Similar Documents at Cook |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217J4721999-10-15015 October 1999 Forwards NRC Physical Security Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24.Two Violations Noted & Being Treated as Ncvs,Consistent with App C of Enforcement Policy. Areas Examined Exempt from Disclosure,Per 10CFR73.21 IA-99-379, First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety1999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20217D9241999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML20196K5961999-06-30030 June 1999 Ltr Contract:Task Order 40, DC Cook Extended Sys Regulatory Review Oversight Insp, Under Contract NRC-03-98-021 ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML20207A9201999-05-21021 May 1999 Ack Receipt of 990319 Response to Notice of Violation & Proposed Imposition of Civil Penalty .On 981124, Licensee Remitted Check for Payment of Civil Penalties. Licensee Requests for Extension for Response,Granted ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML20205P0591999-04-14014 April 1999 Ninth Partial Response to FOIA Request for Documents.App Records Already Available in Pdr.Records in App T Encl & Being Made Available in Pdr.App U Records Being Released in Part (Ref FOIA Exemption 7).App V Records Withheld Entirely ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed ML17325B5141999-03-30030 March 1999 Forwards Rept on Status of Decommissioning Funding.Attached Rept Includes Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML17325B5191999-03-29029 March 1999 Forwards LER 99-001-00,re Degraded Component Cw Flow to Containment Main Steam Line Penetrations.Commitment, Listed ML20204F6401999-03-19019 March 1999 Responds to NRC 981013 NOV & Proposed Imposition of Civil Penalty.Violations Cited in Subject NOV Were Initially Identified in Referenced Five Insp Repts.Corrective Actions: Ice Condensers Have Been Completely Thawed of Any Blockage ML17325B4751999-03-18018 March 1999 Forwards LER 99-004-00,re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitment Made by Util,Listed ML17325B4721999-03-18018 March 1999 Forwards LER 99-005-00,re Reactor Trip Breaker Manual Actuations During Rod Drop Testing Not Previously Reported. Listed Commitments Identified in Submittal ML17325B4641999-03-17017 March 1999 Withdraws Response to Issue 1 of NRC Cal,Dtd 970919. Comprehensive Design Review Effort in Progress to Validate Resolution of Issue for Future Operation 1999-09-30
[Table view] Category:UTILITY TO NRC
MONTHYEARML17328A4481990-09-21021 September 1990 Requests Withdrawal of Mode 6 Proposed Tech Spec Change Since Issue Currently Being Addressed by New STSs ML17328A4331990-08-27027 August 1990 Informs of Preliminary Assessment of 900713 Electrical Contact Accident at Facility.Investigation Concludes That No Safety Rules Violated ML17328A4001990-08-24024 August 1990 Responds to 900725 Ltr Re Commitments Made in Response to Generic Ltr 88-14 on Instrument Air Supply Problems Affecting safety-related Equipment.Simulator Training to Be Provided as Stated ML17334B3781990-08-24024 August 1990 Forwards Info to Certify Plant Simulator Facility.Results of Evaluation of Dual Unit Simulation Facilities Demonstrate That Plant Simulator Performance Compares Favorably W/Units ML17328A4231990-08-21021 August 1990 Forwards Under Separate Cover,Semiannual Radioactive Effluent Release Rept for Jan-June 1990 ML17328A3901990-08-17017 August 1990 Responds to NRC 900720 Ltr Re Violations Noted in Onsite Audit of Spds.Corrective Actions:Apparent Disparity in Selection of Reactor Trip & Sys Capacity or Anticipatory Values Rectified ML17328A3891990-08-15015 August 1990 Forwards Performance Data Sheets for Plant fitness-for-duty Program for Period Jan-June 1990,per 10CFR26.Encl Includes Statistics on Various Categories of Testing,Substances Tested for & cut-off Levels Used ML17328A3571990-08-0202 August 1990 Responds to Open Items in Safety Evaluation of Util Response to Unresolved Issues on post-fire