MONTHYEARIR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) IR 05000334/20240102024-05-15015 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000334/2024010 and 05000412/2024010 IR 05000334/20230062024-02-28028 February 2024 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2023006 and 05000412/2023006) IR 05000334/20230052023-08-31031 August 2023 Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) ML23090A0192023-03-31031 March 2023 Information Request for the Cyber Security Baseline Inspection; Notification to Perform Inspection 05000334/2023401 and 05000412/2023401 IR 05000334/20220062023-03-0101 March 2023 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2022006 and 05000412/2022006) IR 05000334/20220052022-08-31031 August 2022 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2022005 and 05000412/2022005) IR 05000334/20210062022-03-0202 March 2022 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2021006 and 05000412/2021006) IR 05000334/20210052021-09-0101 September 2021 Updated Inspection Plan for the Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2021005 and 05000412/2021005) ML21124A1322021-05-0404 May 2021 Notification of Conduct of a Fire Protection Team Inspection IR 05000334/20200062021-03-0303 March 2021 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2020006 and 05000412/2020006) IR 05000334/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000334/2020005 and 05000412/2020005) IR 05000334/20190062020-03-0303 March 2020 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2019006 and 05000412/2019006) IR 05000334/20190052019-08-28028 August 2019 Updated Inspection Plan Inspection Report 05000334/2019005 and 05000412/2019005 IR 05000334/20180062019-03-0404 March 2019 Annual Assessment Letter for Beaver Valley Power Station, Unit Nos. 1 and 2 (Reports 05000334/2018006 and 05000412/2018006) IR 05000334/20180052018-08-28028 August 2018 Updated Inspection Plan Inspection Report 05000334/2018005 and 05000412/2018005 IR 05000334/20170062018-02-28028 February 2018 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2(Reports 05000334/2017006 and 0500412/2017006; 05000334/2017402 and 05000412/2017402 and 05000334-2017501 and 05000412/2017501) ML17271A0662017-09-28028 September 2017 Information Request for the Cyber Security Baseline Inspection Notification to Perform Inspection 05000334/2018403 and 05000412/2018403 IR 05000334/20160062017-03-0101 March 2017 Annual Assessment Letter for Beaver Valley Power Station, Unit Nos. 1 and 2 (Report 05000334/2016006 and 05000412/2016006) with Report 22 IR 05000334/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2016005 and 05000412/2016005) IR 05000334/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Beaver Valley Power Station, Units 1 & 2 (Report 05000334/2015006 and 05000412/2015006) IR 05000334/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Beaver Valley Power Station (Report 05000334/2015005 and 05000412/2015005) IR 05000334/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2, (Report 05000334/2014001 and 05000412/2014001) IR 05000334/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000334/2014006 and 05000412/2014006 IR 05000334/20130012014-03-0404 March 2014 ROP-14 2013 Beaver Valley Power Station Units 1 and 2, Annual Assessment Letter, Report 05000334/2013001 and 05000412/2013001, and Inspection Plan IR 05000334/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan Report 05000334/2013006 and 05000412/2013006 IR 05000334/20120012013-03-0404 March 2013 Annual Assessment Letter for Beaver Valley Units 1 and 2 (Report 05000334/2012001 and 05000412/2012001) IR 05000334/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Beaver Valley Power Station (Report 05000334/2012006 and 05000412/2012006) IR 05000334/20110012012-03-0505 March 2012 Annual Assessment Letter for Beaver Valley Power Station Units 1 and 2 (Report 05000334-11-001 and 05000412-11-001) ML1124206842011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Beaver Valley Units 1 and 2 IR 05000334/20100012011-03-0404 March 2011 Annual Assessment Letter for Beaver Valley Units 1 and 2, EOC 11 (Report 05000334/2010001 and 05000412/2010001) ML1024406392010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Beaver Valley Units 1 and 2 IR 05000334/20010012010-03-0303 March 2010 Annual Performance Review and Inspection Plan - Beaver Valley Power Station (Beaver Valley) Units 1 and 2 (05000334-01-001 and 05000412-01-001) ML0924401272009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Beaver Valley Units 1 and 2 IR 05000334/20090012009-03-0404 March 2009 Annual Assessment Letter - Beaver Valley Power Station Units 1 and 2 (05000334/2009001 and 05000412/2009001) ML0824704722008-09-0202 September 2008 2008 Mid-Cycle Performance Review and Inspection Plan - Beaver Valley IR 05000334/20080012008-03-0303 March 2008 (05000334-08-001, 05000412-08-001), Annual Assessment Letter ML0734706972007-12-13013 December 2007 ROP 8 - Beaver Valley - Change to Inspection Plan, 12/13/07 ML0724309412007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan ML0706104772007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Beaver Valley Station ML0624305972006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Beaver Valley Power Station Units 1 and 2 ML0606201582006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Beaver Valley Power Station Units 1 and 2 (Reports 05-334-2006001 and 05-412-2006001) ML0524207222005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Beaver Valley ML0406301322004-03-0202 March 2004 2003-04 Annual Assessment Letter - Beaver Valley ML0323906412003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for Beaver Valley Power Station ML0306205872003-03-0303 March 2003 2003 Annual Assessment Letter - Beaver Valley Power Station, Units 1 & 2 IR 05000334/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - Beaver Valley Power Station Units 1 & 2 (Report 50-334/02-01, 50-412/02-01) 2024-08-29
[Table view] Category:Letter
