LER 98-004-01:on 980302,TS Required LSFT of Level 8 Trip of Main Turbine Was Missed.Caused by Knowledge Deficiency of EHC Sys.Revised Applicable LSFT Procedures Prior to Refueling Outage 6.W/980604 Ltr
ML18040A345
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/04/1998
From: DAHLBERG K A, WARD K D
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-98-004, LER-98-4, NMP2L-1788, NUDOCS 9806160140
Download: ML18040A345 (10)


Text

NIAGARAMOHAWKGENERATIONBUSINESSGROUPNINEMILEPOINTNUCLEARSTATION/lAKE ROAD,P.O.BOX63,LYCOMING, NEWYORK13093dune4,1998'NNP2L1788UnitedStatesNuclearRegulatory Commission Attn:DocumentControlDeskWashington, DC20555RE:DocketNo.50-410LER98-04,Supplement 1Gentlemen:

Inaccordance with10CFR50.73 (a)(2)(i)(B),

wearesubmitting LER98-04,Supplement 1,"MissedTechnical Specification RequiredLSFTofLevel8TripofMainTurbine."

Thissupplement istoclarifyactionstakentocorrectthecauseofknowledge deficiency.

Verytrulyyours,KimA.Dahlberg, PlantManager-NhG?2KAD/GJG/kap Attachment xc:Mr.H.J.Miller,RegionalAdministrator, RegionIMr.B.S.Norris,SeniorResidentInspector RecordsManagement 9806ihoi40 50004iePDRADQCK0S 0

REGULATORY COMMISSION LICENSEEEVENTREPORT(LER)ROVEDOMBNO;3!500lclEXPIRES:ESfJMATKD BURDENPERRESPONSETOCOMPLYWmlTlBSINFORMATION COLLECIION REQUESfc50AJHRS.FORWARDCOMMENISREGARDOIO BURDENESAMATKTOTIESRECORDSANDREPORTSMANAGEMENfBRANCJI(M30),U.S.NUCLEARREGULATORY COMMlSSION,WAS)BNGION,DC3M55,ANDTOTHEPAPERWORK REDUCIION PROJECTO1500104),

OFF)CHOPMANAGEMENf ANDBUDGBI;WASHINGION, DC30503FACK1IYNAME(I)NineMilePointUnit2DOCXEfNUMBER(D05000410PAGEO)1OF4TIILE(4)MissedTechnical Specification RequiredLSFTofLevel8TripofMainTurbineEVENI'ATE (5)MONIHDAY*YEARgagREVISIONNUMBERREPORTDATEG)MONBlDAYYEAROTHERFACILmESINVLVED(I)FACJLIIYNAMES0302989801060498N/AN/A0500005000OPERATING MODB(9)TIESREPORTISSUBMIITIXI PURSUANTTOTHKREQUIREMENIS OFIOCFR5:(CJ>ccac>>cc>cc>>c>cc c/dscfcJJ>>wJ>>I)

(II)POWERLEVEL(lc)J>YK~>~W020.2201(b) 020.2203(a)(1) 020.2203(a)(2)Q 020.2203(a)(2)(ii) 020.2203(a)(2)(iii) 020.2203(a)(2)(iv) 020.2203(a)(2)(v) 020.2203(a)(3)

Q020.2203(a)(3)(ii) 020.2203(a)(4) 050.36(c)(1) 050.36(c)(2) 350.73(a)(2)Q 050.73(a)(2)(ii) 0$0.73(a)(2)(iii) 0$0.73(a)(2)(v) 050.73(a)(2)(v) 050.73(a)(2)(vii) 050.73(a)(2)(viii) 050.73(a)(2)(x) 073.7i0orHHtJ>CccU>I>c>Ilcc>occ aclo>>>ccc>JJ>croc,J>BCFcc>>c555UNAMEK.D.Ward-Technical SupportManagerLICENSEECONfACfFORTIESLKR(l1).TKIZPHONB NUMBER(315)349-1043COMPLEIKONBISNBFOREACHCOMPONENf FAILUREDESCRIBED INTIESREPORT(I3)REPORTABLB TONPRDSSUPPLKMKNFAL REPORTEXPECIKD0O0YESQ'ycc,co>tpkccZXFECIKDSJtul5SJOJVJMIF>J 5EXPIATEDSUBMISSION DATE(l5)MONIHDAYABSTRACTghsltco140cPc>ccc>ac>

FFccc(>>~JJcj(/Jcasc0>IJccN>cc~

JJ>>cc)06)OnMarch2,1998,NiagaraMohawkPowerCorporation (NMPC)determined thattheNineMilePointUnit2(MMP2)LogicSystemFunctional Tests(LSFT)forthemainturbinetriponhighreactorvessellevel(Level8)failedtoverifytheentirecircuit.Thisisaviolation ofTechnical Specification Surveillance Requirement (TSSR)4.3.9.2whichisrequiredtobeperformed atleastonceper18months.Thecauseofthiseventhasbeendetermined tobeanapparentknowledge deficiency oftheElectroHydraulic Control(EHC)systemcombinedwithpoorworkpractices, whichledtheLSFTprocedure developers toconcludethattheEHCpanelwastheactuateddevice.Contributing tothiseventwastheomissionofrelevantinformation whentheLSFTprocedure fortheLevel8turbinetripwasdeveloped.

