Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20149L4981988-02-12012 February 1988 Summary of 871207 Meeting W/Utils in Bethesda,Md Re Licensees Revised Proposal to Comply W/Nrc Requirement for Simulation Facilities Under 10CFR55.45(b).List of Attendees & Util Simulation Facility Group Guideline Encl ML20140H0711985-09-30030 September 1985 Summary of ACRS Ad Hoc Subcommittee on Midland 820429 Meeting W/Util & Consultants in Washington,Dc Re Foundation Problems & Remedial Action ML20127N3831985-05-16016 May 1985 Summary of 850321 & 0417 Meetings W/Util Re Surveillance & Maint Plan & QA Program Plan for Surveillance & Maint Phase During Const Shutdown Condition.List of Attendees & Viewgraphs Encl ML20095A3701984-07-18018 July 1984 Agenda for 800930 Meeting W/Util on Site for Appeal of NRC Position ML20093N8991984-07-18018 July 1984 Summary of 840417 Meeting W/Tera,Structural Mechanics Assoc (SMA) & Util in Chicago,Il to Discuss SMA Seismic Margins Evaluation & Potential Applicability to Disposition of Outstanding Civil/Structural Issues ML20094M5281984-03-20020 March 1984 Summary of NRC 840314 Meeting W/D Bridenbaugh of Mab Technical Assocs in Region III Re Info on Midland & Zimmer Plants.Util to Atty General of State of Mi Encl ML20138L4471984-02-15015 February 1984 Summary of 840120 Meeting W/B Garde in Bethesda,Md Re Garde Concerns Expressed to J Axelrad Re Enforcement Action Against Midland for Violation of Board-ordered CP Conditions ML20091F2051984-02-14014 February 1984 Summary of 831004-07 Audit & Meeting W/Util in Ann Arbor,Mi Re safety-related Portions of HVAC Sys ML20091F2091984-02-14014 February 1984 Summary of 831027 Meeting W/Util & Zack Co at Site Re Open Items from 831004-07 HVAC Design Audit.Related Info Encl, Including Status of Allegations as of 840228 ML20094P7421984-01-13013 January 1984 Handwritten Summary of 840104 Public Meeting W/Util,S&W Bechtel Re Monthly Activities,Crack Rept,Crack Mapping & Open Items.Supporting Documentation & Attendance List Encl ML20090H4951983-11-17017 November 1983 Trip Rept Re 831027 Site Visit Re Unresolved Items from 831028 HVAC Audit.No Unresolved Items Remain. Final Safety Evaluation Will Be Provided Under Separate Cover ML20024F0541983-08-19019 August 1983 Summary of 830816 Meeting W/Bechtel in Glen Ellyn,Il Re NRC Views on Bechtel Performance.Bechtel Employees Concerned That Region III Does Not Believe Bechtel Serious About Improving Performance ML20024D5221983-08-0101 August 1983 Summary of 830617 Telcon W/Util Re SER Open Items 4 & 11 & Confirmatory Issues 12 & 14.Requested Info Forthcoming.List of Participants Encl ML20024D5301983-08-0101 August 1983 Summary of 830614 Telcon W/Util & Eg&G Idaho Re Heavy Loads, Util 830217 & 0415 Submittals & Concerns Following Preliminary Reviews,Per 820524 Draft Technical Evaluation Rept Guidelines 3,4 & 7.List of Participants Encl ML20024A5621983-06-0909 June 1983 Summary of 830413 Meeting W/Util & Tera Corp in Bethesda,Md Re Independent Design & Const Verification Program.Items Discussed Included Protocol for Reporting & Communications & Tera Team Organization ML20028B8141982-11-29029 November 1982 Summary of 821109 Meeting W/Util in Bethesda,Md Re Preliminary Results of Seismic Margins Analysis for Svc Water Pump Structure & Borated Water Storage Tank ML20028B5231982-11-22022 November 1982 Summary of 821105 Meeting