.

The licensee highlighted that when all data is considered, the proposed service life extension of Alloy 800 leak-limiting sleeves will not reduce the levels of assurance of steam generator tube integrity required by the technical specifications. In addition, the licensee mentioned that it is considering a separate future LAR to allow unlimited use of installed Alloy 800 leak-limiting sleeves, subject to the qualification of the appropriate non-destructive examination technique.

Further, the licensee noted that it is also considering future qualification of a new Alloy 800 leak-limiting sleeve that does not use a nickel band.

R. Bologna The NRC staff asked questions related to the U.S. and international operating experience of Alloy 800 leak-limiting sleeves, particularly sleeves installed in mill-annealed Alloy 600 tubing.

The NRC staff also asked about the design variations of the sleeves installed at Beaver Valley, Unit No. 2, the reasons why three sleeves were removed from service, and possible changes to the installation process of new sleeves that might be installed at Beaver Valley, Unit No. 2. In addition, the NRC staff asked questions related to additional laboratory testing and finite element modeling that the licensee discussed in relation to the technical basis for the service life extension of the Alloy 800 leak-limiting sleeves. Finally, the NRC staff asked questions related to development of an inspection process for the Alloy 800 leak-limiting sleeves that was qualified to Appendix H of the Electric Power Research lnstitute's, "Pressurized Water Reactor Steam Generator Examination Guidelines." The NRC staff provided feedback to the licensee that its review of the proposed LAR would focus on any new analysis, additional laboratory data since the original sleeve license amendment approved on December 16, 2015, and operating experience of Alloy 800 sleeves (particularly in mill-annealed Alloy 600 tubing).

Mr. Rich Janati and Mr. Larry Winker, representing the Department of Environmental Protection, State of Pennsylvania, attended the meeting by telephone. Mr. Janati had two questions for the NRC after the business portion of the meeting related to the operating experience of Alloy 800 sleeves in the United States and NRC inspections of the sleeves. No public meeting feedback forms were received.

Please direct any inquiries to me at (301) 415-2934 or Booma.Venkataraman@nrc.gov.

Sincerely,

~l~

Booma Venkataraman, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-412

Enclosure:

List of Attendees cc w/

Enclosure:

Distribution via Listserv

LIST OF ATTENDEES MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY POTENTIAL LICENSE AMENDMENT REQUEST RE: EXTENDING SLEEVE LIFE ON THE STEAM GENERATOR AT THE BEAVER VALLEY POWER STATION, UNIT NO. 2 NRC Participants Steven Bloom James Danna Booma Venkataraman Andrew Johnson Paul Klein Alan Huynh FENOC Participants Mark Manoleras Tom Lentz Charles O'Neill Gary Alberti Tim Saibena Greg Kammerdeiner Westinghouse Participants William Cullen Damian Testa Rob Taylor Members of the Public*

Rich Janati (Department of Environmental Protection, State of Pennsylvania)

Larry Winker (Department of Environmental Protection, State of Pennsylvania)

  • participated by telephone Enclosure

R. Bologna

SUBJECT:

SUMMARY

OF DECEMBER 5, 2017, MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY TO DISCUSS A POTENTIAL LICENSE AMENDMENT REQUEST RE: EXTENDING SLEEVE LIFE ON THE STEAM GENERATOR AT THE BEAVER VALLEY POWER STATION, UNIT NO. 2.

(EPID L-2017-LRM-0061) DATED DECEMBER 20, 2017 DISTRIBUTION:

Public RidsRgn1 MailCenter Resource RidsNrrDorlLpl1 Resource RidsNrrLALRonewicz Resource RidsNrrPMBeaverValley Resource RidsACRS_MailCTR Resource PKlein, NRR KWest, NRR AJohnson, NRR RidsNrrDmlrMccb Resource AHuynh, NRR TWertz, NRR JBowen, OEDO ADAMS A ccess1on No.: ML17347A808 *b1y e-ma1*1 OFFICE NRR/DORL/LPL 1/PM NRR/DORL/LPL 1/LA NRR/DMLR/MCCB/BC*

NAME BVenkatamaran LRonewicz SBloom DATE 12/14/2017 12/14/2017 12/18/2017 OFFICE NRR/DORL/LPL 1/BC NRR/DORL/LPL 1/PM NAME Joanna BVenkatamaran DATE 12/20/2017 12/20/2017 OFFICIAL RECORD COPY