ML20091M785

From kanterella
Jump to navigation Jump to search
Forwards Nonconformance Identification Rept 30 & Quality Action Request RA-00197 Re Tdi & Copes Vulcan,Inc Purchase Orders
ML20091M785
Person / Time
Site: Midland
Issue date: 05/31/1984
From: Reichel N
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
STONE & WEBSTER, INC.
References
CSC-7826, NUDOCS 8406120107
Download: ML20091M785 (5)


Text

~

^

psi CONSUMERS POWER COMPANT MIDLAND ENERGY CENTER

[ddf Transmittal No:

CSC-7826 8'3 3d Date: May 31, 1984 To:

Stone & Webster d

P O Box 1963 Midland, MI 48640 I/FRIMCIPAL STAFF

/

Y {g3 JPRP V hlldO 4

.gs __

'/"#

3# $'

Attached Is Partial Response To c

JRMA

> AO SCS g

Complete Response To g,y g

3 File g g}

For Your Information Other

==

Description:==

NIR-030:

Closed QAR RA-00197 provides complete response to this item.

~

Signature:

2

[

e,wsm.wamaggy vymwaswa tJCKeppJeriNRCfRegi af1IIiJp/a4 cc:

JJHarrisen, NRC Region III w/a RJCock, NRC Site w/a RAWells, MPQAD w/a BHPeck, MEC w/a NIReichel, MEC w/a DDJohnson, MEC w/a tJUN 7 1984 8406120107 84

{DRADOCK05000h9

/ 40(

PDR L_

m A n sa sik s a r V R I U I W /Miin 5 o^ " ""*"*'

MIDLAND PROJEcr RA-0o197 OUALITY ASSURANCE DEPARTMENT

7. Date issued
8. Reviseorg M

4/teIs+

MA M

QUALITY ACTION REQUEST s.

pc'ssjer-Page

/

of 2

1. Requirement
10. ASME Related Su.-rtt.sclaol Ske i lad itse AIE
  • 3'o

% " M*

SN

' " * ' ' ~

S <e a thelud sfac t ud,+,,

Nte # 20

11. Potential 50.55(e)

Yes No

3. QAR Originated by
4. Discipline / Division /Section
5. Response Due Date
12. Date Reported to MPQA Mgr C. L. S P;a k.s N/A S/10 /84-N/A
13. Action item No.
15. Item Priority
17. S/U Code
19. Action Organizatiort
20. DAR Revi by 50 (,766 (o

N/A BoAtcL Rjed O A f/M J

10. Discipline
16. Trend cme
18. Resb Code Q,*

2'1. DatelE ff Y N/A BB 50002.

SPQAC - SG b

~

4'

23. Cause
23. Proposed Corrective Action

.s cG A77 ACHED TEE ATTKHE75

[

  • /J t

e

84. Responsi',s CFgenacticrJPerson 25 Proposed Completion Date

/ bd bT71/! d if t..'

C /,

Ma V

'I / 9 ['/

26. Onposit.o't Co ce k'AR Reviewwer

' De te

.PQAE (ASME Ontv)

Date

27. Disposition Action Taken SEs rftrdeN'e~b
28. Mettsod of Desposition Verification
29. QAR Closed by db

/

M QAD

'Date f

hf$ 0/h

%Acc.pteMe D unaccepteMe Osup.,cedinQAR aasce'iair're oe'v>

o te M-4/1 A (Rev tl a.

RM -80 6 (')

SHEET 1 OF I

i-STONE AND WEBSTER MICHIGAN, INC.

GAR # f^-Cl97

%c 2 of 2 NONCONFORMANCE IDEN'ilFICATION REPORT (NIR)

DATE NONCONFORMANCE OBSERVED CHECKLIST NO.

NIR NO.

3-27-84 N/A o3o IDENTIFICATION AND LOCATION OF ITEMS / DOCUMENTS / ACTIVITY:

/;v 'c c.

P.O. 7220-F-64832 (A) Rev. 2 (Transamerica DeLaval Inc.)/BPC Purchasing Dept.

P.O. 7220-F-64487 (A) Rev. 1 (Copes Vulcan Inc.)/BPC Purchasing Dept.

DESCRIPTION OF NONCONFORMANCE Above purchase orders were written and approved by MPQAD for purchasing of ASME material, for ASME applications, from Non-ASME material supplier.

In accordance with BQAM-ASME III Rev.

7 Section 4000 paragraph 4313 and paragraph 4314 "PQAE shall detemine that items procured are only from acceptable manufacturers prior to award."

In accordance with paragraph 4311, files of currently acceptable manufacturers of ASME Section III Div 1, items are maintained by procurement.

Transamerica DeLaval Inc.

and Copes Vulcan Inc.

are not on BPC ASME Evaluation Supplier Listing (E.S.L.)

[M INITIATOR 2"

REVIEWER

/

8* h

@//-///

DATE DATE CORRECTIVE ACT!ON TAKEN y

l l

l i

ACTION VERIFIED: SAT.O UNSAT.O NEW NIR NO.

CONCURRENCE BY CIO PROGRAM CIO INSPECTOR.

MANAGER DATE DATE DATE m

CIO REMARKS


e e- - -, - - - -, - - - - - - -

--wm-----,-~--m

Bechtel Power Corporation Post Othee Box 2167 Midland, Michigan 48640 May 3, 1984 Consumers Power Company P.O. Box 1963 Midland, MI 48640 Attention:

R.A. Wells Midland Plant Units 1 & 2 Bechtel Job 7220 COMPLETE RESPONSE TO QAR RA-00197 MAD - 2843

Dear Mr. Wells:

This is considered a complete response to QAR RA-00197, Transamerica Delaval Inc. and Copes Vulcan Inc. are appraved suppliers and are listed on the Bechtel Evaluated Supplier List (ESL).

This was verified by the PQAE prior to placement of the purchase orders.

These vendors are not on the ASHI special listing because they do not fall within the scope of that list.

The ESL is a complete liet of all PSQD data available for all Bechtel ruppliers of either Q-derignated safety related engineered equipment or ASME Section III materials (NCA-3800 Nuclear Meterial).

The ESL-NCA-3800-Quality (ASME listirg) is a listing of the ASME Section III Naterial Suppliers whose-quality programs meet the requirement of l

the Bechtel Power Corporation Quality Program.

The BQAM-ASME III Rev. 7 Secticn 4000 paragraph 4315 states for manu-facture's work covered er.tirely by the requirements of the ASME Section III, Div. 1, possession of the appropriate N-type code symbol stamp and review of the bidder's Certificate of Authorization constitutes an acceptable minimum requirement for supplier evpluation.

l The material which.was procured from Transamerica Delaval Inc. and Copes l

Vulcan Inc. were replacement parts for N-stamped components and both vendors possess the required N and NPT code symbol stamps and Certificates of Authorization to supply the items identified on the purchase orders.

4

--_ _.. _. -. _ -, - - ~,

y-Pcge 2 Bechtel Power Corporation We conclude that the purchase orders were processed and meet the established QA program requirements. Consequently we feel that this is not a nonconforming condition.

If you have further questions, please contact Ed Stankiewicz at extension 7102.

Very truly yours, Marion f Dietrich Project Quality Assurance En inee MAD /E /djn Written Response Requested:

No cct F. Pointe C. Spinks O

.