MONTHYEARIR 05000334/20240112024-10-17017 October 2024 License Renewal Phase IV Inspection Report 05000334/2024011 L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report L-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A1912024-09-16016 September 2024 Operator Licensing Examination Approval IR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 IR 05000334/20244022024-08-22022 August 2024 Security Baseline Inspection Report 05000334/2024402 and 05000412/2024402 (Cover Letter Only) L-24-199, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-08-22022 August 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000334/20240022024-08-0505 August 2024 Integrated Inspection Report 05000334/2024002 and 05000412/2024002 ML24208A0462024-07-26026 July 2024 NRC Office of Investigations Case No. 1-2023-005 L-24-182, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-23023 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-161, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-19019 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 05000334/LER-2024-004, Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control2024-07-17017 July 2024 Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control ML24193A2912024-07-16016 July 2024 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule L-24-014, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models2024-07-16016 July 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models IR 05000334/20245012024-07-0808 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000334/2024501 and 05000412/2024501 05000334/LER-2024-003, Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping2024-07-0202 July 2024 Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping L-24-164, BV-2, Post Accident Monitor Report2024-06-27027 June 2024 BV-2, Post Accident Monitor Report IR 05000334/20244012024-06-26026 June 2024 Material Control and Accounting Program Inspection Report 05000334/2024401 and 05000412/2024401 (Cover Letter Only) L-24-094, Reactor Vessel Surveillance Capsule Withdrawal Schedule2024-06-24024 June 2024 Reactor Vessel Surveillance Capsule Withdrawal Schedule L-24-152, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-06-17017 June 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations 05000334/LER-2024-002, Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation2024-06-11011 June 2024 Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation 05000334/LER-2024-001, Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification2024-06-0606 June 2024 Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification ML24135A1702024-05-29029 May 2024 – Steam Generator Tube Inspection - Review of the Spring 2023 Tube Inspection Reports ML24135A2282024-05-29029 May 2024 Review of the Spring 2023 Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F Star Reports L-24-021, Cycle 30 Core Operating Limits Report2024-05-23023 May 2024 Cycle 30 Core Operating Limits Report L-24-121, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-05-23023 May 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24141A1052024-05-20020 May 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000334/20240102024-05-15015 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000334/2024010 and 05000412/2024010 L-24-107, CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair2024-05-13013 May 2024 CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair IR 05000334/20240012024-05-0808 May 2024 Integrated Inspection Report 05000334/2024001 and 05000412/2024001 L-23-269, Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2024-05-0707 May 2024 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions L-24-054, Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological)2024-04-29029 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological) L-24-089, Emergency Preparedness Plan2024-04-23023 April 2024 Emergency Preparedness Plan L-24-088, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 20242024-04-22022 April 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 2024 ML24101A2752024-04-10010 April 2024 Response to Request for Additional Information Regarding Spring 2023 180-Day Steam Generator Tube Inspection Report L-24-082, Withdrawal of Exemption Request2024-04-0303 April 2024 Withdrawal of Exemption Request L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-064, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152024-03-13013 March 2024 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24044A0662024-03-0404 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0083 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations IR 05000334/20230062024-02-28028 February 2024 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2023006 and 05000412/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee 05000412/LER-2023-003-01, Missile Barrier Door Left Open Resulting in a Loss of Safety Function2024-02-20020 February 2024 Missile Barrier Door Left Open Resulting in a Loss of Safety Function IR 05000334/20230042024-02-12012 February 2024 Integrated Inspection Report 05000334/2023004 and 05000412/2023004 ML24025A0922024-01-25025 January 2024 Requalification Program Inspection 2024-09-17
[Table view] |
Text
March 3, 2020
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNITS 1 AND 2 (REPORTS 05000334/2019006 AND 05000412/2019006)
Dear Mr. Penfield:
The NRC has completed its end-of-cycle performance assessment of Beaver Valley Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2019, through December 31, 2019. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at Beaver Valley Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter (IMC) 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Beaver Valley Power Station, Units 1 and 2.
The enclosed inspection plan lists the inspections scheduled through December 31, 2021. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections) and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule.