W/Util,S&W,Parsons,Brinckerhoff & Govt Accountability Project in Bethesda,Md Re Independent Assessment of Auxiliary Bldg Underpinning ML20132F0821982-09-20020 September 1982 Summary of 820915 Meeting W/Util in Chicago,Il Re Proposed Util Investigation Into Gap Allegations Concerning Facilities.Util Agreed to Delay Investigation Until NRC Completes Investigation.Related Info Encl ML20094P5081982-08-0909 August 1982 Summary of ACRS Subcommittee on Midland Units 1 & 2 820520 & 21 Meetings W/Util in Midland,Mi Re Review of OL Application ML20063G0881982-07-26026 July 1982 Summary of Mi Environ Review Board 820726 Meeting in Lansing,Mi Re EIS ML20058B4421982-07-19019 July 1982 Summary of 820625 Meeting W/Util & Bechtel in Bethesda,Md Re soils-related Requests for Info ML20125B5001982-07-15015 July 1982 Trip Rept of 820630-0701 Visit to Site Re Testing of Potentially Defective Containment Coatings ML20054J7921982-06-23023 June 1982 Summary of 820615 Meeting W/Util in Bethesda,Md Re Status of Schedule Development for Review of Soils Remedial Actions.Ltr of Clarification Re Fivp Proof Load Test Will Be Issued in Future ML20054J8101982-06-23023 June 1982 Summary of 820601 Meeting W/Util in Bethesda,Md Re Elements of Physical Security Plan.Comments Withheld Per 10CFR73.21. Response to Comments & Corresponding Revisions to Plan Will Be Forwarded by 820630 & 0715,respectively ML20054A6311982-04-0202 April 1982 Summary of 820316 Meeting W/Util Re Review & Hearing Schedules for Soils Remedial Work at Facility ML20054D2801982-03-16016 March 1982 Supplemental Summary of 820118-20 Meeting & Audit W/Util & Bechtel in Ann Arbor,Mi Re Plans & Preparations on Phase II Const for Underpinning of Auxiliary Bldg ML20052A7371982-03-16016 March 1982 Summary of 811103-05 Meetings W/Util in Jackson,Mi Re FSAR Chapter 13 ML20054C9921982-03-15015 March 1982 Summary of 820108 Meeting W/Util in Glen Ellyn,Il Re Operator Licensing.Handouts & Viewgraphs Encl ML20094K3491982-03-11011 March 1982 Summary of 840304 Meeting W/Util Re Schedules & Topics for Instant Hearing on Soils Matters.Hearing Schedule Resulting in Inefficient Reviews Due to Changing Const Priorities by Applicant ML20049J0381982-03-0202 March 1982 Summary of 810620-24 Audit of Seismic & Structural Design Calculations ML20041D1311982-02-0505 February 1982 Summary of 811001 Meeting W/Util & Bechtel Power Corp in Bethesda,Md Re Design & Const Aspects of Underpinning Planned Beneath Auxiliary Bldg ML20090B3801982-01-29029 January 1982 Summary of 820112 Meeting W/Util in Glen Ellyn,Il Re QA Organization Changes & Underpinning ML20093P1251982-01-22022 January 1982 Agenda for 820121-22 Meeting to Discuss Underground Piping Concerns.W/Handwritten Summary of 820107 Conference Call Re Underground Piping & 820120 Evaluation of Sand Settlement Due to Earthquake ML20040A7501981-12-31031 December 1981 Summary of 811104 Meeting W/Consultants & Util in Bethesda, MD Re Remedial Plans for Auxiliary Bldg & Feedwater Isolation Valve Pit Foundations.List of Attendees,Meeting Agenda & Schedule of Util Work Progress Encl ML20039C1131981-11-23023 November 1981 Summary of 810917 Meeting W/Util,Bechtel & Mueser,Rutledge, Johnson & Desmoine Re Preliminary Design of Mods Proposed to Foundation of Part of Svc Water Pump Structure Founded on Inadequate Fill.Attendee List,Agenda & Viewgraphs Encl ML20038A7491981-11-0909 November 