ML20091E632

From kanterella
Revision as of 12:33, 13 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to 840516 Request for Description of Plan to Maintain Independence Between Const Implementation Overview Team & S&W Personnel.Const Implementation Overview Would Not Verify or Evaluate Work Performed by S&W Insp Personnel
ML20091E632
Person / Time
Site: Midland
Issue date: 05/23/1984
From: Karr J
STONE & WEBSTER, INC.
To: Quamme D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
SWM-125, NUDOCS 8406010312
Download: ML20091E632 (1)


Text

r 1

ph STONE & WEBSTER MICHIGAN, INC.

?)p P.O. Box 1963, MIDLAND. MI 48641-1963 l JRitEIPAL STAFF Mr. D. L. Quamme L-Q ygmiuc-dec)H3 May 23,1984 Consumers Power Company omA w

v Midland Nuclear Plant A/kA D sE J.0. No. 14509 3500 East Miller Road to MA SWM-125 Midland, MI 48640 30 3cs SGA ML 3

Docket No. 50-329/330 MF File 4dv C10 Proty. il Construrwon Implementation Overview Midland Nuclear Power Plant

Reference:

CPCo Letter, DLQuamme to JEKarr, Subject as Above, Serial No. CSC-7758 of May 16, 1984 The referenced letter requested a description of Stone & Webster's plan to maintain independence between the CIO team and a group of S&W personnel that, potentially, would be implementing the verification reinspection of Midland Plant diesel generators in response to generic concerns identified at other nuclear facilities with units supplied by the same supplier as those at Midland.

This topic was also discussed during the public meeting with the USNRC, CPCo and S&W on May 10, 1984.

The nationwide program for diesel generator reverification is being conducted under the auspices of a joint utility owners' group which is presently being managed by the Duke Power Company.

Stone & Webster's role in the program is to provide inspection personnel and supervision to the owncrs' group to execute the Y

hands-on inspection of units owned by participating utilities.

In this

capacity, S&W personnel perform verification inspections under the overall control of the owners' group and report results to the affected utility and the owners' group management.

Data recipients, in this case CPCo are responsible for analysis of results and formulation of action plans to resolve any identified discrepancies.

In this organizational arrangement, CIO would not verify or evaluate work performed by S&W inspection personnel as this is an owners' group / utility function.

CIO review is limited to the use made of reduced data and subsequent follow-through for any corrective action that might be required.

If further information in this matter is required, please contact the undersigned.

' fr -

,J. E. Karr l

CIO Program Manager

'Mggg JEK:NL cc:

PDR NIReichel,CPCoMidland(site)

.RAWells,.CPCo. Midland (site).

i

'JGreppler; US MCJGlen;Ellynf!L7 MAY 2 5 QW, ho) l JJHarrison, US' NRC Glen' Ellyn, ~IL BLBurgess, US NRC Midland (site)