ThecircuitdiagramsfortheLevel8turbinetripshowtheEHCpanelasacircuittermination.

Theapplicable LSFTprocedures willberevisedpriortorefueling outage6(RFO6).Thiseventhasbeendiscussed withpersonnel performing theGenericLetter96-01procedure reviews.

0 NRCFORM366AFACILIIYNAME(I)REGULATORY COMMISSION LICENSEEEVENTREPORT(LER)TEXTCONTINUATION PROVEDOMBNO.3)30010lEXPIRES:ESIIMATED BURDENPERRESPONSETOCOMPLYWmlTlIISDIFORMATION COLLECfION REQUEST:SOA)IBLS.FORWARDCOMMEÃfSREGARDBIG BURDENESIIMATETOTIIERECORDSANDREMRTSMANAGEMENI'RANCII (M30),US.NUCLEARREGULATORY COMMISSION WASIENGfON>>

DC3OSSStANDTOTHEPAPERWORK REDUCflON PROJECfOISOOIOQ, OFHCEOFMANAGEMENI'ND BUDGEf,WASIIINGTON, DC20303.PAGEO)NineMilePointUnit205000410YEAR$9804REVISIONNUMBER0102OF04TE)ffQnsarvtPttttltttyket,sr@ofdMasdNRCionaSSSI's)PDOnMarch2,1998,NiagaraMohawkPowerCorporation (NMPC)determined thattheNineMilePointUnit2(NMP2)LogicSystemFunctional Tests(LSFT)forthemainturbinetriponhighreactorvessellevel(Level8)failedtoverifytheentirecircuit.Thisisaviolation ofTechnical Specification Surveillance Requirement (TSSR)4.3.9.2whichisrequiredtobeperformed atleastonceper18months.Thisdeficiency wasidentified inresponsetoaquestionfromanotherlicenseeconcerning LSFTtestingoftheElectroHydraulic Control(EHC)system.TheEHCsystemengineerreviewedtheLSFTdrawingsanddetermined thattheEHCcircuithadbeentestedfromtheLevel8transmitter toanEHCpanelinaccordance withanLSFTprocedure whichreferences TS4.3.9.2.Thecircuitry fromthemastertripbuswithintheEHCpaneltotheturbinestopandcontrolvalveswastestedinaccordance withanInstrument andControlsurveillance procedure whichdidnotspecifically reference TS4.3.9.2.However,thecircuitry fromtheEHCpanelinputterminals tothemastertripbuswasnottestedineitheroftheLSFTprocedures.

Afterfurtherreview,itwasfoundthattheEHCpanelcircuitry fromtheinputterminals tothemastertripbushasbeentestedsinceRefueling Outage3inOctober1993,butnotbyanLSFT.Workordershavebeeninitiated withsteptexttoperformthetestingeachrefueling outagesinceRFO3.Therefore, theentirecircuithasbeentestedsinceOctober1993tomeettheLSFTrequirements.

NMPChadperformed twopreviousLSFTreviewsandaninitialreviewofthisLevel8LSFTaspartoftheoverallLSFTreviewforGenericLetter(GL)96-01.Noneofthesereviewsidentified thisdeficiency.

However,theNhP2GL96-01processhasnotbeencompleted.

Aseniorengineerisrequiredtoperformanindependent verification oftheinitialreviewer's work.Thatverification wouldlikelyhaveidentified thisdeficiency.

Thecauseofthiseventhasbeendetermined tobeanapparentknowledge deficiency oftheEHCsystemcombinedwithpoorworkpractices, whichledtheLSFTprocedure developers toconcludethattheEHCpanelwastheactuateddevice.Contributing tothisevent,was theomissionofrelevantinformation whentheLSFTprocedure fortheLevel8turbinetripwasdeveloped.

ThecircuitdiagramsfortheLevel8turbinetripshowtheEHCpanelasacircuittermination.

Thecauseoftheindividual notfindingthisduringtheinitialGL96-01reviewwasagainknowledge deficiency andpoorworkpractice.

Theindividual believedthatsincetheEHC/Turbine Systemisnon-safety related,theactualtripofthemainturbinewassimplyaneconomicissuetopreventturbinedamageandnotforreactorsafety.Basedonthis,theindividual didnotpursuehisreviewbeyondtheEHCpanelinput.

