l 4
April 4, 1985 MEMORAMOUN FOR: Sharon R. Connelly, Director, Office of Inspector. and Auditor FROM:
James G. Keppler, Regional Administrator, Region III
SUBJECT:
ALLEGER SUGGESTED THE NRC STAFF MAY HAVE ACTED IMPROPERLY DURINGINSPECTIONSATMIDLAND(50-329;50-330) i Region III contracted with Bro'okhaven National Laboratory to conduct inspections into certain allegations made by a Government Accountability Project witness involving the Midland Nuclear Power Station. Brookhaven Laboratory categorized the allegations and identified four allegations "to be referred to the NRC Office of Investigations (or other appropriate agency) for resolution." My Enforcement and Investigation Coordination Staff has reviewed the Brookhaven reconnendations (Enclosure 1) and determined that two allegations suggest improper conduct by unspecified members of the Region III staff. Since this conduct was not directed toward any specific members of the staff and appears generic in nature, we have directed each of our technical of allegations during divisional meetings (Enclosure 2) practices and handling divisions to reemphat,1re regional policy on inspection Accordingly, I am fomarding this to you for your infomation. Based on.the actions we have taken we are not requesting or suggesting any action on your part; however, we will cooperate with you if you should detemine that action on your part BrookhavenInspectionReport(Enclosure 3)pyofthepubliclyavailable is appropriate.
I am also forwarding a co j
Mr. Charles H. Weil, Region III Investigation and Compliance Specialist, is the Region III point of contact in this matter. Should you or your staff have any questions, please feel free to contact Mr. Weil at FTS 388-5535.
Original t1gned by Jares G. Keppler James G. Keppler Regional Administrator
Enclosures:
As stated 8512190201 851204 NS0 LOG 249 PDR RIII J RIII RIII RILI RIII W
f gG g
Well/jr Tambling BMson Davis Keppler 4/3/85 4/ 3,/85 4/3 /85 4/J/85 4/ J /85 c
f.
q e
b i
.b[
)j' ht.a James w cook
.\\
j-Ub[s.e)
Vsce PresWens gProfacts Enginernag and Constmeteen
- FhiC?l1Y fr.11.1 1
\\
t
~
Generet OM6ces 1946 weet Pernell Mons, Jocheon, Me 49201 * (S17) 70s 0453 jv g-G z
Sn. v..%
m
-2.{. y_;
Ap'ril 19,1985 s
i l
- n. %
l Mr J G Keppler, Regional Administrator U S Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn IL 60137 MIDLAND ENERGY CENTER CWO 7020 BROOKHAVEN NATIONAL LABORATORY REPORT CONCERNING WELDING PROGRAM ALLEGATIONS FILE 0505.2/0.4.2/UFI SERIAL 32225
REFERENCE:
(1) Charles Norelius letter to J W Cook, dated March 22, 1985 transmitting BNL Report on Welding Allegations, dated January.1985 Thank you for the BNL report on welding allegations attached to the referenced letter.
S.
We are pleased to get a portion of the issues identified in the report closed.
We had been conducting detailed discussions prior to the project shutdown to support resolution of the issues. Technical resources are no longer available to further the investigation. For this reason we believe it impracticable to bring the remaining open issues to conclusion at this time.
However, in the event of a Project restart we would pursue reinstituting a full technical investigation of all the issues still pending, as identified in your letter, and determine the most practical way to resolve them.
Therefore, we are taking no further action at this time on the open issues other than entering them into our commitment tracking system. At the time of Project restart we will bring specific suggestions to the NRC Staf f for resolution of each item, such as utilizing the CCP or IDVP or other alternate solutions.
-A JWC/WRB/lr CC RFWarniek, NRC Region III JJHarrison, NRC Region III RBlandsman, NRC Region III 4P l(,
OC0485-07204A-MP01 APh 2 2 585
o
(
g o
2 OM/0L SERVICE LIST Mr Frank J Kelley Atomic Safety & Licensing Actorney General of the Appeal Board i
State of Michigan U S Nuclear Regulatory Commission Ms;Carole Steinberg Washington, DC 20555 Assistant Attorney General Environmental Protection Division Mr C R Stephens (3) 720 Law Building Chief, Docketing & Services Lansing, MI 48913 U S Nuclear Regulatory Commission Office of the Secretary Washington, DC 20555 Mr Myron M Cherry, Esq Suite 3700 Ms Mary Sinclair Three First National Plaza 5711 Summerset Street Chicago, IL 60602 Midland, MI 48640 Mr Wendell H Marshall Mr William D Paton, Esq RFD 10 counsel for the NRC Staff Midland, MI 48640 U S Nuclear Regulatory Commission Washington, DC 20555 l
Mr Charles Bechhoefer, Esq Atomic Safety & Licensing' Atomic Safety & Licensing Board Panel Board Panel f
U S Nuclear Regulatory Commission U S Nuclear Regulatory Commission East-West Towers, Room E-413 Washington, DC 20555 Bethesda, MD 20014 Ms Barbara Stamaris Dr Frederick P Cowan 5795 North River Road 6152 N Verde Trail Rt 3
{
Apt B-125 Freeland, MI 48623 Boca Raton, FL 33433 Dr Jerry Harbour Mr Fred C Williams Atomic Safety & Licensing Isham, Lincoln & Beale Board Panel 1120 Connecticut Ave. NW, Suite 840 U S Nuclear Regulatory Commission Washington, DC 20036 East-West Towers, Room E-454 Bethesda, MD 20014 Mr James E Brunner, Esq Consumers Power Company Mr M I Miller, Esq 212 West Michigan Avenue Isham, Lincoln & Beale Jackson, MI 49201 Three First National Plaza 52nd Floor Chicago, IL 60602 Mr Steve Cadler, Esq Hr John Demeester Esq 2120 Carter Avenue Dow Chemical Building St Paul, MN 55108 Michigan Division Midland HI 48640 Mr P Robert Brown Clark, Klein & Beaumont Ms Lynne Bernabei 1600 First Federal Bldg Government Accountability Project Woodward Ave 1901 Q Street, NW Detroit, MI 48226 Washingten, DC 20009 CC0485-07204A-MP01