1981 Summary of 810921 Meeting W/Util & B&W in Bethesda,Md Re Conformance of FSAR Fuel Design Section to Revision 2 Given in Srp.Also Discussed Approaches to Technical Issues Previously Outstanding on Other Plants.Viewgraphs Encl ML20093P1581981-10-0606 October 1981 Agenda for 811006 Meeting W/Bechtel,Util & Army Corps of Engineers to Discuss Underground Piping Reprofiling,Proposed Demonstration Solution & 1981 Measurement Results ML20010J4171981-09-29029 September 1981 Summary of 810505-07 Meeting W/Util,Bechtel & Consultants Re Remedial Activities Resulting from Inadequate Soils Compaction at Site.Attendee List & Viewgraphs Encl ML20094J4411981-09-18018 September 1981 Summary of 810917 Meeting W/Cpc,Us Army Corps of Engineers, Nrc,Bechtel & Mueser,Rutledge,Wentworth & Johnson in Bethesda,Md Re Preliminary Design of Proposed Remedial Measures for Svc Water Pumping Structure ML20010G4371981-09-11011 September 1981 Summary of 810805 Meeting W/Util,Bechtel,Graver Co & Us Army Corps of Engineers in Midland,Mi Re Surcharging of Valve Pits of Borated Water Storage Tank Foundations ML20079R1291981-08-24024 August 1981 Agenda for 810825 Meeting W/Nrc Caseload Forecast Panel to Conduct Plant Tour.Related Info Encl ML20093P0681981-08-19019 August 1981 Summary of 810721 Meeting W/Applicant in Bethesda,Md Re Summary of San Onofre Meeting on Confirmatory Analysis of Piping Sys Design.Confirmatory Analysis Encl ML20094J0391981-08-0505 August 1981 Handwritten Summary of 810805 Meeting in Ramada Central Inn Re Borated Water Storage tank.W/810728 Handwritten Memo Re Status of Review on Borated Water Storage Tank ML20010A0891981-07-30030 July 1981 Summary of 810630 Meeting W/Util in Bethesda,Md Re Seismological Input Issues.List of Attendees & Presentation Matls Encl ML20010A8891981-07-29029 July 1981 Summary of 810715 Telephone Conference W/Util,Bechtel & Us Army Corps of Engineers Re Borated Water Storage Tank Surcharge Program ML20090A7581980-10-17017 October 1980 Summary of 800617 Meeting W/Util in Bethesda,Md Re Fire Protection Evaluation Rept ML20079R1101980-07-25025 July 1980 Agenda for 800729 Caseload Forecast Panel Site Visit. Related Info Encl ML20094M7121980-07-0707 July 1980 Summary of 800523 Meeting W/Util,B&W,Bechtel & Teledyne in Bethesda,Md Re Preservice Failure of Three Reactor Vessel Holddown Studs.List of Attendees,Agenda & Viewgraph Slides Encl.Sketches for Underpinning Auxiliary Bldg Encl ML20093B4951980-03-10010 March 1980 Summary of 800227 & 28 Meeting & Site Visit W/Util in Midland,Mi Re Soil Settlement Problems & Related Investigation Program ML20079R1051979-09-14014 September 1979 Agenda for 790918-20 Caseload Forecast Panel Site Visit. Related Info Encl 1988-02-12
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20149L4981988-02-12012 February 1988 Summary of 871207 Meeting W/Utils in Bethesda,Md Re Licensees Revised Proposal to Comply W/Nrc Requirement for Simulation Facilities Under 10CFR55.45(b).List of Attendees & Util Simulation Facility Group Guideline Encl ML20140H0711985-09-30030 September 1985 Summary of ACRS Ad Hoc Subcommittee on Midland 820429 Meeting W/Util & Consultants in Washington,Dc Re Foundation Problems & Remedial Action ML20127N3831985-05-16016 May 1985 Summary of 850321 & 0417 Meetings W/Util Re Surveillance & Maint Plan & QA Program Plan for Surveillance & Maint Phase During Const