Text
'
e s
February 22, 1985 Docket Nos.: 50-322 50-329/330 50-413/414 50-440/441 50-445/446 MEMORANDUM FOR:
Chairman Palladino Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Commissioner Zech FROM:
Hugh L. Thompson, Director Division of Licensing
SUBJECT:
BOARD NOTIFICATION 85-018 TRANSCRIPT OF MEETING HELD ON FEBRUARY 11, 1985, BETWEEN THE NRC AND THE TRANSAMERICA DELAVAL, INC.
(TDI) DIESEL GENERATOR OWNERS GROUP In accordance with procedures for Board Notifications, this information is being provided directly to the Commission. The appropriate Boards and Parties are being informed by copy of this memorandum. This information is relevant to all facilities that have diesel generators manufactured by TDI including Shoreham, Midland, Catawba, Perry, and Comanche Peak which are currently before the Commission.
On February 11, 1985, the NRC and its contractor, Battelle Pacific Northwest Laboratory (PNL), met with the TDI Owners Group (0G) to discuss PNL's findings and conclusions with regard to the Phase I program and to discuss any outstanding questions which PNL had for the Owners Group. The Phase I program is a review of sixteen TDI diesel components with design or n.inu-facturing concerns.
A discussion of each of the sixteen components and a set of viewgraphs used by PNL is included in Enclosure 2.
The primary area of disagreement between PNL and the OG is in the surveillance needed to assure continued satisfactory performance of the components. As a result of the discussion, a better under-standing of each others position was developed and PNL indicated that they would consider the OG comments prior to finalizing the Phase I program technical evaluation reports.
Od r,~
p 3.
- a Hugh L. Thompson, Director Division of Licensing
Enclosures:
1.
List of Facilities w/TDI DGs 2.
Transcript cc:
See next pace
~
,fA Db SEPB:DL4'pt TDI:
- t' D:6 d+0
[
frd CONCURRENCE:
'[ 2/A/pson TMichaeJs:mn CBerlinger RStark om 2/g/8E-2/sl/85~
85 2/j/85 2
b50r.fl005t_ _
I
I W
,,A UNITED STATES
+
fJUCLEAR REGULATORY COMMISSION g
- j WASHINGTON, D. C. 20555 g
/
February 22, 1985 Docket Nos.: 50-322 50-329/330 50-413/414 50-440/441 50-445/446 MEMORANDUM FOR: Chairman Palladino Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Commissioner Zech FROM:
Hugh L. Thompson, Director Division of Licensing
SUBJECT:
BOARD NOTIFICATION C18 TRANSCRIPT OF MEETING HELD ON FEBRUARY 11, 1985, BETWEEN THE NRC AND THE TRANSAMERICA DELAVAL, INC.
(TDI) DIESEL GENERATOR OWNERS GROUP In accordance with procedures for Board Notifications, this information is being provided directly to the Commission. The appropriate Boards and Parties are being informed by copy of this memorandum. This information is relevant to all facilities that have diesel generators manufactured by TDI including Shoreham, Midland, Catawba, Perry, and Comarche Peak which are currently before the Commission.
11, 1985, the NRC and its contractor, Battelle Pacific Northwest On February (PNL), met with the TDI Owners Group (0G) to discuss PNL's Laboratory findings and conclusions with regard to the Phase I program and to discuss any outstanding questions which PNL had for the Owners Group. The Phase I program is a review of sixteen TDI diesel components with design or manu-fac ring concerns.
A discussion of each of the sixteen components and a set of viewgraphs used by PNL is included in Enclosure 2.
The primary area of disagreement between PNL and the OG is in the surveillance needed to assure continued satisfactory performance of the components. As a result of the discussion, a better under-standing of each others position was developed and PNL indicated that they would consider the OG comments prior to finalizing the Phase I program technical evaluation reports.
/
hth:b'
$L'At C Hygh L.d'nom 6bn@irector
Enclosures:
% 'MivisionofLicensing 1.
List of Facilities w/TDI DGs
(
2.
