Monticello - Maximum Extended Load Line Limit Analysis Plus: Cycle 27 Safety Reload Licensing Report and Request for Additional Information Response
ML13358A372
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/20/2013
From: Fili K D
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML13358A357 List:
References
L-MT-13-126, TAC ME3145
Download: ML13358A372 (3)


Text

@XcelEnergyMonticello Nuclear Generating Plant2807 W County Rd 75Monticello, MN 55362December 20, 2013L-MT-1 3-12610 CFR 50.90U.S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555-0001Monticello Nuclear Generating PlantDocket 50-263Renewed License No. DPR-22Subject: Maximum Extended Load Line Limit Analysis Plus: Cycle 27 SafetyReload Licensing Report and Request for Additional InformationResponse (TAC ME3145)References: 1)Letter from T J O'Connor (NSPM), to Document Control Desk (NRC),"License Amendment Request: Maximum Extended Load Line LimitAnalysis Plus," L-MT-10-003, dated January 21, 2010. (ADAMSAccession No. ML1100280558)2) NEDC-33006P-A, Revision 3, "Licensing Topical Report, GeneralElectric Boiling Water Reactor, Maximum Extended Load Line LimitAnalysis Plus," dated June 2009. (ADAMS Accession No.ML091800512)3) Email from T. Beltz (NRC) to J. Fields (NSPM), "Monticello NuclearGenerating Plant -Draft Request for Additional Information re:Maximum Extended Load Line Limit Analysis Plus LAR Review (TACNo. ME3145)," dated November 26, 2013.In Reference 1, Northern States Power Company, a Minnesota corporation (NSPM),doing business as Xcel Energy, requested approval of an amendment to the MonticelloNuclear Generating Plant (MNGP) Renewed Operating License (OL) and TechnicalSpecifications (TS). The proposed change would allow operation in the expandedMaximum Extended Load Line Limit Analysis Plus (MELLLA+) domain.

Document Control DeskPage 2The purpose of this letter is to provide the NRC with the MNGP cycle 27 SupplementalReload Licensing Report (SRLR) applicable to MELLLA+ conditions and evaluationsand to provide a response to an NRC Request for Additional Information (RAI).Enclosure 1 to this letter provides the MNGP cycle 27 SRLR applicable to MELLLA+conditions and evaluations. The cycle 27 SRLR is being submitted to the NRC to fulfillthe requirements of the MELLLA+ topical report (Reference 2), Limitation and Condition12.4, which specifies that the SRLR for the initial MELLLA+ implementation cycle shallbe submitted for NRC staff confirmation.The SRLR supports the licensing work performed for the MNGP MELLLA+ license.This reload design was initiated prior to the PRIME transition commitment to utilizePRIME for reload analyses. The cycle-specific reload analyses are based on GESTR-M,with one exception, and the peak clad temperature (PCT) impact of PRIME wasevaluated as part of 10 CFR 50.46 Error Notification 2012-01. The one exception is theDetect and Suppress Solution -Confirmation Density (DSS-CD) Backup StabilityProtection (BSP) analysis, which was performed using PRIME. The use of PRIME forthe DSS-CD BSP analysis is consistent with NEDO-33173 Supplement 4-A, Rev. 1,"Implementation of PRIME Models and Data in Downstream Methods," November 2012.Enclosure 2 provides a report from General Electric -Hitachi (GEH) letter,GE-MNGP-AEP-3306, "GEH Response to MELLLA+ EICB RAI," which provides aresponse to the NRC's RAI (Reference 3). Enclosure 2 contains proprietaryinformation.Enclosure 3 provides a non-proprietary copy of the Enclosure 2 RAI response. Thenon-proprietary copy of the RAI response is being provided based on the NRC'sexpectation that the submitter of the proprietary information should provide, if possible,a non-proprietary version of the document with brackets showing where the proprietaryinformation has been deleted.Enclosure 4 provides an affidavit executed to support withholding Enclosure 2 frompublic disclosure. Information in Enclosure 2 contains proprietary information asdefined by 10 CFR 2.390. The affidavit sets forth the basis on which the informationmay be withheld from public disclosure by the NRC and addresses with specificity theconsiderations listed in 10 CFR 2.390(b)(4). Accordingly, NSPM respectfully requeststhat the proprietary information in Enclosure 2 be withheld from public disclosure inaccordance with 10 CFR 2.390(a)4, as authorized by 10 CFR 9.17(a)4.Correspondence with respect to the copyright or proprietary aspects of GEH informationor the supporting GEH affidavit in Enclosure 4 should be addressed to Linda C. Dolan,Manager, Regulatory Compliance, GE-Hitachi Nuclear Energy Americas LLC, 3901Castle Hayne Road, Wilmington, NC 28401.

Document Control DeskPage 3The supplemental information provided herein does not change the conclusions of theNo Significant Hazards Consideration and the Environmental Consideration evaluationsprovided in Reference 1 for the MELLLA+ license amendment request.In accordance-with 10 CFR 50.91 (b), a copy of this application supplement, withoutenclosures is being provided to the designated Minnesota Official.Summary of CommitmentsThis letter makes no new commitments and no revisions to existing commitments.I declare under penalty of perjury that the foregoing is true and correct.Executed on: Decemberq, 2013Karen D. FiliSite Vice-PresidentMonticello Nuclear Generating PlantNorthern States Power Company-MinnesotaEnclosures (4)cc: Regional Administrator, Region III, USNRC (w/o enclosures)Project Manager, Monticello Nuclear Generating Plant, USNRCResident Inspector, Monticello Nuclear Generating Plant, USNRC (w/oenclosures)Minnesota Department of Commerce (w/o enclosures)