Text
,
~
g
__/RINQlPALSTAFF MA f6CFRP D/RA
' ~
JE To D'LQuamme, Midland Energy Center A'/RA
'jR*A S FI RC ORMA
/
PAQ SCS V'O SGA ML t
FROM
~ BHPeck, Midland Energy Center Wp p;ie ggg DATt March 16, 1984 Power SUBJECT MIDLAND ENERGY CENTER CWO 7020 MEETING NOTES - TURBINE ROLL File:
0655 UFI: '99*08 Serial: CSC-7470 conacseonocuct CC RAWells, MPQAD Meeting Attendees This memorandum documents the meeting held with the Nuclear Regulatory Com-mission (NRC) on March 5, 1984 in Glen Ellyn, Illinois to discuss approval of-
' Construction Completion Program (CCP) Phase I activities to support the Unit 2 Turbine Roll miles,t$ne.
T,he purpose of the meeting was to provide addition-al information -to the NRC po supplen}ent the February 15, 1984 letter from
.DLQuamme to JHarrision,-. Serial CSM-0734 which requested release of Phase I activities for the Turbin'e Roll milestone. Attachment 1 provides the meeting notes. Attachment 2 provides a list of attendees.
1 s
-_s O
<F b-A F
9 3
s 8404030348 840316 PDR ADOCK 05000329 A
Attschesnt 1 MEETING NOTES FROM TURBINE ROLL MEETING WITH NRC i
1.
System OEAA - Need to do more th,an the 72'; i.e. part below water plus the part below the grating (which will also be inaccessible after flood-ing of the bay).
(*RRice) 2.
Q TOES - Perform a complete reinspection on these - by MPQAD.
3.
Must resolve any differences in drawings for TOES before they go to GSO -
i.e. make sure the hanger is of the right material before it is finished off.
4.
Some work items will be added as a result of Project Engineering stress walkdowns.
5.
System Interaction work by M. Jones: This will also add to the work scope.
6.
Rigid hangers vs. snubbers This is a concern of Isa Yin. This is an item for stress walkdown alsc..
7.
For turned over items / systems - No Status Assessment to be done (this was actually done at the time of turnover).
a.
Closed irs - QVP b.
Open IR - TOE and perform a complete reinspection of the work to a new PQCI.
8.
Interface between CCP and turned over items Arno Buhrer's chart could be useful in showing.this. Do we need to put the CCP process for turned over items on this chart?
(*BHPeck) 9.
For non-turned over systems:
4 Closed IR -- QVP only (Inspection Status Assessment)
Open IR - QVP and Status Assessment 10.
What is the status of Arno Buhrer's chart?
(*BHPeck)
- 11. Discussion on going from Phase I to Phase II.
Is everything in the module done? Need to be able to make a statement about completeness of' work.
System commodities span and cross the boundaries of the area.
TR0384-0001A-CN02
~
s L.
- ~ - -
zh L :
j i
'12.', Design changes on turned-over systems.
NRC needs to approve - Bruce' Burgess ~(*REMcCue)
Two.DCPs.were. approved last summer by Ross Landsman.
'For future DCPs, write J. Harrison a letter asked -for approval to per-ford (*REMcCue)
- 13.. Possibility in the future about turning things back to construction for completion of a large number of DCP type work. NRC would lEke to be in-
, formed about this.
(*REMcCue)
'14. -Discussed the supports for the traveling screen and slice as tes - these are Q..
"~
'Were thnae installed and inspected as Q?
(*BHPeck)
Need to follow-up on'this week. Jay Harrison would like somte feedback on
- this 3/7 or 8.
- 15. ~ Reviewed Open Items' from REMcCue/ Bruce Burgess inspection of TOES conduc-ted' week of.2/27/84.
Action Items'here for REMcCue and BHPeck (*BHPeck/REMcCue)
- 16. Discussed " major and minor" TOES.
This category breakdown is not used. TOES.are not.considerstd major items.
- 17. - Work on Q TOES was stopped by REMcCue on 2/24/84, pending omtcome of
. discussions between REMcCue and Bruce' Burgess.
- 18 '.
Status of " Construction Ground Rules":-
Get a copy of the latest status of these and go over with Jmy Harrison on 3/7/84.,(*BHPeck)F l
'19'.
-Best guess of.a cold hydro date.
Depends on CCP. activities.
March or-April'of 1985, at best - REMcCue NRC currently plans to start looking at us about October,1984.
- 20.. Discussed draft letter.
r Jay Harrison would like to see theLresults/get' a' briefing om Phase I
. Management Review.for the 2TR work.' (*BHPeck)
~
. Send this letter out'to NRCJon 3/6/84"by telefax (*BHPeck)
.TR0384'-0001A-CN02 m
. = - -,-, -.
.-.w -.
L -
- 21.. Jay Harrison will try to' bring us the: approval for 2TR on 3/7/84.
~
22.
Brief discu'ssion of future CCP approvals / releases, and current status of CCP.
A;three month backlog for Statu's Assessment is desired by CPCo.
l This would be another 10-15 modules.
Go'over this on 3/7/84 with J. Harrison.
Before we get the next release, NRC wants:
+ Lessons Learned
+ Changes Made to System as a result
+ Status of Items to date in Phase I
- Denotes; follow-up item and responsible person.
.BHPeck' 3/16/84 O
e
- TR0384-0001 A-CN02'
' Attachm:nt 2 i
4 i
?
LIST OF ATTENDEES-
. JJHarrison, USNRC-RLandsman, USNRC
- BBurgess, USNRC-BHPeck, CPCo DLQuamme, CPCo
/
JClark, CPCo-MPQAD DTaggert, CPCo-MPQAD RMcCue, CPCo RRice, CPCo JTMinor, Bechtel i
6 e
e 4
1 4
-TR0385-0001A-CN02
.