Transcript g
cc:
See next page
h The Comissioners cc: SECY (2)
ASLB FOR:
Shoreham 50-322 (Brenner, Ferguson, Morris)
Perry 50-440/441 (Gleason, Bright, Kline)
Comanche Peak 50-445/446 (Bloch, Jordan, McCollom)
Midland 50-329/330(Bechboefer,Cowan, Harbour)
Harris 50-400/401 (Kelley, Bright, Carpenter)
Vogtle 50-425/426 (Margulies, Linenburger, Paris)
WNP 50-460 (Grossman, Bright Habour)
ASLAB FOR:
Shoreham 50-322 (Rosenthal, Edles, Wilber)
Catawba 50-413/414 (Rosenthal, Moore, Wilber)
Perry 50-440/441 (Rosenthal, Edles, Johnson)
PARTIES TO THE PROCEEDING
i 3 DISTRIBUTION LIST FOR BOARD NOTIFICATION Catawba Units 1&2, Docket Nos. 50-413/414 Comanche Peak Units 182, Docket Nos. 50-445/446 Midland Units 1&2, Docket Nos. 50-329/330 Perry Units 1&2, Docket Nos. 50-440/441 Shearon Harris Units 1&2, Docket Nos. 50-400/401 Shoreham Unit 1, Docket No. 50-322 Vogtle Units 1&2, Dockd Nos. 50-424/425 WNP 1, Docket No. 50-460 Atomic Safety and Licensing Wells Eddleman Mr. James L. Kelley Board Fanel Gary J. Edles, Esq.
Deppish Kirkland, III, Esq.
Atomic Safety and Licensing Mrs. Juanita Ellis Dr. Jerry R. Kline Appeal Panel Peter S. Everett, Esq.
Christine N. Kohl, Esq.
Docketing and Service Section Donald T. Ezzone, Esq.
Stephen B. Latham, Esq.
Document Management Branch Mr. Dan Feig Dr. Robert M. Lazo MHB Technical Associates Jonathan D. Feinberg, Esq.
Dr. J. Venn Leeds, Jr.
Palmetto Alliance Dr. George A. Ferguson Mr. Howard A. Levin Dr. Harry Foreman Mr. Nicholas D. Lewis Robert Abrams, Esq.
Dr. Richard F. Foster Mr. Gustave Linenberger, Jr.
Martin Bradley Ashare, Esq.
Laurie Fowler, Esq.
Dr. Linda W. Little Edward M. Barrett, Esq.
Leon Friedman, Esq.
Terry J. Lodge, Esq.
Charles Bechhoefer, Esq.
Eleanor L. Frucci, Esq.
Ms. Karen E. Long Ms. Nina Bell Mr. Steve J. Gadler, P.E.
Dr. Emmeth A. Luebke Ms. Lynne Bernabei Joseph Gallo, Esq.
Morton B. Margulies, Esq.
Bruce Berson, Esq.
Billie Pirner Garde Mr. Wendell H. Marshall Ernest L. Blake, Jr., Esq.
Ellen Ginsberg, Esq.
Mr. Robert D. Martin Howard L. Blau, Esq.
Stewart M. Glass, Esq.
Mr. Brian McCaffrey Peter B. Bloch, Esq.
James P. Gleason, Esq.
Dr. Kenneth A. McCollom Ms. Nora Bredes Mr. Marc W. Goldsmith J. Michael McGarry, III, Esq.
Lawrence Brenner, Esq.
Dr. Reginald L. Gotchy Janine Migden, Esq.
Mr. Glenn 0. Bright Norman L. Green, Esq.
Michael I. Miller, Esq.
Herbert H. Brown, Esq.
Herbert Grossman, Esq.
Marshall E. Miller, Esq.
James E. Brunner, Esq.
Mr. Robert P. Gruber Thomas S. Moore, Esq.
Mr. Ronald C. Callen Robert Guild, Esq.
Dr. Peter A. Morris John G. Cardinal, Esq.
Dr. Jerry Harbour Chris Nolin Dr. Jases H. Carpenter Mr. Bruce L. Harshe Fabian G. Palomino, Esq.
Gerald Charr:ff, Esq.
Samuel A. Haubold, Esq.
Dr. Oscar H. Paris Myron M. Chu.,. p.c.