Safe Shutdown Methodology. Open Items 1 & 21 Will Be Closed by Implementing Plant Procedures Providing Equivalent Degree of Protection ML17328A3431990-07-23023 July 1990 Requests Withdrawal of 890830 Proposed Tech Spec Changes Re Sections 3.0 & 4.0.Util Will Resubmit Generic Ltr 87-09 Recommended Improvement Items on Case by Case Basis ML17328A3421990-07-23023 July 1990 Provides Results of Offsite Dose Calculation for Reactor Coolant Pump Locked Rotor Event for Facility Cycle 8.Util Identified Previously Issued SERs Addressing Short Term Containment Analysis & LOCA Containment Integrity ML20055G7551990-07-18018 July 1990 Responds to NRC Re Violations Noted in Insp Repts 50-315/90-10 & 50-316/90-10.Corrective Actions:Required Review Performed & Updated Procedure 12 Mhp 5021.019.001 Revised & Issued ML17328A3191990-07-12012 July 1990 Responds to NRC 900601 Ltr Re Violations Noted in Insp Repts 50-315/89-31 & 50-316/89-31.Corrective Actions:Electrical Testing Techniques Improved & Surveillance Procedures for Feedwater Pumps Will Be Rewritten ML17328A3181990-07-0909 July 1990 Responds to Generic Ltr 90-03,Suppl 1, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2,Part 2, 'Vendor Interface for Safety-Related Components.' Licensee Will Contact safety-related Vendors on Annual Basis ML17328A3111990-07-0303 July 1990 Provides Certification of Funding Plan for Decommissioning of Plant,Per 10CFR50.33 & 50.75 ML17328A2961990-06-25025 June 1990 Forwards Response to Generic Ltr 90-04 Re Closeout of Generic Safety Issues.Util Supports Concern & Desire to Close long-standing Generic Safety Issues ML17328A2921990-06-22022 June 1990 Forwards WCAP-12483, Analysis of Capsule U from American Electric Power Co DC Cook Unit 1 Reactor Vessel Radiation Surveillance Program. ML20044A3521990-06-22022 June 1990 Submits Info Re Sensitivity Study Performed on Number of Fuel Axial Intervals,Per Topical Rept, American Electric Power Reactor Core Thermal-Hydraulic Analysis Using Cobra III-C/MIT-2 Computer Code. ML17328A2821990-06-15015 June 1990 Submits Ltr Re Proposed Control Room Habitability Tech Spec Changes & Supporting Analyses,Per 900521 Discussion.Revised Calculations of Control Room Thyroid Doses Will Be Submitted within 60 Days of Receipt of Proposed Generic Ltr ML17328A2741990-06-12012 June 1990 Submits Followup,Per 900205 & 0308 Ltrs & Provides Update Re Inoperable Fire Barrier.Fire Seal Repaired & Restored to Operability on 900419 ML17328A2551990-06-0505 June 1990 Forwards Addl Info Re Util 900126 Revised Response to NRC Bulletin 88-002,per NRC 900509 Request ML17328A7361990-06-0101 June 1990 Forwards Addl Info Re 890825 & 1212 Applications for Amends to Licenses DPR-58 & DPR-74,per Request.Amends Make Changes to Administrative Controls ML17328A7331990-05-29029 May 1990 Forwards Nonproprietary WCAP-12577 & Proprietary WCAP-12576, Westinghouse Revised Thermal Design Procedure Instrument... Methodology for American Electric Power DC Cook Unit 2 Nuclear Power Station, Per 900419 Commitment ML17328A7321990-05-24024 May 1990 Responds to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. No Rosemount Model 1153 Series B or D or Model 1154 Transmitters Installed at Facility.Transmitters Purchased as commercial-grade Units ML17328A6991990-05-0909 May 1990 Provides Suppl to 900103 Response,Certifying That Fitness for Duty Program Implemented at Plant.Change Also Clarifies When More Stringent cut-off Levels Adopted at Plant Program Apply ML17328A7001990-05-0909 May 1990 Responds to NRC 900406 Ltr Re Inadequacies of Spds,Per Audit on 900221-22.Corrective Actions:Software Mod Will Prevent User from Accessing Displays Other than Iconic Displays from SPDS Dedicated Terminal ML17328A7071990-05-0707 May 1990 Forwards Monthly Operating Rept for Apr 1990 & Corrected Rept Mar 1990 for Donald C Cook Nuclear Plant Unit 1 ML17328A7031990-05-0707 May 1990 Forwards Monthly Operating Rept for Apr 1990 & Corrected Rept for Mar 1990 for DC Cook Nuclear Plant Unit 2 ML17328A6951990-04-30030 