Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011
ML23158A092
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/15/2023
From: Vincent Gaddy
NRC/RGN-IV/DORS/EB1
To: Diya F
Ameren Missouri
References
IR 2023011
Download: ML23158A092 (1)


Text

June 15, 2023

SUBJECT:

CALLAWAY PLANT - COMPREHENSIVE ENGINEERING TEAM INSPECTION (CETI) INSPECTION REPORT 05000483/2023011

Dear Fadi Diya:

On May 25, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Callaway Plant and discussed the results of this inspection with Brent Jungmann, Senior Director, Nuclear Engineering, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Signed by Gaddy, Vincent on 06/15/23 Vincent G. Gaddy, Chief Engineering Branch 1 Division of Operating Reactor Safety Docket No. 05000483 License No. NPF-30

Enclosure:

As stated

Inspection Report

Docket Number: 05000483 License Number: NPF-30 Report Number: 05000483/2023011 Enterprise Identifier: I-2023-011-0006 Licensee: Ameren Missouri Facility: Callaway Plant Location: Steedman, MO Inspection Dates: May 08, 2023 to May 25, 2023 Inspectors: J. Braisted, Senior Reactor Inspector D. Bryen, Reactor Inspector W. Cullum, Senior Reactor Inspector C. Franklin, Reactor Inspector N. Okonkwo, Reactor Inspector D. Reinert, Senior Reactor Inspector F. Thomas, Reactor Inspector C. Young, Senior Reactor Analyst Approved By: Vincent G. Gaddy, Chief Engineering Branch 1 Division of Operating Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a comprehensive engineering team inspection (CETI) inspection at Callaway Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.21M - Comprehensive Engineering Team Inspection The inspectors evaluated the following components and listed applicable attributes, permanent modifications, 10 CFR 50.59 evaluations/screens, and operating experience samples:

Structures, Systems, and Components (SSCs) (IP section 03.01) ===

(1) CGD02A, Cooling Tower Electrical Room Supply Fan A Compliance with the updated final safety analysis report (UFSAR), technical specifications (TS), and TS bases Component modifications and associated evaluations Design calculations including fan motor minimum voltage, control logic, and heat transfer capacity/heat balance Visual inspection of fan, dampers, and instruments during walkdown Vendor and design requirements Applicable operating experience relevant to sample
(2) EFHV0066, Essential Service Water Cooling Tower Train B Bypass Valve Design basis documents System level procedures Visual inspection of component during walkdown System calculations Logic for valve operation Corrective action program documents Preventative maintenance tasks and procedures
(3) NB0113, Feeder Breaker to NG01 Control Building Load Center Compliance with the UFSAR, TS, and TS bases Design calculations including voltage analysis and short circuit calculations Visual inspection of equipment and surrounding area Electrical drawings Component maintenance history and corrective action program documents Procedures for circuit breaker inspection, maintenance, and testing
(4) NG01B, A Train 480 VAC Auxiliary Building Motor Control Center Compliance with the UFSAR, TS, and TS bases Design calculations including voltage analysis and short circuit calculations Visual inspection of equipment and surrounding area Vendor and design requirements Thermography procedure and results
(5) NK01, 125 VDC Distribution Panel Class IE Group 1 Compliance with UFSAR, TS, and TS bases and plant procedures Visual inspection of charger and associated system during walkdown Environmental conditions of equipment Surveillance procedure, testing, operations and maintenance records Protection setting and coordination study Design basis document Vendor manual for conformance with manufacturer instructions for installation and maintenance Preventive maintenance and periodic verification testing and post-test analyses Schematic and wiring drawings System health report Corrective action program documents
(6) NK21, 125 VDC Vital Battery Charger 1 Compliance with UFSAR, TS, and TS bases and plant procedures Visual inspection of charger and associated system during walkdown Environmental conditions of equipment Design basis document Preventive maintenance and periodic verification testing and post-test analyses Surveillance procedure, testing, operations and maintenance records Vendor manual for conformance with manufacturer instructions for installation and maintenance Schematic and wiring drawings reviews Corrective action program documents Thermography inspection results of equipment internals System health report Protective settings and coordination study Load test data study of batteries
(7) PEF01A, Essential Service Water Pump A Design basis documents System level procedures Visual inspection of component during walkdown System calculations Water hammer analysis Thermal-hydraulic ultimate heat sink analysis Preventative maintenance tasks and procedures
(8) SGL10A, Residual Heat Removal Room Cooler A Heat exchanger testing procedures and performance history to assure consistency with vendor and industry recommendations Room cooler maintenance history to verify the monitoring of potential degradation Design calculations including required heat capacity, maximum tube plugging limits, and limiting flows and temperature inputs Corrective action program documents
(9) TEG01A, Component Cooling Water Surge Tank A Compliance with the UFSAR, TS, and TS bases Calibration procedures and acceptance criteria calculations for level instrumentation Component modifications and associated evaluations Design calculations including minimum usable safety related inventory and tank level setpoints Visual inspection of tank, valves, and instruments during walkdown Review of vendor and design requirements Evaluation of applicable operating experience relevant to sample
(10) XNG01, Transformer Load Center NG01 Load Center Thermography procedure and results Voltage analysis and short circuit calculations Visual inspection during equipment walkdown Review of vendor manual and plant design drawings