Mr. Wayne Hearn Mr. Travis Payne, Esq.
John Clewett, Esq.
Ms. Susan Hiatt Spence Perry, Esq.
Hon. Peter Cohalan Renea Hicks, Esq.
William L. Porter, Esq.
Barton Z. Cowan, Esq.
Dr. Frank F. Hooper William C. Potter, Jr., Esq.
Dr. Frederick P. Cowan Elizabeth B. Johnson, Esq.
Dr. Paul W. Purdom T. J. Creswell, Esq.
Mr. Tim Johnson Mr. Paul Rau Gerald C. Crotty, Esq.
Dr. W. Reed Johnson Mr. Daniel F. Read Mr. James E. Cummins Mr. James E. Joiner Harold F. Reis. Esq.
James B. Dougherty, Esq.
Bradley W. Jones, Esq.
W. Taylor Reveley, III, Esq.
Donna D. Duer, Esq.
Richard E. Jones, Esq.
Nicholas S. Reynolds, Esq.
Jay Dunkleberger, Esq.
Dr. Walter H. Jordan Dr. Peter F. Riehm Alan R. Dynner, Esq.
Mr. James R. Kates Mr. Jesse L. Riley Anthony F. Earley, Jr.
Mr. Frank J. Kelley Mr. Steven Rochlis
V>
DISTRIBUTION LIST FOR BOARD NOTIFICATION Catawba Units 1&2, Docket Nos. 50-413/414 Comanche Peak Units 1&2, Docket Nos. 50-445/446 Midland Units 182, Docket Nos. 50-329/330 Perry Units 182, Docket Nos. 50-440/441 Shearon Harris Units 1&2, Docket Nos. 50-400/401 Shoreham Unit 1, Docket No. 50-322 Vogtle Units 1&2, Docket Nos. 50-424/425 WNP 1, Docket No. 50-460 Anthony Z. Roisman, Esq.
Alan S. Rosc:sthal, Esq.
Mr. Eugene Rosolie Mr. John Runkle Mr. Kevin M. Ryan Cherif Sedky, Esq.
Mr. Frederick J. Shon Ms. Jeanne Shorthouse Jay Silberg, Esq.
Ms. Mary Sinclair Mr. Lanny A. Sinkin Mr. Gerald C. Sorensen Mr. Michael D. Spence Ms. Barbara Stamiris Ms. Carol A. Stangler Mr. Martin Suubert Mr. Douglas C. Teper Mr. Ruble A. Thomas George F. Trowbridge, Esq.
Mr. Howard A. Wilber Mr. Donald R. Willard Mr. Frederick C. Williams Richard P. Wilson, Esq.
Richard D. Wilson, M.D.
Robert A. Wooldridge, Esq.
f TRANSAMERICA DELAVAL, INC.
EMERGENCY DIESEL GENERATOR DISTRIBUTION Plant Docket Utility Shoreham 50-322 Long Island Lighting Grand Gulf 1, 2 50-416, 417 Middle South Energy San Onofre 1 50-206 Southern California Edison Rancho Seco 50-312 SMUD River Bend 50-458, 459 Gulf States Utilities Shearon Harris 1, 2 50-400, 401 Carolina Power and Light Catawba 1, 2 50-413, 414 Duke Power Perry 1, 2 50-440, 441 Cleveland Electric Illuminating Bellefonte 1, 2 50-438, 439 TVA Comanche Peak 1, 2 t0-445, 446 Texas Utilities Services Vogtle 1, 2 50-424, 425 Georgia Power Midland 1, 2 50-329, 330 Consumers Power WNP-1 50-460 Washington Public Power
35 ENCLOSURE 2 UNn ED STATES NUCLEAR REGULATORY COMMISSION IN THE MATTER OF:
DOCKET NO:
NUCLEAR REGULATORY CO!'JIISSIO!J STAFF MEETIl1G WITH TDI Oh'NERS' GROUP LOCATION:
SETHESDA, 11ARYLAND PAGES:
1 - 119 DATE.
MONDAY, FEBRUARY ll, 1985 NAT:tv m cc.
.r:.