April 1990 Certifies That Training Programs for Initial Licensing & Requalification Training of Operators & Senior Operators at Plant Accredited by Inpo,Per Generic Ltr 87-07 ML17328A6861990-04-30030 April 1990 Forwards Annual Environ Operating Rept,Jan-Dec 1989, & DC Cook Nuclear Plant Units 1 & 2 Operational Radiological Environ Monitoring Program 1989 Rept Jan-Dec 1989. ML17328A6801990-04-23023 April 1990 Responds to NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Study Planned to Evaluate Alternative Actions to Be Taken for Protecting RHR Pumps ML17328A6771990-04-23023 April 1990 Forwards DC Cook Nuclear Plant 1990 Annual Emergency Preparedness Exercise. Exercise Scope & Objectives & Detailed Scenario Documentation Encl ML17334B3641990-04-11011 April 1990 Responds to NRC 900301 Ltr Re Violations Noted in Insp Repts 50-315/89-31 & 50-316/89-31.Corrective Actions:Reliability Centered Maint Program Initiated ML17328A6601990-04-11011 April 1990 Forwards Updated QA Program Description for Cook Nuclear Plant, Incorporating Editorial,Organizational & Position Title Changes ML17328A6551990-04-0909 April 1990 Responds to NRC 900309 Ltr Re Violations Noted in Insp Rept 50-316/90-08.Corrective Actions:Procedure for Steam Generator Stop Valve Operability Test Revised to Require That MSIV Be Declared Inoperable After Failing Stroke Test ML17334B3601990-04-0606 April 1990 Forwards Revised Figures for Loss of Load Event Previously Submitted in Attachment 4,App B of Vantage 5 Reload Transition Safety Rept Supplied by Westinghouse in Jan 1990. Update Is Editorial in Nature ML17334B3621990-04-0606 April 1990 Forwards 1989 Annual Rept & Projected Cash Flow ML17328A6341990-03-30030 March 1990 Forwards Application for Renewal of Plant NPDES Permit,For Info,Per Section 3.2 of App B to Plant Tech Specs.W/O Encl ML17328A6331990-03-30030 March 1990 Responds to NUMARC 900104 Request for Addl Info Re Station Blackout Submittals.Target Reliability for Emergency Diesel Generator of 0.0975 Established for 4 H ac-independent Coping Category Will Be Maintained ML17328A6321990-03-30030 March 1990 Forwards Response to Generic Ltr 90-01, NRC Regulatory Impact Survey. Util Ack Recommendation by NUMARC ML17328A6221990-03-27027 March 1990 Responds to 900226 Ltr Transmitting Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000. Corrective Actions:Flow Retention Circuitry Setpoints Set to Compensate for Missized Process Flow Orifice ML17328A6191990-03-27027 March 1990 Forwards Payment in Amount of $75,000 for Civil Penalty Imposed Through Notice of Violation Issued in Insp Rept 50-316/89-02 on 891016-20,24-26 & 1204.Response to Violation & Corrective Actions Provided in Separate Submittal ML17328A6161990-03-20020 March 1990 Responds to Generic Ltr 89-19 Re Safety Implications of Control Sys in LWRs (USI A-47).Both Units Have Steam Overfill Protection Sys That Would Automatically Prevent Water Carryover Into Steam Lines If Control Sys Failed ML17328A6121990-03-13013 March 1990 Forwards Monthly Performance Monitoring Rept,Jan 1990. ML17325B3901990-03-0606 March 1990 Forwards Annual Rept to NRC Per 10CFR50.54(W)(2) Re Nuclear Property Insurance ML17325B3921990-03-0606 March 1990 Modifies Application for Amend to License DPR-74 Re Cycle 8, Per 900228 Telcon ML17325B3781990-02-28028 February 1990 Forwards Response to NRC Info Notice 89-056 Re Questionable Certification of Matl Supplied to Dod by Nuclear Suppliers. Matl Capable of Performing Design Function & Acceptable for Continued Use ML17328A5971990-02-27027 February 1990 Withdraws 890203 Application for Amend to License DPR-74, Modifying Tech Spec Table 3.2-1 Re DNB Parameters to Express RCS Flow Rate on Volumetric Rather than Mass Basis ML17334B3511990-02-22022 February 1990 Submits Annual Rept of Changes to or Errors in Acceptable LOCA Evaluation Models or Application of Models for Plants. Wflash Analyses Will Be Superceded by Notrump Analyses for Unit 2,Cycle 8 Reload ML17328A5881990-02-21021 February 1990 Responds to NRC 890914 Request for Addl Info Re Safe Shutdown Methodology.App R Fire Barriers Being Maintained & Surveilled Under 3/4.7.10 for Units 1 & 2 ML17328A5861990-02-16016 February 1990 Provides Revised Comments in Response to NRR Comments During 891213 Telcon Re Allowable Stresses for Piping & Piping Supports 1990-09-21