Shutdown Condition.List of Attendees & Viewgraphs Encl ML20093N8991984-07-18018 July 1984 Summary of 840417 Meeting W/Tera,Structural Mechanics Assoc (SMA) & Util in Chicago,Il to Discuss SMA Seismic Margins Evaluation & Potential Applicability to Disposition of Outstanding Civil/Structural Issues ML20094M5281984-03-20020 March 1984 Summary of NRC 840314 Meeting W/D Bridenbaugh of Mab Technical Assocs in Region III Re Info on Midland & Zimmer Plants.Util to Atty General of State of Mi Encl ML20138L4471984-02-15015 February 1984 Summary of 840120 Meeting W/B Garde in Bethesda,Md Re Garde Concerns Expressed to J Axelrad Re Enforcement Action Against Midland for Violation of Board-ordered CP Conditions ML20091F2091984-02-14014 February 1984 Summary of 831027 Meeting W/Util & Zack Co at Site Re Open Items from 831004-07 HVAC Design Audit.Related Info Encl, Including Status of Allegations as of 840228 ML20091F2051984-02-14014 February 1984 Summary of 831004-07 Audit & Meeting W/Util in Ann Arbor,Mi Re safety-related Portions of HVAC Sys ML20024F0541983-08-19019 August 1983 Summary of 830816 Meeting W/Bechtel in Glen Ellyn,Il Re NRC Views on Bechtel Performance.Bechtel Employees Concerned That Region III Does Not Believe Bechtel Serious About Improving Performance ML20024D5221983-08-0101 August 1983 Summary of 830617 Telcon W/Util Re SER Open Items 4 & 11 & Confirmatory Issues 12 & 14.Requested Info Forthcoming.List of Participants Encl ML20024D5301983-08-0101 August 1983 Summary of 830614 Telcon W/Util & Eg&G Idaho Re Heavy Loads, Util 830217 & 0415 Submittals & Concerns Following Preliminary Reviews,Per 820524 Draft Technical Evaluation Rept Guidelines 3,4 & 7.List of Participants Encl ML20024A5621983-06-0909 June 1983 Summary of 830413 Meeting W/Util & Tera Corp in Bethesda,Md Re Independent Design & Const Verification Program.Items Discussed Included Protocol for Reporting & Communications & Tera Team Organization ML20028B8141982-11-29029 November 1982 Summary of 821109 Meeting W/Util in Bethesda,Md Re Preliminary Results of Seismic Margins Analysis for Svc Water Pump Structure & Borated Water Storage Tank ML20028B5231982-11-22022 November 1982 Summary of 821105 Meeting W/Util,S&W,Parsons,Brinckerhoff & Govt Accountability Project in Bethesda,Md Re Independent Assessment of Auxiliary Bldg Underpinning ML20132F0821982-09-20020 September 1982 Summary of 820915 Meeting W/Util in Chicago,Il Re Proposed Util Investigation Into Gap Allegations Concerning Facilities.Util Agreed to Delay Investigation Until NRC Completes Investigation.Related Info Encl ML20094P5081982-08-0909 August 1982 Summary of ACRS Subcommittee on Midland Units 1 & 2 820520 & 21 Meetings W/Util in Midland,Mi Re Review of OL Application ML20058B4421982-07-19019 July 1982 Summary of 820625 Meeting W/Util & Bechtel in Bethesda,Md Re soils-related Requests for Info ML20054J7921982-06-23023 June 1982 Summary of 820615 Meeting W/Util in Bethesda,Md Re Status of Schedule Development for Review of Soils Remedial Actions.Ltr of Clarification Re Fivp Proof Load Test Will Be Issued in Future ML20054J8101982-06-23023 June 1982 Summary of 820601 Meeting W/Util in Bethesda,Md Re Elements of Physical Security Plan.Comments Withheld Per 10CFR73.21. Response to Comments & Corresponding Revisions to Plan Will Be Forwarded by 820630 & 0715,respectively ML20054A6311982-04-0202 April 