Modifications (IP section 03.02) (5 Samples)

(1) MP 18-0045, Approve Changes to NK Battery Connection System Required for RF23
(2) MP 19-0002, Thermocouple Core Cooling Monitor Replacement
(3) MP 19-0012, Setpoint Re-Adjustment (Lower Level) For Control Building Sump
(4) MP 19-0018, Ultimate Heat Sink Cooling Tower Return to Ultimate Heat Sink Pond
(5) RFR 170223, Gas Void in Containment Spray Pump Suction from Emergency

Recirculation Sump 10 CFR 50.59 Evaluations/Screening (IP section 03.03) (20 Samples)

(1) CA2511-00892, MP 13-0001, Replace Essential Service Water Supply Fans CGD01A&B
(2) CA2511-00936, MP 13-0037, Polar Crane Bridge and Trolley Motor Controls Upgrade
(3) CA2511-01196, MP 19-0002, Thermocouple Core Cooling Monitor Replacement
(4) CA2511-01221, MP 19-0085, Cooling Tower Basin Level Indication Phase 2
(5) CA2511-01266, MP 19-0124, Replace KJV0820A/B, Diesel Generator Auxiliary Lube Oil Pump Pressure Relief Valves
(6) CA2511-01267, MP 20-0006, UHS Cooling Tower Fan Motor Circuits Relay Replacement
(7) CA2511-01271, MP 20-0015, XMB01 Exciter Transformer Replacement
(8) CA2511-01272, MP-19-0018, Ultimate Heat Sink Cooling Tower Return to Ultimate Heat Sink Pond
(9) CA2511-01318, MP 21-0009, Improve the Ground Fault Relaying on the C Phase of MA01
(10) CA2511-01344, MP 21-0001, Eliminate the Main Feedwater Regulating Valve Single Point Vulnerability and Improve Reliability
(11) CA2511-01363, MP 21-0020, Replace Batteries PK11 and PK12
(12) CA2511/TABLE 8-8B, Maximum Allowable Number of Fuel Assemblies Offloaded to the Spent Fuel Pool vs. Time after Shutdown Refuel Outage 26 and Spent Fuel Pool Water Temperature Limit for Fuel Handling Operations
(13) CA2512-00032, MP 19-0088, Atmospheric Steam Dump Valves Environmental Qualification
(14) CA2512-00034, Reduction in Containment Passive Heat Sinks
(15) CA2512-00036, MP 20-0012, Obsolete Transmitter - Vendor Cannot Quote Replacement Without Addition Information
(16) MP 19-0012, Setpoint Re-Adjustment (Lower Level) For Control Building Sump
(17) MP 19-0088, Atmospheric Steam Dump Valves Environmental Qualification
(18) MP 19-0116, Evaluate and Approve Electromagnetic Interference Improvements for New EGS Connectors/Connections
(19) MP 21-0021, RFR 210061, Reconfigure Select Intermediate Range Instruments
(20) MP 22-0018, Replacement of Protective Relay PA0210211F

Operating Experience Samples (IP section 03.04) (3 Samples)

(1) CR 201906202, Part 21 Fisher Information Notice 2019-01, Mechanical Setting of Disk/Stem Taper Pins for Fisher Type 7600, 7700, 7800, 9100, 9200, and 9500 Series Butterfly Valves
(2) CR 202101555, Adverse to Quality Condition Found From Cook Unit 2 Operating Experience Review
(3) CR 202104699, Wolf Creek DBAI Minor Violation of 10CFR50.65(a)(4) For Inadequate Model of the Startup Time of the NSAFWP Risk Value in PRA