[Table view] |
See also: IR 05000315/1985024
Text
INDIANA 8 MICHIGAN ELECTRIC COMPANY P.O.BOX 16631 COLUMBUS, OHIO 43216 November 8, 1985 AEP:NRC:0954
Donald C.Cook Nuclear Plant Nos.1 and 2 Docket Nos.50-315 and 50-316 License Nos.DPR-58 and DPR-74 NRC Report Nos.50-315/85024 (DRS)and 50-316/85024 (DRS)Mr.James G, Keppler U.S.Nuclear Regulatory
Commission
Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Dear Mr.Keppler: This letter is in response to Mr.tt.D.Shafer's letter dated October 2, 1985, which forwarded the subject inspection
reports of the routine safety inspection
conducted by your staff at the Donald C.Cook Nuclear Plant during the period September 3-13, 1985.The Notice of Violation attached to Mr.Shaferts letter identified
three violations.
Section 13 of the inspection
report identified
one weakness, The responses to these violations
and the weakness are addressed in the attachment
to this letter.This document has been prepared following Corporate procedures
which incorporate
a reasonable
set of controls to insure its accuracy and completeness
prior to signature by the undersigned.
Very truly yours, Attachments
MPA/ad cc: John E.Dolan N.G.Smith, Jr.-Bridgman R.C.Callen G.Charnoff NRC Resident Inspector-Bridgman G.Bruchmann, 8512030161
851 108 PDR ADO'5000315
I 8 PDR M..Al ich Vice President p5~.gb NOV 1 2 I985
4~.14 4~~4
AEP:NRC:0954
Attachment
Page 1 NRC Item No.1"Technical
Specification
6.8.1 requires establishment
and adherence to the applicable
procedures
recommended
in Appendix"A" of Regulatory
Guide 1.33, November 1972.Appendix"A~~includes procedures
for replacing important strainer s and filters and for limiting materials released to the environment.
a~Contrary to the above, on July 19, 1985, the licensee transported
a contaminated
reactor coolant filter using a 33-gallon drum instead of the Atcor transfer cask specified by Procedure 12 HHP 5021.001.001, Filter Replacement
By Transfer Cask, Additionally, no procedure was available to control the preparation
and transfer of the reactor coolant filter to the 55-gallon shipping drum.This resulted in a worker exceeding the quarterly author ized dose.b.Contrary to the above, from June 20 through September 13, 1985, the Hydro Nuclear dry active waste segregation
and volume reduction system was operated without an adequate established
procedure for limiting materials released to the environment
in that the system operators were not directed by procedure to follow manufacturer's
instructions
that specify the disposal as radioactive
waste of any parcel of system processed waste which has generated a bag monitor high count alarm.During the above stated time period, operators routinely reprocessed
the material in these parcels without treating it as detected radioactive
waste." Corrective
Actions Taken and Results Achieved The worker's TLD was immediately
pulled and sent in for early readout.The results showed that based on TLD, the administrative
limit was not exceeded.In addition, interim instructions
were issued on July 29, 1985, in the form of a Department
Head Letter, communicating
the conclusions
reached during the post-job ALARA review and alerting maintenance
personnel to the hazards associated
with changing highly radioactive
filters.'orrective
Action to be Taken to Avoid Further Violations
A procedure is being developed to control the replacement
and transfer of the reactor coolant filters via a 33-gallon drum from the filter location to the waste storage.';1e anticipate
having this procedure approved by February 1, 1986.Full compliance
will be achieved on February 1, 1986 when the procedure to control the Filter Replacement
and Transfer is approved.