1982 Summary of 820316 Meeting W/Util Re Review & Hearing Schedules for Soils Remedial Work at Facility ML20052A7371982-03-16016 March 1982 Summary of 811103-05 Meetings W/Util in Jackson,Mi Re FSAR Chapter 13 ML20054D2801982-03-16016 March 1982 Supplemental Summary of 820118-20 Meeting & Audit W/Util & Bechtel in Ann Arbor,Mi Re Plans & Preparations on Phase II Const for Underpinning of Auxiliary Bldg ML20054C9921982-03-15015 March 1982 Summary of 820108 Meeting W/Util in Glen Ellyn,Il Re Operator Licensing.Handouts & Viewgraphs Encl ML20094K3491982-03-11011 March 1982 Summary of 840304 Meeting W/Util Re Schedules & Topics for Instant Hearing on Soils Matters.Hearing Schedule Resulting in Inefficient Reviews Due to Changing Const Priorities by Applicant ML20049J0381982-03-0202 March 1982 Summary of 810620-24 Audit of Seismic & Structural Design Calculations ML20041D1311982-02-0505 February 1982 Summary of 811001 Meeting W/Util & Bechtel Power Corp in Bethesda,Md Re Design & Const Aspects of Underpinning Planned Beneath Auxiliary Bldg ML20090B3801982-01-29029 January 1982 Summary of 820112 Meeting W/Util in Glen Ellyn,Il Re QA Organization Changes & Underpinning ML20040A7501981-12-31031 December 1981 Summary of 811104 Meeting W/Consultants & Util in Bethesda, MD Re Remedial Plans for Auxiliary Bldg & Feedwater Isolation Valve Pit Foundations.List of Attendees,Meeting Agenda & Schedule of Util Work Progress Encl ML20039C1131981-11-23023 November 1981 Summary of 810917 Meeting W/Util,Bechtel & Mueser,Rutledge, Johnson & Desmoine Re Preliminary Design of Mods Proposed to Foundation of Part of Svc Water Pump Structure Founded on Inadequate Fill.Attendee List,Agenda & Viewgraphs Encl ML20038A7491981-11-0909 November 1981 Summary of 810921 Meeting W/Util & B&W in Bethesda,Md Re Conformance of FSAR Fuel Design Section to Revision 2 Given in Srp.Also Discussed Approaches to Technical Issues Previously Outstanding on Other Plants.Viewgraphs Encl ML20010J4171981-09-29029 September 1981 Summary of 810505-07 Meeting W/Util,Bechtel & Consultants Re Remedial Activities Resulting from Inadequate Soils Compaction at Site.Attendee List & Viewgraphs Encl ML20010G4371981-09-11011 September 1981 Summary of 810805 Meeting W/Util,Bechtel,Graver Co & Us Army Corps of Engineers in Midland,Mi Re Surcharging of Valve Pits of Borated Water Storage Tank Foundations ML20093P0681981-08-19019 August 1981 Summary of 810721 Meeting W/Applicant in Bethesda,Md Re Summary of San Onofre Meeting on Confirmatory Analysis of Piping Sys Design.Confirmatory Analysis Encl ML20094J0391981-08-0505 August 1981 Handwritten Summary of 810805 Meeting in Ramada Central Inn Re Borated Water Storage tank.W/810728 Handwritten Memo Re Status of Review on Borated Water Storage Tank ML20010A0891981-07-30030 July 1981 Summary of 810630 Meeting W/Util in Bethesda,Md Re Seismological Input Issues.List of Attendees & Presentation Matls Encl ML20010A8891981-07-29029 July 1981 Summary of 810715 Telephone Conference W/Util,Bechtel & Us Army Corps of Engineers Re Borated Water Storage Tank Surcharge Program ML20090A7581980-10-17017 October 1980 Summary of 800617 Meeting W/Util in Bethesda,Md Re Fire Protection Evaluation Rept ML20094M7121980-07-0707 July 1980 Summary of 800523 Meeting W/Util,B&W,Bechtel & Teledyne in Bethesda,Md Re Preservice Failure of Three Reactor Vessel Holddown