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On May 25, 2023, the inspectors presented the comprehensive engineering team inspection (CETI) inspection results to Brent Jungmann, Senior Director, Nuclear Engineering, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.21M Calculations CN-CRA-19-5 Callaway Steam Tunnel GOTHIC Modeling Upgrade 0

E-B-13 Voltage Analysis 0

EDP-ZZ-01113 Infrared Thermography Program Guide 12

EF-45 Acceptance Criteria Used in Essential Service Water Flow 8

Balance Procedures

GD-342 Cooling Tower Electrical Room Ventilation 0

GK-05 Short Circuit Calculation 0

GL-137 SGL10A/B Room Cooler Heat Removal Capabilities 0

J-UEF03 Instrument Loop Uncertainty Estimate: UHS Cooling Tower 2

Fan Speed and Bypass Valve Control

M-EF-52 Heat Exchanger Performance Based on Reduced ESW 1

Temperature and Flow

M-EG-05 ADD 2 NPSH Available to the CCW Pumps with the Surge Tank 0

Empty

M-GK-370 Post-Accident Battery Room H2 Concentration Levels 001

NAI-2114-001 Evaluation of Gas Accumulation in Callaway Containment 0

Spray Suction Piping

NAI-2163-001 Callaway Energy Center UHS Thermal Performance 0

Analysis Using GOTHIC

NB-05 System NB Protective Relay Setpoints 004

NK-05 Class 1E Battery Capacity 010

NK-06 Class 1E DC Power System Fault Tree Model 000

NK-06 ADD 1 Class IE DC Power System Fault Tree Model 10/20/1998

NK-10 NK System DC Voltage Drop 002

NK-10 Attachments C, D, E, F, G, and K for NK-10 Calculation 002

ZZ-214 MOV Voltage Drop Calculation 10

ZZ-534 Quarter-turn MOV Capability and Margin Calculation 1

ZZ-62 Plant Load Flow Calculation 10

Corrective Action Condition Report 201904041, 201701094, 201901943, 201905148,

Documents 201906023, 202203343, 202203419, 201601612,

2002721, 202003059, 202003062, 202004888,

2100215, 202100247, 202101093, 202101766,

Inspection Type Designation Description or Title Revision or

Procedure Date

2200624, 202201540, 202001783, 202100910,

2101555, 202102021, 202102548, 202201363,

2300457, 200701515, 202007410, 201803185,

200408670, 200002868, 200409206, 202000763,

2201665, 200800976, 200901546, 201000245,

201004897, 201706920, 201803958, 201904646,

2005745, 202203112, 202204558, 202204863,

201901616, 201803185, 201802828, 201300761,

200801763, 202303127, 202302551, 202300381,

201806334, 201806919, 201905572, 201906202,

201905708, 202101276, 202103720, 201108964,

200803462, 201203653, 201305408, 202203151

Corrective Action Condition Report 202303237, 202303240, 202303241, 202303254,

Documents 202303269, 202303325, 202303400, 202303497,

Resulting from 202303510, 202303592, 202303596, 202303615,

Inspection 202303621, 202303622, 202303623, 202303634,

2303643, 202303645, 202303676

Drawings 10466-M-619.2- 1UEWOC Fan Curves 04/07/1978

23-01

E-009-00023 Metal-Clad Switchgear - Power & Control Circuits Electrical 11

Diagram - NB0113

E-050-00006 Batteries NK11 & NK14 60 Cell NCN-23S Layout ON-2-S07- 014

074530-816 Racks

E-050-00009 Batteries NK12 & NK13 - 60 Cell NCN-13S Layout ON-2- 013

S07-07 520-816 Racks

E-050-00032 Batteries - NCN & NCX Typical Termination Assemblies 003

E-051-00058 3PH SRC Controller Battery Charger Schematics 012

E-051-00079 Battery Chargers Wiring Diagram 009

E-051-00090 3 Phase Thyristor Control Class 1E 130V Battery Charger 011

NK21, NK22, NK23, NK24, NK25

