Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20140C680 | 15 June 1984 | Responds to .Thrust of Misunderstood. Ltr Requested Voluntary Production of Certain Matls Used in Dow Vs Consumers Litigation.Svc List Encl.Related Correspondence | |
ML20092C277 | 13 June 1984 | Forwards Ga Hierzer Providing Addl Info Re Tracked Item 068 Concerning Stop Work on Visual Insp of Nf Hanger Welds | |
ML20092C205 | 12 June 1984 | Forwards Complete Response to Tracked Action Item 088 Re Module 120D in Auxiliary Bldg | Backfit |
ML20197G955 | 7 June 1984 | Summarizes 840518-0604 Const Implementation Overview Evaluation of Results of Const Completion Program Phase I Activity in Module 120D (Auxiliary Feedwater Pump Room) & Preparations for Phase 2 Work | |
ML20091R732 | 6 June 1984 | Forwards Nonconformance Rept A-00124 Re Concrete Adhesive in Warehouse & Field.Documentation Previously Provided on 840606 by D Brown | |
ML20091R261 | 6 June 1984 | Forwards Nonconformance Rept C-03736 Re Welds on Door 23 of Auxiliary Bldg.Document Previously Provided on 840606,per R Butler Request | |
ML20091R673 | 6 June 1984 | Advises That Util Response to Const Implementation Overview Action Item 078 Acceptable | |
ML20091R711 | 6 June 1984 | Forwards Nonconformance Repts C-03732,C-03736 & C-01006 Re Watertight Doors,Frames & Welds,In Response to N Watherell 840601 Request | |
ML20091R264 | 6 June 1984 | Forwards Nonconformance Rept A-00081 Re Channel Embeds in Auxiliary Bldg W/Items Attached,In Response to D Holt 840606 Request | |
ML20091R238 | 6 June 1984 | Forwards Nonconformance Rept A-00154 Re Expansion Anchors in Metal Decking | |
ML20091R715 | 6 June 1984 | Forwards Nonconformance Rept C-03574-HV Re Large Bore Hanger Assembly in Control Room.Documentation Previously Provided on 840605 by D Holt | |
ML20091R277 | 6 June 1984 | Forwards Nonconformance Repts C-01539,M01-8-2-415,C-01018 & 4778 Re Level Switches,In Response to G Hanne 840606 Request | FLEX |
ML20091R260 | 5 June 1984 | Forwards Diia E-1.0 Rev 17/V2636 Log 00013 & E-10 Rev 17/V2323 Log 00006,per G Carter Request.W/O Encl | |
ML20091R281 | 4 June 1984 | Forwards Complete Response to Item 6 of Module 120D List Re Welder Identification Numbers Inconsistent W/Old Verification Records | |
ML20091N232 | 1 June 1984 | Forwards Const Implementation Overview Item 078 Re Use of Pencil on Audit Rept | |
ML20091N178 | 1 June 1984 | Forwards Nonconformance Identification Repts 029 & 031 Re Clerical Errors or Omissions in Procurement Documents | |
ML20091R559 | 1 June 1984 | Forwards Complete Response to Tracked Recommendation Item 082 Re Audits of Applicable Criteria of 10CFR50,App B for Site Contractors | |
ML20091N261 | 1 June 1984 | Forwards Response to Tracked Action Item 085.W/o Encl | |
ML20091M660 | 31 May 1984 | Forwards Bechtel 840531 Response to Const Implementation Overview Tracked Action Item 068 Re Code Editions Implemented for Component Support Installation | Nondestructive Examination |
ML20091M785 | 31 May 1984 | Forwards Nonconformance Identification Rept 30 & Quality Action Request RA-00197 Re Tdi & Copes Vulcan,Inc Purchase Orders | |
ML20091M855 | 31 May 1984 | Forwards Bechtel Response to Nonconformance Identification Rept 030 Provided in Closed Quality Action Request RA-00197 Re Purchasing ASME Matl from non-ASME Matl Supplier | |
ML20091J854 | 31 May 1984 | Forwards Item/Hold Point Notification Form for Const Implementation Overview of Tracked Info Item 080 Re Mgt Review for Turbine Roll | |
ML20091N052 | 30 May 1984 | Forwards Nonconformance Rept C-00082 | |
ML20091N030 | 30 May 1984 | Forwards Nonconformance Rept C-00028 | |
ML20091J927 | 30 May 1984 | Forwards Partial Response to 840523 Tracked Action Item 085 Re Module 120D | |
ML20091N242 | 30 May 1984 | Forwards Nonconformance Rept C-03119-HV Re Loose Nuts on RGS-114 Pipe Clamp | |