Studs.List of Attendees,Agenda & Viewgraph Slides Encl.Sketches for Underpinning Auxiliary Bldg Encl ML20093B4951980-03-10010 March 1980 Summary of 800227 & 28 Meeting & Site Visit W/Util in Midland,Mi Re Soil Settlement Problems & Related Investigation Program ML20090A4471979-08-27027 August 1979 Summary of 790821-22 Meeting W/Bechtel Power Corp,& San Francisco Power Div Re Generic Application of QA Topical Rept BQ-TOP-1 & Proposed Exceptions to Reg Guide 1.123 as Applied to ASME Code Shops ML20091L1191979-08-24024 August 1979 Summary of 790816 Site Meeting Re Status of Staff Review of Soils Settlement Issue ML20090A1101979-03-20020 March 1979 Summary of 790306 Site Visit to Observe Status of Soil Preloading Program Being Performed to Consolidate Fill in Vicinity of & Underneath Diesel Generator Bldg ML20090A1031979-02-27027 February 1979 Summary of 790117 Meeting W/Util,Bechtel Associates & B&W in Bethesda,Md to Discuss PSAR Changes & Reg Guides on QA ML20094K2281978-12-0707 December 1978 Handwritten Summary of 781204 Site Meeting Re Excessive Settlement of Diesel Generator Bldg & Foundations & Other Category I Structures ML20148P1361978-11-14014 November 1978 Summary of 781106 Meeting W/Cpc in Bethesda,Md Re Extension of Const Completion Dates.Draft Response to 781027 Questions Encl ML20090A6001978-02-16016 February 1978 Summary of 780213 Meeting W/Util in Bethesda,Md Re Util QA Program Topical Rept Changes ML20090A5941977-05-0505 May 1977 Summary of 770428 Meeting W/Util in Bethesda,Md Re Operator Training & Qualifications.Equipment & Circuit Separation Criteria Review Encl ML20090A6231977-03-28028 March 1977 Summary of 770323-25 Midland,Mi Site Tour & Interviews W/Midland City & County Officials Re Evaluation of Post & Prospective Community Impacts Associated W/Facility Const ML19212A3451976-09-29029 September 1976 Integrated Notes of Meetings on 760929,1012,1101,08 & 15 ML20140G9511976-05-24024 May 1976 Summary of 760521 Meeting W/Util in Bethesda,Md Re Proposed High Energy Line Break Analysis.Agenda Encl 1988-02-12
[Table view] |
Text
q,.4..gumpcse,. qk'"?.Wi=*/ +'*.Se-. s. w w w.m m,-** g. y - g~
py y%
C, O^
- gg4,
,., ry
. w: ~~" -
-b..
,y:
. 2.1... /~~.M ' G ' * %[b N EM*E.%... ' r; T&*17
' ~ ~
5-5.77
^
-r Docket Nos. 50-329
/
50-330
.+
FACILITY:
Midland Plant Units 1 & 2
..... '.... ~...-
,c APPLICANT:
Consumers Powe.r'. Company
. ~'
..a o
g.
SUBJECT:
SUMMARY
OF MEETING WITH CONSUMERS POWER COMPANY REGARDINGl f.
OPERATOR TRAINING AND QUALIFICATIONS
~r buMary s.
m-u..
.. ~.
staff inet wiirel resentatives of the'.f %g,e '
On April 28,1977,. the NRC i.
Consumers Power Company in Bethesda, Maryland to discuss the operator
., ' $,w. Q.i;<
training and qualification for the Midland Plant. :.,.
~
M...
g
.n.
A list of attendees is enclosed.
...x c "r
.m
_,.?
s Discussion
.s.-
+ y.
-.r
~
ga At the present ti: c[the Consumers Poiter Company is cornitted to the, training and qualification. set forth in Section.12.0 of the PSAR.
'This'comitment requires that operators.for a precritical operating 7 1@
~ -
license on the Midland Plart will have a Senior. Operator,'s license i;;. '
W. c-on the Big' P.ock Point Huclear Plant or the Palisades Plant. ~ The x
licensee intends to. submit. to the URC a request for relief from this '
comitment and.a. proposed. alternative for review and. acceptance by,w.,1.1.3f.
the NRC.
.i ' ~ ^
+....