E-21005(Q) List of Loads Supplied by Emergency Diesel Generator. 038

E-21NB01(Q) Lower Medium Voltage System Class 1E 4.16KV Single Line 11

Meter and Relay Diagram

E-21NG01 Single Line Diagram 28

Inspection Type Designation Description or Title Revision or

Procedure Date

E-21NK01(Q) Class IE 125V DC System Meter & Relay Diagram 018

E-23NK10 125 Volt DC Class 1E Power System Schematic 029

E-23NN01 Class 1E Instrument AC Schematic 014

E-U3EF05A(Q) Schematic Diagram Cooling Tower Inlet Bypass Valve 2

E-U3GD02 Schematic Diagram ESW Elect. Room Supply Fan 9

M-105A-00002 Component Cooling Water Surge Tank 6

M-105A-003-02 Support Leg Cross Bracing Detail 01/04/1978

M-105A-009-02 Support Leg Detail 03/24/1977

M-1184-00015 Crosby Pressure Relief Valves 0

M-22EG01 P&ID Component Cooling Water System 11

M-22KJ03 P&ID Standby Diesel Generator "A" Lube Oil System 20

M-22KJ06 P&ID Standby Diesel Generator "B" Lube Oil System 20

M-619.2-00144 Fan Assembly drawing Buffalo Forge Co. Fan 330 BL ARR 6

9l Class 1

M-U2GD01 P&ID ESW Pumphouse & UHS Elec. Rm. HVAC 12

M-UG082 UHS Cooling Tower Arrangement 8

Engineering EC-46 Fuel Cycle 26 Decay Heat Load Calculation 0

Changes MP 13-0037 Polar Crane Bridge and Trolley Motor Controls Upgrade 002

MP 19-0002 Thermocouple Core Cooling Monitor Replacement 1

MP 19-0018 UHS Cooling Tower Return to UHS Pond 2

MP 19-0085 Cooling Tower Basin Level Indication Phase 2 2

MP 19-0088 Atmospheric Steam Dump Valves Environmental 003

Qualification

MP 19-0116 Electromagnetic Interference Improvements for New EGS 001

Connectors/Connections

MP 19-0124 Replace KJV0820A/B, DG Aux Lube Oil Pump Pressure 0

Relief Valves

MP 21-0001 Eliminate the Main Feedwater Regulating Valve Single Point 003

Vulnerability and Improve Reliability

Miscellaneous 19508715.500 Clean and Inspect Battery Charger NK21 000

19511729 NK21 Thermography Inspection Control Building. EL. 2016 000

2508001.500 Thermography Inspection - Control Building EL. 2016 000

ARC-1599 Independent Review of Crosby Engineering Calculation EC- 06/04/2020

Inspection Type Designation Description or Title Revision or

Procedure Date

24, R0

CA2507 Curve Book Evaluation Table 8-8B 20

CA2510 Screening for MP 08-0010 000

CA2510-01463 Improve the Ground Fault Relaying on the C Phase of MA01 000

50.59 review CA2510-01463 - MP 21-0009

CA2510eB Screening for MP 18-0045 R001 001

CA2511-01318 50.59 Screen for MP 21-0009 000

CA2511-eB 50.59 Screening for MP 18-0045 Approve changes to NK 000

battery connection system required for RF23

CA2512-00034 Reduction in Containment Passive Heat Sinks 0

E-009-00319 Instruction Manual for SEL-251D Distribution Relay 000

E-050-00016 IM Batteries and Battery Packs Gould Inc, System: NK 017

Manual

E-27000A Termination List Notes 033

GEH-262IC General Electric Installation and Maintenance Instructions 06/01/1973

for AV-Line Switchboards

GEK-7320F General Electric Instructions for Types AM-4.16-350-2C & 02/01/1980

AM-4.16-350-2H Magne Blast Circuit Breaker

GNB Industrial March 14, 2012-03-14 letter from Paul Mattaliano of GNB 03/14/2012

Power Letter industrial Power to Nicole Weber of Ameren Missouri -

Callaway Energy Center on NCN Hydrogen Generation

Rates

HI 2004101 Health Risk and Solution Option Ranking -Thermocouple 0

Core Cooling Monitor (TCCM) Obsolescence Issues (OBS)