ML20091H765 | 29 May 1984 | Forwards Complete Response to Nonconformance Identification Rept 22 Re Document Control & Update of Work Station Logs as Requested in Tracked Action Item 086 | |
ML20091J099 | 25 May 1984 | Forwards Nonconformance Repts C-03018,C-02181 & C-02818-HV Re Voids in Grout,Upper South Anchor 1-3/8 Inch from South Edge of Plate,Lower North Anchor Installed 2-5/8 Inch from C4 Embed & Upper North Anchor 4-1/8 Inch from C4 Embed | |
ML20091H864 | 25 May 1984 | Forwards Nonconformance Repts C-03719-V & C-03727-V Re Welded Connections of Structural Floor Framing & Structural Steel & Miscellaneous Metal,Respectively | |
ML20091J280 | 25 May 1984 | Forwards Nonconformance Rept C-03461-HV Re Welding Deficiency in Rigid Hanger Assembly of Auxiliary Feedwater Discharge Sys | |
ML20091G959 | 25 May 1984 | Provides Document Control Assurance Group Final Response to Nonconformance Identification Rept 027 Re Deficiencies of Document Stations 59 & 501 | |
ML20091H737 | 25 May 1984 | Forwards Nonconformance Rept C-01006 Re Welding on Doors & Frames Not in Compliance W/Project Approved Vendor Drawings & Approved Welding Procedure Specs | |
ML20091E632 | 23 May 1984 | Responds to 840516 Request for Description of Plan to Maintain Independence Between Const Implementation Overview Team & S&W Personnel.Const Implementation Overview Would Not Verify or Evaluate Work Performed by S&W Insp Personnel | |
ML20091B383 | 21 May 1984 | Forwards List of Items Const Implementation Overview Will Review,Evaluate or Verify Prior to Releasing Const Implementation Overview Hold Point 007 for Module 120D | |
ML20091B280 | 21 May 1984 | Forwards QA Dept Response to Audit AMS-84-26,per J Karr Request | |
ML20091E749 | 21 May 1984 | Confirms That Work W/P Mudd in Establishing Requirements Re Const Implementation Overview Acceptable & Should Continue | |
ML20091B640 | 18 May 1984 | Forwards Const Implementation Overview Nonconformance Rept 5063-HV Re Lack of Criteria for Matl Damage in Pqci P230R | |
ML20091A710 | 18 May 1984 | Forwards Nonconformance Rept C-03078-V Re Unqualified Welds | |
ML20091B656 | 18 May 1984 | Forwards Const Implementation Overview Nonconformance Repts C-002241-V & C-002243-V Re Hollow Sounding Grout in Svc Water Pump Walls & Floor | |
ML20091C454 | 18 May 1984 | Forwards Nonconformance Rept 3534 Re Corner & Lada Sway Struts & Spring Cans | |
ML20091A588 | 18 May 1984 | Forwards Nonconformance Rept M01-92-074 Re Welding Defects on Structural Support Steel,Per 840515 Request.List of Defective Welds Encl | |
ML20091B892 | 18 May 1984 | Forwards Nonconformance Rept C-02299-V Re Concrete Placement | |
ML20091A688 | 18 May 1984 | Requests Necessary Documentation for Listed Items for Const Implementation Overview for Module 120D | |
ML20091A703 | 18 May 1984 | Notifies of 840514 Transmittal of Listed Nonconformance Repts | |
ML20091B387 | 17 May 1984 | Advises That Partial Response to Const Implementation Overview Item 068 Evaluated & Determined Unacceptable. Requests Util Advise Const Implementation Overview Team of Cause,Resolution & Corrective Action for Cited Condition | |
ML20091B463 | 17 May 1984 | Requests Documentation for Listed Drawings Re Module 120D Const Implementation Overview | |
ML20091B386 | 17 May 1984 | Forwards RA Wells 840514 Memo Re Reinsps to Close Open Quality Items & Summary of 840511 Meeting W/Nrc to Discuss Insps,Verifications or Tests | |
ML20084R071 | 17 May 1984 | Informs That Util Objects to 840504 Discovery Request on Behalf of Intervenor B Stamiris.Request Impermissibly Broad & Greatly Exceeds Limits on Discovery Imposed by Aslb.Svc List Encl.Related Correspondence | |
ML20090J222 | 16 May 1984 | Forwards Comments on Bechtel Responses to Confirmed Items C-101 & C-117-2,3 Re Comparison of Auxiliary Bldg Finite Element & Seismic Stick Models.Comments Define Addl Info Needs | |
ML20091J840 | 16 May 1984 | Requests Documentation for Listed Const Implementation Overview Items |