I
AEP:NRC:0950
Attachment
Pa e 2 Res onse to Item~It is our belief that we did have in place a procedure to follow manufacturer's
instructions.
The plant procedure, 12 TRIP 6010 ENV.007 (DA11 II Segregation/Volume
Reduction Pr ocess Operations)
was developed from the manufacturer's
draft procedure, HHS-230.Step 6.5.6 of the plant procedure states that if a bag monitor alarm occurred, the box could be opened and reprocessed.
This direction is consistent
with the manufacturer's
instructions.
The manufacturer
has agreed that the plant procedure follows the manufacturer
s instructions, and thus, adequately
limits material released to the environment.
Corrective
Action Taken and Results Achieved Hone required.Corrective
Action to be Taken to Avoid Further Violations
Hone required.Date When Full C~om liance)fill be Achieved For the reasons stated above, we believe operation of the DA~8 II was never in non-compliance
with Technical Specification
6.8.1.HRC Item tfo.2"10 CFR 20.201(b)states that each licensee shall make or cause to be made such surveys as (1)nay be necessary for the licensee to comply with the regulations
of this part, and (2)are reasonable
under the circumstances
to evaluate the extent of radiat'on hazards that may be pr esent.As used in the regulations
in this part,"survey<means an evaluation
of the radiation hazards incident to the production, use, release, disposal, or presence of radioactive
materials or other sources of radiation under a specific set of conditions.
Uhen appropriate, such evaluation
includes a physical survey of the location of materials and equipment, and measurements
of levels of radiation or concentrations
of radioactive
material present.a~Contrary to the above, on or before September 3, 1985, the licensee failed to adequately
evaluate the removable contamination
levels on equipment following attempted decontamination
to ensure compliance
with 10 CFR 20.101(a)and 10 CFR 20.103(a).
A drop light contaminated
to about 600,000 dpm/100 square centimeters
had been returned to a storage area reserved for mater'al that had been decontaminated
to less than 500 dpm/100 square centimeters.
1
AEP:NRC:0954
Attachment
Page 3 b.Contrary to the above, on September 3 and 4,~1985, adequate surveys of numerous small radioactive
material storage areas including the diving suit storage area had not been conducted to ensure compliance
with 10 CFR 20.203(b).
This resulted in improperly
posted or unposted radiation areas." Res onse to Item 2 a Corrective
Actions Taken and Results Achieved The entire storage area was posted as a contaminated
area.Corrective
Action to be Taken to Avoid Further Violations
The program to evaluate the removable contamination
on equipment following decontamination
to ensure compliance
with 10 CFR 20.101(a)and't0 CFR 20.103(a)appears to be adequate.The area where the contaminated
drop light was found is available to all plant personnel and it is likely that the noted material was placed in the area prior to decontamination.
A method to control the transport of radioactive
material within the controlled
areas will be established
in order to prevent the unauthorized
addition to or alteration
of the configuration
of material in these storage areas.This method will be established
and functional
by January 1986.Date (/hen Full Con liance Uill be Achieved Full compli;ance
was achieved on September 3, 1985 when the storage area was posted as a contaminated
area.Response to Item 2 b Corrective
Action Taken and Results Achieved The radioactive
material storage areas were immediately
resurveyed
upon discovery and properly posted.e Corrective
Actions Taken to Avoid Further Violations
See Response to Item 2 a.
AFP:NRC:0954
Attachment
Page 4 Date LJhen Full Com liance will be Achieved Full compliance
was achieved on September 4, 1985 when the areas were resur veyed and properly posted.NHC Xtem No"Technical
Specification
6.11 requires adherence to radiation protection
procedures.