J-2049-00000 Thermocouple Core Cooling Monitor Operations and 0

Maintenance Manual

J-601B-00074 IM Atmosphere Relief Valve - Masoneilan International 055

LDCN 19-0011 FSAR Markup/ LDCR CR# 201901616 0

FSAR SP SEC 9.3.3.5 for MP 19-0012,

M-2024-00001 IM Nitrogen Isolation - Velan Engineering Company 000

M-612-00062 IM Air Handling Units (Room Coolers) Carrier Corporation 23

M-619.2-00136 Instruction Manual for Safety Related Fans 10

M-924 Specification For Safety Related Fans CGD01A & B / 0

CGM01A & B

Inspection Type Designation Description or Title Revision or

Procedure Date

M-U0GD System Description Essential Service Water Pump House 5

Ventilation System and UHS Cooling Tower Electrical Room

Ventilation System

MP 08-0010 50.59 Screening for Setpoint adjustment for Control Building 001

CA2511 Sump

MP 18-0045 Approve changes to NK battery connection system required 003

for RF23

MP 19-0012 Setpoint re-adjustment (lower level) for Control Building 001

Sump

MP 21-0009 Improve the Ground Fault Relaying on the C Phase of MA01 002

MP 21-0020 RFR 200020 - Replace Batteries PK11 & PK12 001

N/A SEL-351A, -1 Relay Distribution Protection System 09/08/2019

Instruction Manual

NG-22 NK21CB1 Feeder Breaker Application Sheet 001

OTA-RK-00024 Miscellaneous Sumps Level High 005

Addendum 94F

RFR AK Correction Factors on Room Coolers B

RFR 004371B Interstep Cable Connector Part Numbers B

RFR 007519 Eval. NK Battery Interstep Cable material Equiv. A

RFR 017225A Material Equiv. for a different Subtier on a GNB lug A

RFR 020132A Update E-050 I/M'S Due NK Battery Replacement A

RFR 170208 Approve Part Number Change for GNB Batteries (NCN and 000

NCX Series)

