Text
e CONSUMERS POWER COMPANY MIDLAND ENERGY CENTER Transmittal No:
CSC-7821 p
@./
Q v
Date: May 31, 1984 To:
Stone & Webster P O Box 1963
~
Midland, MI 48640 I, Pa l t inAL s rAFF Y
l Attached Is:
Partial Response To
(-Q lg pc n1 X
Complete Response To
.3 i,
4 x...
3 For Your Information
'-' -[
File Other
==
Description:==
Tracked Information Item 080.
O Signature
/[
6 cc
'JGKeppler, NRC Regi
- 111
- w/a -
JJHarrison,- MRC Region III ~w/a RJCook, NRC Site w/a RAWells, MPQAD w/a BHPeck, MEC w/a NIReichel, MEC w/a k DDJohnson, MEC w/a fh 4D 8406060225 840531 k
PDR ADOCK 05000329 U
1 ITEM / HOLD POINT NOTIFICATION FORM Sheet 1 Of 1 ITEM H LD POINT NUMBER STONE & WEPSTER Ob CONSTRUCTION IMPLEMENTATION O TRACKED ACTION ITEM OVERVIEW
@ TRACKED INFORMATION ITEM N/PldNP #FCIEd# MANTJ.'0 NO. /+50f O TRACKED RECOMMENOATION ITEM O uNTRACxED iTEu REFERENCE (S)
CPCo Memo DFR 61-84 dated 4/27/84 O HOLD POINT NOTIFICATION CONDITION DETAILS The short-term schedules, dated 4/27/84, indicate that work will be inspected (QVP) to various PQCIs, including PQCIs P-1.90, PI-2.90, M-2.00, P-1.10, P-2.30 and PI-1.90.
The list of available certifications by PQCI, dated 4/13/84, does not show personnel certified to the above PQCIs.
CIO has not determined whether any inspections have been performed by MPQAD personnel prior to their certification.
(PAGE O YES NO'S)
NO ATTACHMENTS DATE RESPONSE REQ'D.
INIT R/
INjTIATION PPROVED/DATE gg' 5/17/84 k&ydhrG S'384 ~}, { 1,j, &Q 7
RESPONSE (SEE NOTE)
F Attached memo BMPalmer to NIReichel dated May 11, 1984 provides a complete response to
]
this item.
9 (PAOR O YeS No i O NO ATTACHMENTS EST. CORRECTIVE ACTION RESPONDENT TITLE DATE I
NY WhEL 0*YY
/
T
$u:r r hp C/.2//J2$
COMPLETION DATE
- ^
RESPONSE ACCEPTED DATE RESPONSE VERIFIED / CLOSED D' ATE /
C;373
t) C Autt OP 08804WEO CON 0lfl0N 8) CORRECfivt ACfl0M T AKEN 3) PRtWENf1VE ACfl0N TAREM 500-021(NL)
J
THIS IS BEING REDISTRIBUTED TQ CORRECT A DATE.
To NIReichel raos '
BMPalmer n,.< ara sun Consumets 1
t Date May 11, 1984' Company kaace' MIDLAND ENERGY CENTER PROJECT -
CIO TRACKED INFORMATION ITEM 080 surcauu FILE 24.2 comacsposecuce BMP 48-84 cc JTChristy DFRonk DESands DATaggart
' The MPQAD response to SMO concerning the above item is detailed below.
The referenced short term schedule, dated 4/27/84, does not include PQCIs M-2.00 or P-1.10.
The " list of available certifications by PQCI, dated 4/13/84" appears to be a slide used in Management Review for Turbine Roll.
This slide detailed PQCIs anticipated 'for Phase 2 work, and was used strictly for presentation purposes.
Since PQCIs P-1.90, PI-2.90, P-2 30, and PI-1.90 are used exclusively for Phase I reinspections, they did not appear on this listing.
Official records of certifications are available for review through normal channels. MPQAD does not perform inspections prior to certification, and has
-formal mechanisms in place to preclude this.