ML20235V303

From kanterella
Jump to navigation Jump to search
Forwards Summary of OL Review Costs in 6-month Intervals for Period 840624-860621.Costs for Full Costs Records Through ASLB 861217 Dismissal of OL Proceeding for Plants Will Continue to Be Computed
ML20235V303
Person / Time
Site: Midland
Issue date: 07/17/1987
From: Holloway C
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8707230123
Download: ML20235V303 (10)


Text

-

I JUL 171987 Docket Nos. 50 329/330 MEMORANDUM FOR:

Files FROM:

C. James Holloway, Jr., Chief License Fee Management Branch, ARM /DAF

SUBJECT:

MIDLAND 1 AND 2 ODERATING LICENSE REVIEW COSTS FOR PERIOD JUNE 24, 1984 THROUGH JUNE 21, 1986 In accordance with Section 170.12(b), we have reviewed the costs in-curred by the various program offices directly involved in processing l

the Midland 1 and 2 eperating licenses (0Ls) from the period June 24, 1984 through June 21, 1986. Attached are summaries of the review costs in six-month periods as well as the supporting documentation from the program offices. The attachments show a total of $231,488 for Midland 1 and a total of $78,208 for Midland 2 were expended during this time period. When the costs of $201,488 for Midland 1 are added to the costs of $3,749,786 from the previous billing period, the cumulative costs through June 21, 1986, are $3,9E1,274. When the costs of $78,208 for

)

Midland 2 are added to the costs of $3,150,457 from the previous billing period, the cumulative costs through June 21, 1986 are $3,228,665. The maximum that can be assessed for the OL review for each plant under 10 CFR 170 as revised June 20, 1984, is $3,077,400. The Consumers Power Company was billed the maximum for each plant on February 1,1985.

By letter dated June 7,1985, the Consumers Power Company challenged certain review costs.

Even though final agency action has not been taken on these challenges, we have decided to continue to compute the OL review costs since Consumers Power Company has been billed the maximum chargeable under the current 10 CFR 170. Any necessary adjustments needed as a result of the pre.TAPSS data review will be made when the final results of the review are available. We will continue to compute costs for the " full cost" records through December 17, 1986, the date the Atomic Safety and Licensing Board dismissed the operating license proceeding for Midland 1 and 2.

Signed by:

C. hmes Holloway, Jr.

l C. James Holloway, Jr., Chief License Fee Management Branch 8707230123 870717 Division of Accounting and Finance PDR ADOCK 05000329 Office of Administration and A

PDR Resources Management

Enclosures:

Operating License ReviewCosts(8) 0FFICE : ARM /LFMB

A /F g.:._c/LFMB
ARM

._______.:. _ f ____.:

CJHgh. _ _.. :. _ _ _.. _ _... : _ _ _ _ _ _ _..... : _ _

SURNAME :LT mper:jp :R ig way :

DATE :7/ U5/87

7/ h /87
7/', /87

DISTRIBUTION:

PDR LPDR FReglFilis "LFMB"ReactorFile(2)

I LFf'B A/M File (2)

DWeiss RMDiggs CJHolloway DFioravante, PMSB RVillafranco, PMAS LFMB R/F ARM /DAF R/F DW/LT/ Files-Midland i

1 1

1 l

I l

1

)

,s l

l l

Consumers Power Company Operating License Review Costs From 6/24/84 Through 12/22/84 FACILITY:

Midland 1 DOCKET NO.:

50-329 Costs Per Professional Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended Costs Costs Costs

$84,796

$84,796 1.

NRR

$62 2.

IE-HQ 53 99.0

$5,247 5,247 3.

REGIONS 53 345.0 18,338 68,775 87,113-l 4.

ACRS 62

.5 31 31 5.

NMSS 58 i

l I

TOTAL COST:

$177,187 1

l

\\

l I

1 l

A '

la i

s t

Consumers Power Company Operating License Review Costs From 12/23/84 Through 6/22/85' FACILITY:

Midland 1 DOCKET NO.:

50-329 i

Costs Per Professional Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended Costs Costs Costs

$ 429

$ '429 1.

NRR

$62 I

2.

IE-HQ 53 50

$2,650 2,650 1

3.

REGIONS 53 34.5 1,829 1,829 4.

ACRS 62 5.

NMSS 58 TOTAL COST:

$4,908 4

1

Consumers Power Company Operating License Review Costs From 6/23/85 Through.12/21/85 FACILITY:

Midland 1 DOCKET NO.:

50-329 Costs Per Professional Program Office Professional Staff-Hours Staff-Hour

. Contractual Total Review Staff-Hour Expended Costs Costs Costs >

$18,703

$18,703 1.

NRR

$62 106 2.

IE-HQ

.53 2

$106 3.

REGIONS 53 4.

ACRS*

62 5.

NMSS 58

-TOTAL COST:

$18,809

)

i Consumers Power Company Operating License Review Costs From 12/22/85 Through 6/21/86 FACILITY:

Midland 1-DOCKET NO.: 50-329 l

Costs Per Professional Program Office Professional-Staff-Hours Staff-Hour Contractual Total Re' view Staff-Hour Expended Costs Costs Costs

$186 1.

NRR

$62 3

$186 2.

IE-HQ 53 3.

REGIONS 53 150 150 248 4.

ACRS 62 4

248 i

5.

NMSS 58

]

TOTAL COST:

$584 i

)

Consumers Power Company Operating License Review Costs From 6/24/84 Through 12/22/84 I

FACILITY:

Midland 2 DOCKET NO.:

50-330 Costs Per Professional Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended Costs Costs Costs 1.

NRR

$62 193.0

$11,966-

$3,247

$15,213 1

4,505 2.

IE-HQ 53 85.0 4,505 3.

REGIONS 53 355.4 18,836 24,283 43,119 4.

ACRS 62 5.

NMSS 58 j

I TOTAL COST:

$62,837 i

l 1

4 Consumers Power Company Operating License Review Costs From 12/23/84 Through 6/22/85 FACILITY:

Midland 2-DOCKET NO.: 50-330 l

Costs Per Professional i

Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended Costs Costs Costs

$1,901

$1,901 1.

NRR

$62 1,643 2.

IE-HQ 53 31

$1,643 l

1,829 3.

REGIONS 53 34.5 1,829 3

4.

ACRS 62 5.

NMSS 58 TOTAL COST:

$5,373 l

l j

i i

l I

a I

Consumers Power Company Operating License Review Costs From 6/23/85 Through 12/21/85 FACILITY:

Midland 2 DOCKET NO.: 50-330 i

Costs Per Professional i

Program Office Professional Staff-Hours Staff-Hour Contractual

. Total Review Staff-Hour Expended Costs Costs Costs

.I l

1.

NRR

$62 4

$248

$8,900

$9,148 i

106 2.

IE-HQ 53 2

106 1

3.

REGIONS 53 4.

ACRS*

62 5.

NMSS 58 I

\\

l l

TOTAL COST:

$9,254

  • None reported 1

l l

l l

t Consumers Power Company Operating License Review Costs From 12/22/85 Through 6/21/86 FACILITY:

Midland 2 DOCKET NO.: 50-330 Costs Per Professional Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended Costs Costs Costs

$744 1.

NRR

$62 12

$744 2.

IE-HQ 53 3.

REGIONS 53 i

4.

ACRS 62 5.

NMSS 58 i

TOTAL COST:

$744 l