('

NRCFORM30SAREGULATORY COMMLSSION LICENSEEEVENTREPORT(LER)TEXTCONTINUATION PROVEDOMBNO.31100I0(EXPIRES:ESTIMATED BURDENPERRESPONSBTOCOMPLYWIBITlBSINFORMATION COLLKCIION RE(IUESF:

SOA)HRS.FORWARDCOMMENTSREGARDB(G BURDENESIIMATETO THERECORDSANDREPORTSMANAGEMKNI'RANCH (P>>030),UA.~REGULATORY COMMISSION, WASIBNQION>>DC30SSS,ANDTOTIIEPAPERWORK REDUCIION PROJKCP(IIS00104)>>

OFFICEOPMANAGEMENI ANDBUDGET>>WASIBNGION>>

DC30S03.FACLIIYNAME(I)LKRNUMBER(6)SEQUENIIAL NUMBERREVISIONNUMBERPAGE(3)NineMilePointUnit20500041098040103OF04TEXTQ'~apace4reqafraf, meok5danafNRCF~30'~'s)(II)Thiseventisreportable inaccordance with10CFR50.73(a)(2)(i)(B),

"anyoperation orcondition prohibited bytheplant'sTechnical Specifications."

Thepurposeoftheturbinetriponhighwaterlevelistocauseareactorscramtolimittheminimumcriticalpowerratio.NMP2UpdatedSafetyAnalysisReport(USAR)Section15.1.2,Feedwater Controller Failure-MaximumDemand,Subsection 15.1.2.2.3, EffectofSingleFailuresandOperatorErrors,states"InTable15.1-3,thefirstsensedeventtoinitiatecorrective actiontothetransient isthevesselhighwaterlevel(L8)trip.MultiplelevelsensorsareusedtosenseanddetectwhenthewaterlevelreachestheL8setpoint.

Atthispointinthelogic,asinglefailurewillnotinitiateorpreventaturbinetripsignal.Turbinetripsignaltransmission, however,isnotbuilttosingle-failure criterion.

Theresultofafailureatthispointwouldhavetheeffectofdelayingthepressurization "signature."

However,highmoisturelevelsenteringtheturbinewillbedetectedbyhighlevelsintheturbinesmoistureseparators, resulting inatripoftheunit."Inaddition, excessive moistureenteringtheturbinewillcausevibration tothepointwhereittoowilltriptheunit."Basedupontheseotherturbinetripsignalsandassociated reactorscram,theimpactofnothavingthisLevel8tripisnegligible.

Therefore, thiseventdidnotposeathreattopublichealthandsafetyortoplantpersonnel.

Theapplicable LSFTprocedures willberevisedpriortonextuse.2.Thiseventhasbeenreviewedandexpectations reinforced withthepersonnel performing theGL96-01procedure reviews.Thepurposeofthisreviewwastoassurethatpersonnel clearlyunderstand thatanLSFTisrequiredtotestfrominitiating devicetotheactuateddevice.Theverification processforGL96-01willspecifically addresstheLSFTcircuitscopeaspartoftheverification review.Theverification reviewsarescheduled forcompletion bytheendofRFO6.Sincethepersonnel whooriginally developed theEHC-LSFTprocedures arenolongeremployedatNMPC,andCorrective Action2assuredathoroughreview,noadditional trainingiswarranted.

))

FACLrrYNAME(I)UA.REGULATORY COMMISSION LICENSEEEVENTREPORT(LER)TEXTCONTINUATION PROVEDOMBNO,3I300104EXPIRES:ESrMATEDBURDENPERRESPONSETOCOMPLYWm(T)BSB(FORMATION COLLECIION REQUEST:50A)HRS.FORWARDCOMMENTSREGARDE(G BURDENESBMATEToTHERECORDSANDREPORTSMANAGEMENrBRANCH(M30),US.NUCLEARREGULATORY COMMISSION WASHINGPON>>

DC30535>>ANDToTIIBPAPERWORK REDUCIION PROJECI(3I$00104)>>OFFICEOFMANAGEMENr ANDBUDGEr>>WASKNGPON>>

DC20503PAGBO)NineMilePointUnit20500041098SEQUENfIAL NUMBER04REVISIONNUMBER0104OF04TExTQ'score4F>>>>c!4vte>>p(>>ef, areokbfaadhRcFme3!Is('sJpDV.A.Failedcomponents:

none.B.Previoussimilarevents:NMP2hashadanumberofinstances whereprocedure preparation orreviewcausedmissedorinadequately performed surveillance tests.Inaccordance withNMPC'sCorrective ActionProgram,aDeviation/Event Report(DER)wasinitiated toevaluatethistrend.Arootcauseteamwasassembled toevaluatethisoveralltrendtodetermine ifprocessproblemsorothercommonaspectscouldbeidentified.

Requiredcorrective actionswillbetakenasnecessary tocorrectanyidentified deficiencies inaccordance withthecorrective actionprogram.C.IdentiGcation ofcomponents referredtointhisLER:g>>??(?0?i',.",R>>S4>>(r0!

I?+>>@>>>>?pI??li?~@"~'>>?)0 Pt~'qgF'P~'R??>>'>>>>?

?)?f??I'9?

~Api',".~~>>!?)

Yr??ii!?i

@"fg".'I.'s$

j+5'Ligs+rlp'5!'(!)3$

)')?'".0@q'??

".~R(.~?IREE]805,'8YSTEM<&3'.":~z ElectroHdraulioControlN/ATG tl4