Procedure 12 TflP 6010.RAD.401, Access Control Facility and Controlled
Area Entry and Exit, requires thorough frisking or decontamination
following a portal monitor alarm.Contrary to the above, on September 5, 1985, the inspectors
observed two contractor
employees violate this personal monitoring
requirement, One of the workers left the main access control area without additional
frisking or decontamination
after receiving an alarm on the portal monitor.The second worker exited the controlled
area through a less sensitive portal monitor at the contractor
access control area without performing
additional
frisking or decontamination
after rece'ivin" several alarms on the main access control portal monitor.>>Corrective
Actions Taken and Results Achieved All contractors
will be notified by November 15, 1985 that any willful disregard of Plant safety rules or Plant regulations
regarding radiation protection
or monitoring
will render the contractor
and its employee(s)
subject to disciplinary
action.Co>r ective Actions Taken to Avoid Further Violations
Xnitial and on-going training will be given to all site and contractor
personnel to ensure they understand
the importance
of and their individual
responsibility
to the radiation protection
program.Date llhen Full Com liance'tU.ll be Achieved Notification
to contractors
will be accomplished
by November 15, 1985.Training will be on-going.
AEP<NRC:0954
Attachment
Page 5 NHC ldenti f ied';Jeakneos
"...the licensee should conduct a thorough evaluation
to identify licensee commitments, technical problems, design and procedural
solutions to identified
problems, and a corrective
action complet'on
schedule for ESF and non-ESF filtration
systems in a timely manner in the areas of (1)the potential for fire protection
deluge systen leakage or activation
damaging charcoal adsorbers, (2)filter housing drain line configuration
and valving, and (3)the potential for an incident similar to the one that occurred at the Hatch plant." Res onoe to':Jeakness
The first and third concerns discussed above will be rectified by RFC DC-12-2890.
This RFC was written to change the charcoal filters fire protection
deluge systens from automatic to manual.The D, C.Cook Plant has 19 filter units that are equipped with charcoal filters, and of these 19 units, 16 now have autonatic Fire Protection
Deluge Systems, one has,a manual system, and two have no internal fire protection
systems.Because of the low nass of combustibles
in these three nonautomatic
protected units, coupled with the low potential for charcoal icnition, automatic systems were not specified or installed in then.RFC DC-12-2890
addresses modifying 12 of these 16 units;the (4)recirculating
units in the lower containnents
are not easily accessible
during plant operation and therefore will renain automatic.
The RFC has two parts to be performed, The first part of the HFC is to clooe the gate valve upstream of the three-way valve for 12 of the 16 systems.This would stop the leal<age,problem
and prevent an inadvertent
actuation of the oysten.The second part is to replace the carbon steel check valves on the deluge drain piping with stainless steel swing check valves for 11 of the 16 systems.(One of the twelve systems utilizes a deluge valve and not a thrce-way valve, There is no, drain problem associated
with this unit.The drains from the fire protection
system serving the four filter units in the containment
use gate valves in lieu of check valves.These valves have not been a problem,)Experience
has shown that the carbon steel check valve-are subject to the corrosive action of the water and do not properly function, therefore, they will be'eplaced
by stainless steel check valves.The second concern identified
in the JJHC weakness will be corrected by Revision 2 of RFC DC-12-1316.
This revision and an addendum will modify the dr ain syotens of the charcoal and/or HEPA filter units to preclude any aS.r bypass.The D.C.Cook Plant has 27 filter units that are equipped with charcoal and/or llEPA filter sections;however, only 24 of these units h"ve drains.The three filter units that do not have drains are the aforementioned
units which have charcoal filters without an automatic fire protection
system.HFC DC-12-1316, Revision 2, has been written to modify 19 filter units to contain gate valves or plugs in each individual
drain line or drain, respectively.
Gate valves will be used instead of check valves to prevent water from backing up into the units.The (4)recirculating
units in the lower containnents
will not have their drains modified since these units function usintotal recirculation
to clean the lower containments>
atmosphere.
The TSC filtration
unit is already properly isolated, All of the wor!<covered by the two afor e-mentioned
HFC's will be conpleted by the end of 1986.
p C>~ss)