RFR 170223 Gas Void in CTMT Spray Pump Suction from Emergency 0

Recirculation Sump

RFR 170223 Gas Void in CTMT Spray Pump Suction from Emergency 0

Recirculation Sump

RFR 180078 Approve changes to NK battery connection system required 000

for RF23 and the battery swap out being done during refuel

RFR 200135 Retire Installed Hydrogen Analyzers in the NK, PK and 000

Comm. Corridor Battery Rooms

RFR 20115 Evaluate NK Battery Interstep Cable Material Equiv 000

RFR 210110 External Indication of Ventilation Status For Communications 000

Corridor Battery Room No. 1

Inspection Type Designation Description or Title Revision or

Procedure Date

RFR 210112 Evaluate If NK Battery Room Hydrogen Monitors Are 000

Required

RFR 210113 Evaluate if Communications Corridor Radio Room/Battery 000

Room Hydrogen Monitor Can Be Retired

ULDBD-EG-001 Component Cooling Water 1

ULDBD-GD-001 Essential Service Water Pumphouse and Ultimate Heat Sink 1

Ventilation Systems

ULDBD-GL-001 Auxiliary Building Ventilation System 3

ULDBD-NB-001 Lower Medium Voltage (Class 1E 4.16KV) 1

ULDBD-NG-001 Low Voltage (480V) - Class 1E 2

Procedures APA-ZZ-00143 10 CFR 50.59 AND 10 CFR 72.48 Reviews 022

APA-ZZ-00320 Work Execution 082

APA-ZZ-00330 Preventive Maintenance Program Administrative Correction 059

APA-ZZ-00395 Significant Operator Response Timing 033

APA-ZZ-00396 Gas Intrusion Program 4

APA-ZZ-00500 Corrective Action Program 075

APA-ZZ-00604 Requests For Resolution 042

E-017-00397 IM Load Center Unit Substations General Electric Company, 028

System: NG

E-050-00038 Seismic Qualification Report of Cable Clamps 000

E-051-00090 3 Phase Thyristor Control Class 1E 130V Battery Charger 011

NK21, NK22, NK23, NK24, NK25

E-051B-00002 Instruction Manual for Installation and Operation pf Class 1E 000

Electrically Operated Manually controlled Transfer Switches,

NK71- Thru NK78

E-1 Loss of Reactor or Secondary Coolant 023

E-1052-00017 IM FOR LGSB13 AND LGSB2 Circuit Breakers, Nuclear 003

Logistics Inc. System: PG

E-2 Faulted Steam Generator Isolation 012

E-21013 Installation, Inspection, and Testing Details For Electrical 057

Equipment and Cable

E-25000A Cable and Raceway Notes, Details, and Tables 055

E-3 Steam Generator Tube Rupture 025

Inspection Type Designation Description or Title Revision or

Procedure Date

ECA-0.0 Loss of All AC Power 032

EDP-ZZ-00396 Gas Intrusion Program Implementation 1

EDP-ZZ-01112 Heat Exchanger Predictive Performance Manual 27

EDP-ZZ-01113 Infrared Thermography Program Guide 012

EDP-ZZ-01133 Air Operated Valve Program Guide 026

ISF-EG-000L1 CCW Surge TK 'A' Level Channel OP Test 26

ISP-NF-0001A LSELS Train A ESW and CCW Pump Start Inhibit Test 5

ITL-EG-00R09 CCW HX 'A' Inlet Process Rad Monitor Loop Cal 19

ITL-GD-00T51 LOOP-TMP; UHS Cooling Tower Elec. Rm Sply Fan 19

(CGD02A) Temp

ITM-ZZ-VT001 Diagnostic Calibration and Testing of Modulating Air 025

Operated Valves

MP 08-0010 Setpoint adjustment for Control Building Sump 001

MPE-NK-QB004 NK CLASS 1E Battery Charger Inspection 013

MPE-ZZ-QS003 Cleaning and Inspection of 120 VAC Distribution Panels, 014

25 VDC and 250 VDC Switchboards and Miscellaneous

Electrical Panels

MPE-ZZ-QS005 General Electric 4.16KV Breaker PM 034

MPE-ZZ-QS006 GE Magne Blast Breaker Overhaul 015

MPE-ZZ-QS008 G.E. 480 VOLT Load Center PM 029

MPM-ZZ-QH001 Inspection and Maintenance of Tornado Dampers 5

MPM-ZZ-QV009 Fisher Controls Nuclear Carbon Steel Butterfly Valves - 10

Disassembly Inspection and Reassembly

MPM-ZZ-QW002 Safety-Related Fan Belt Replacement/Tensioning 6

MPM-ZZ-QW002 Safety-Related Fan Belt Replacement/Tensioning 5

MSE-NK-QB002 Quarterly Surveillance on NK Quarterly Surveillance on NK 016

Large Station Batteries

MSE-NK-QB011 Inspection and Surveillance of NK11 Battery and Battery 027

Chargers NK21/NK25

MTE-ZZ-QB002 Battery Charger Maintenance, Field Adjustments, and 020

Troubleshooting

MTE-ZZ-QN005 Electrical Scheme Checkout 011

MTM-ZZ-QA002 Limitorque SMB-00 MOV Inspection and Overhaul 020

Inspection Type Designation Description or Title Revision or

Procedure Date

MTT-ZZ-00001 HVAC System Air Balancing 8

OSP-EJ-P001A RHR Train A Inservice Test - Group A 69

OSP-EN-00002 Containment Spray System Venting 5

OTA-NK-00001, Switchboard Bus Under Voltage 0

Addendum 3A

OTN-EG-00001 Component Cooling Water System 62

OTN-EG-00001 Transferring Water Between Surge Tanks 4

ADDENDUM 1

OTN-LF-00001 Control Building Floor/Equipment Sump level High 004

Addendum 9

OTO-EG-00001 CCW System Malfunction 18

ULNRC-05504 Three-Month Response to NRC Generic Letter 2008- 04/10/2008

01,"Managing Gas Accumulation In Emergency Core

Cooling, Decay Heat Removal, and Containment Spray

Systems" (TAC NO. MD7806)

ULNRC-05551 Three-Month Response to NRC Generic Letter 2008- 10/13/2008

01,"Managing Gas Accumulation In Emergency Core

Cooling, Decay Heat Removal, and Containment Spray

Systems" (TAC NO. MD7806)

ULNRC-05590 Three-Month Response to NRC Generic Letter 2008- 02/04/2009

01,"Managing Gas Accumulation In Emergency Core

Cooling, Decay Heat Removal, and Containment Spray

Systems" (TAC NO. MD7806)

ULNRC-06164 Supplemental Response to NRC Generic Letter 2008- 12/15/2014

01,"Managing Gas Accumulation In Emergency Core

Cooling, Decay Heat Removal, and Containment Spray

Systems" (TAC NO. MD7806)

71111.21M Work Orders Job 07510763.250, 10507443.250, 10507443.550,

11512464.500, 17004271.550, 20511173, 21502427,

2509934, 22500698, 20000796, 20002095, 13505629.500,

19508715.500, 19509000.500, 18000362.900,

18000363.900, 18000364.505, 18000365.520,

19003551.940, 21001642, 20511648, 14504618, 20509118,

21500183.500, 22001102.350, 22502362, 18512211.500

15