-n
.: m 1
.c
.o
..,.w.' y.a m q 3 n 1
The staff indicated at~tne meeting'that!' ANSI N-18.10 " Selection and.*N:. M Traininglof Nuclear Power Plant Personnel," is expected to be issued J%'
in 1977; the-but they may control room manning requirements are presently _unchangedf,. f..
charge.due to securit;y or fire protection requirementa; ;
and the licensee should be.~ assured any candidates for: operator.
^ 3 r
license can meet the medical requirements. set forth in Regulatory Guide 1.XX
" Medical Certification and Monitoring of Personnel-
. J,, -
T Requiring;0perator Licenses fo,r Nuclear Power Plants."J.-..
Mv?
c a.
,c.
-w:
4
. w 7, _ ? - ! v. gf rW ',,r.;y-l '.
,e' Acti d,,.
e.
, - ~
-i m-
~
.,:. n...
Licensee'will submit an alt',rnative,.to'the present BSAR Section 12.0 '
e comitment for the NRC review and approval;- -
m..
..n
~. $...
.. ;, L a
3 Y.l.
? Y
~:-, Y
.=.
. N.f...:]......e &
~'
29q.w a--
c.
r nav %.11. pent.c+ m ana,.
sivu o(g rrua Manag mint Wate Rea
. Bunch p '.i.h
". LWR-4 3 LD @.. 6 2/.
gM Divi G....w RPowel1:nlg. JAh..;j p e
3
. ~-". +
. ~ ". <
m
,w o
w.
1.
Y.
Dg 5[4/775
$/D/7M$.LM Nd 2DAMI N #D[
Y
=w m.m. maim.;W.MW..%
L @.&%
.J.w%:y;; e r
+.
. X #
1.
I
- ,* ;t f$gy 5-;&.;&.' C%::-- Q..,,, ;.,.9;Q-[.jl*y+.5Q;- &-Eq,y(3~;gy,
. y.c w. wie.. ~.w..<
._.,.. c.
- ~,== a a..y.,..,.
~
c g.::,. ; x MIDLAND PLANT UNITS 1 AND 2 EQUIPMENT AND CIRCUIT SEPARATION CRITERIA REVIEW TAC-3239 1.
Scope of Review Amendment No. 32 to the Midland Plant Units 1 and 2 PSAR, Appendix e
8A, documents the applicant's criteria for separation and administra-tive procedures for Class IE Balance of Plant Equipment and Circuits.
Therefore, our review of that appendix and the enclosed results, have been confined to criteria and procedures concerning equipment and circuit separation.
Accordingly the results of this review should not be construed as being applicable to any other portion of the PSAR unless noted herein.
II. Additional Information or Clarification Required 1.
In Section 2.5 penetration area separation for grnups A, C and N and B, D and N are discussed, however there is no mention of separation for group E.
If it is possible for group E to feed circuits entering either of the two penetration areas, describe the criteria requirements and implementation that insures a single failure will not prevent the safety or safety-related systems from performing their functions.
Provide this I
I information.
2.
In Section 2.6.2, " Internal Separation" (regarding the separation of Class IE equipment and circuits internal to control boards),
l t -
g
."..?;;,y Q M M N:'.k N: m:..h;+)%b,T-d~
i;;y:{.l;.,..Q_: QE
- , c..a c...
- m ".'{ M:'C$:G :.. ';M ;. a,..y,, -,3r er ':."Y'T l* ** ' *'
L.t d.E ' '
..... ~,.
~
w
. two separation methods are described; six inch separation or use of barriers.
It is noted that the use of analysis to I
demonstrate the adequacy of any lesser separation is not mentioned as is the case with Class IE to non-IE and Class IE associated circuits to Non-IE.
Verify that it is your intent to utilize the criteria of Section 2.6 only, or modify your criteria accordingly.
3.
On Figure 8A-1, verify that the ammeter transducer shown ir a Class IE device and is within the Class IE boundary.
III.
Conclusions Pending satisfactory resolution of the items under II above, the staff concludes that the information provided in Appendix 8A represents acceptable criteria at the Construction ' Permit stage, for ensuring separation of the Balance of Plant Class IE equipment and circuits as required by General Design Criterion 3, 17 and 21.