ML20091P122

From kanterella
Revision as of 11:51, 13 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises of Assignment as Member of Task Group to Reevaluate Structural Design & Const Adequacy of Diesel Generator Bldg
ML20091P122
Person / Time
Site: Midland
Issue date: 08/08/1983
From: Kuo P
Office of Nuclear Reactor Regulation
To: Romney N, Tan C
Office of Nuclear Reactor Regulation
Shared Package
ML17198A223 List: ... further results
References
CON-BOX-08, CON-BOX-8, FOIA-84-96 NUDOCS 8406120600
Download: ML20091P122 (1)


Text

'

[,,,,, %,,

UNITED STATES

!\\

['o NUCLEAR REGULATORY COMMISSION

,E WASHING TON, D. C. 20555 c

+.,..v /

AUG 8.1983 MEMORANDUM FOR:

C. P. Tan Norman Romney St'ructural Engineering Section B Structural and Geotechnical Engineering Branch, DE THRU:

GeohgeLear, Chief gt, Structural and Geotechnical Engineering Branch, DE S'

FROM:

P. T. Kuo, Structural Engineering Section 8 Leader Structural and Geotechnical Engineering Branch, DE -

d

SUBJECT:

EVALUATION OF LANDSMAN S CONCERNS REGARDING DIESEL GENERATOR BUILDING AT filDLAND

Reference:

Memorandum from R..H. Vollmer to D. G. Eisenhut, dated July 21, 1983 Per the enclosed memo from R. H. Vollmer to D. Eisenhut, a task' group to re-evaluate the structural design and construction adequacy of the Midland Diesel Generatos' Building has been formed and I have been designated as the leader of the group. You are assigned as members of this group.

The mission of the group is described in the enclosure.

1

,/q.-)'

i

..,- - - r -

T. Kuo tructural Engineering Section B Leader Structural and Geotechnical Engineering Branch, DE

Enclosure:

As stated cc: w/o enclosure R. H. Vollmer J. P. Knight G. Lear 0406120600 B40517 bE 6

PDR.-

A

.