Forwards Ga Hierzer Providing Addl Info Re Tracked Item 068 Concerning Stop Work on Visual Insp of Nf Hanger Welds
ML20092C277
Person / Time
Site: Midland
Issue date: 06/13/1984
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
STONE & WEBSTER, INC.
References
CSC-7885, NUDOCS 8406210105
Download: ML20092C277 (5)


Text

.

CONSUMERS POWER COMPANY MIDLAND ENERGY CENTER 50&Af CSC-7885 g,gdTransmittalNo:

Date: June 13, 1984 To:

Stone & Webster P O Box 1963 l

Midland, MI 48640

/PRity,l_ PAL STAFF

,/ -

Attached Is:

Partial Response To V

"^

Complete Response To fr

~

PA0 SCS

. @ For Your Information sGA

~

AL _ M e --

sNF File Other

==

Description:==

Bechtel Letter BCCC-9427 dated June 12, 1984 provides additional information regarding Tracked Action Item 068.

M Signature:

[

CC: IJCKeppler, 'NRC ' Region fIII2 f.w/al?

JJHarrison, NRC Region III w/a BLBurgess, NRC Site w/a RAVE 11s, MPQAD w/a BHPeck, MEC w/a NIReichel, MEC w/a DDJohnson, MEC w/a V

j 0

0 SWO$84-001-CN04 N%

Bechtel Constructors Corporation 3500 East Miller Road Midland, Michigan usa Aoore,s: P.O. Box 2167 Midland, Michigan 48640 June 12, 1984 Consumers Power Company P. O. Box 1963 Midland, Michigan 48640 Attention:

D. L. Quamme Site Manager Midland Plant Units 1 & 2 Bechtel Job 7220 STONE & WEBSTER OVERVIEW ITEM NO. 068 B CCC-9427

Dear Mr. Quamme:

This letter is in response to a request from Mr. R. Druin of CPCo-SMO to provide written documentation from B&WCC for resolution to their recent Stop Work on visual inspection of NF Hanger Welds.

Attached please find a copy of B&WCC memo CL-238 dated May 30, 1984, outlining the actions taken t'o resolve the Stop Work.

If we can be of further assistance, please contact John Russell at ex-tension 7594.

Very truly yours, d

I G. A. Hierzer Site Manager GAH/JR/ljg

Attachment:

B&WCC Memo CL-238 cc:

N. Reichel (w/ attach.)

D. Vokal (w/ attach.)

e e.

Babcock &Wilcox a Mcoermott company To l PERSONNEL FILE FOR THOSE LISTED BELOW From 808663@

S. L. TAULBEE - FIELD 0.C. SUPERVISOR - MIDLAND File No.

I Cust.

or Ref.

BECHTEL/ CONSUMERS POWER COMPANY CL-238 Date Subj.

QUALIFICATION OF VISUAL INSPECTORS MAY 30, 1984 l This letter to cover one Custorner and one subject only.

A. C. Ashworth V. E. Booker P. L. Caropino W. G. Chain J. R. Johnson M. L. Miller The following steps have been taken by B&W Construction Company to resolve the concerns of visual weld inspector qualifications.

1)

B&WCC Quality Control Procedure 9-VIS-100, titled, " Personnel Qualification Visual Inspection" was developed to cover the require-ments of ASME Section III 1974 Subsection NF.

2)

A review of the site training courses (see attachment 'A') which have been attended by the Level II Q.C. Mechanical Inspectors (Hanger Reverification) has been performed.

Attachment 'B' contains a list of those Level II Q.C. Mechanical Inspectors that took the VT Examin-ations noting which inspectors are AWS Certified Welding Inspectors.

3)

As required by 9-VIS-100, a general, specific and practical examination was given to the individuals shown in Attachment

'B'.

These tests were given without additional training.

All of the individuals passed the required examinations.

Based on the above, B&WCC has concluded that the on-site training was adequate to train inspectors for visual weld inspection under ASME Section III, Subsection NF. Also, the testing assures that personnel were adequately trained and had a thorough knowledge of visual weld inspection attributes and acceptance criterlac It is B&WCC's determination that the visual weld inspections performed prior to the visual testing and certification process was acceptable and therefore, no reinspection of those welds are required.

If you have any questions regarding the above, please contact me.

S[W 7t.Taulbec

/

S.

SLT/REN/cjk R. E. Kels n Y cc:

File

t ATTACHMENT 'A' 1

SITE TRAINING COURSES Number' Title Hours G-TP-400 General Welding 8

G-TP-M326 Class I Hangers 2.5 G-TP-230 Hanger Tools 1.5 f

G-TP-240 Hanger Walkdown 4

Q-WG-ll2 Visual Examination of Hangers 1

Q-WG-106 Visual Examination of Welds 1

W-WP-100 General Procedure for SMAW

.75 i

W-WP-200 General Procedure for GTAW

.75 Performance Demonstration 2

TOTAL 21.5 f

v i

t e

i 9

[

r ATTACHMENT 'B' QUALITY CONTROL MECHANICAL INSPECTORS Name Certified Weld Inspector Date A. C. Ashworth Yes 4/82 V. E. Booker P. L. Caropino W. G. Chain Yes 5/82 J. R. Johnson Yes 7/83 M. L. Miller Yes 5/84 D

0 e

e