Additionally, in a letter (ADAMS Accession No. ML18115A007) dated April 25, 2018, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.82(a)(1)(i), the NRC was notified of the intent to permanently cease power operations at Beaver Valley Power Station, Units 1 and 2. Unit 1 will shut down by May 31, 2021, and Unit 2 will shut down by October 31, 2021. Therefore, the inspection schedule is tentative and may be revised. Once you formally notify the NRC in accordance with 10 CFR 50.82(a)(1)(ii) that either Unit 1 or Unit 2 is permanently shutdown and that all the nuclear fuel has been removed from the reactor vessel, then that unit will transition from NRC IMC 0305, Operating Reactor Assessment Program, and IMC 2515, Light-Water Reactor Inspection Program - Operations Phase, to IMC 2561, Decommissioning Power Reactor Inspection Program. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In addition to normal baseline inspections, the NRC will be performing Inspection Procedure (IP)
60854.1, Preoperational Testing of Independent Spent Fuel Storage Installations (ISFSI) at Operating Plants, and IP 60855.1, Operation of an ISFSI at Operating Plants, at your facility.
Lastly, the NRC will schedule an additional inspection per a revised version of Temporary Instruction (TI) 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01), for any sites who elect to implement the guidance of the Industry Initiative on Open Phase Condition, Revision 3 (ADAMS Accession No. ML19163A176).
Licensees will be individually notified when the NRC schedules these inspections.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Please contact me at 610-337-5356 with any questions you have regarding this letter.
Sincerely, X /RA/
Signed by: Patrick W. Finney Patrick W. Finney, Acting Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos. 50-334 and 50-412 License Nos. DPR-66 and NPR-73 Enclosure:
Beaver Valley Inspection Plan cc w/ encl: Distribution via LISTSERV
ML20059L509 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME LCline PFinney DATE 2/28/20 3/3/20
IP 22 Inspection Activity Plan Report Beaver Valley 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count TI-194 Open Phase Condition Inspection - BV 2 1, 2 01/27/2020 01/31/2020 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)
Rad Safety Inspection 1 1, 2 01/27/2020 01/31/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 01/27/2020 01/31/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 01/27/2020 01/31/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 01/27/2020 01/31/2020 IP 71124.04 000728 Occupational Dose Assessment ISI - UNIT 2 1 2 04/20/2020 05/01/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
Rad Safety Refuel 1 1, 2 04/20/2020 04/24/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/20/2020 04/24/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 04/20/2020 04/24/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/20/2020 04/24/2020 IP 71124.04 000728 Occupational Dose Assessment EP EXERCISE INSPECTION - BEAVER VALLEY 5 1, 2 06/08/2020 06/12/2020 IP 71114.01 000716 Exercise Evaluation 1, 2 06/08/2020 06/12/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 06/08/2020 06/12/2020 IP 71151 001397 Performance Indicator Verification BV1 Requal Inspection with P/F Results 2 1 06/21/2020 06/27/2020 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1 06/21/2020 06/27/2020 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Rad Safety Instruments 1 1, 2 08/17/2020 08/21/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation Access Control, Equip Perf, Training-BV 3 1, 2 08/31/2020 09/04/2020 IP 71130.02 000734 Access Control 1, 2 08/31/2020 09/04/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 08/31/2020 09/04/2020 IP 71130.07 000739 Security Training This report does not include INPO and OUTAGE activities. Page 1 of 4 This report shows only on-site and announced inspection procedures.
2/26/2020 1:47:32 PM Enclosure
IP 22 Inspection Activity Plan Report Beaver Valley 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count Access Control, Equip Perf, Training-BV 3 1, 2 08/31/2020 09/04/2020 IP 71130.09 001656 Security Plan Changes 1, 2 08/31/2020 09/04/2020 IP 71151 001338 Performance Indicator Verification Design Basis Assurance Inspection - Teams - Beaver Valley Unit 1 and 2 6 1, 2 09/14/2020 09/18/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
1, 2 09/28/2020 10/02/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
Radwaste 1 1, 2 09/14/2020 09/18/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation ISFSI Dry Run & Operational Inspection - BV 2 1, 2 09/28/2020 10/02/2020 IP 60854.1 000589 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 1, 2 10/12/2020 10/16/2020 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants Rad Safety RETS 1 1, 2 10/19/2020 10/23/2020 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 10/19/2020 10/23/2020 IP 71151 000746 Performance Indicator Verification Rad Safety Inspection 1 1, 2 01/11/2021 01/15/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 01/11/2021 01/15/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 01/11/2021 01/15/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 01/11/2021 01/15/2021 IP 71124.04 000728 Occupational Dose Assessment FY21 Beaver Valley 1 Initial Examination 4 1 01/31/2021 02/06/2021 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1 02/28/2021 03/13/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
PI&R BIENNIAL - BV 4 1, 2 02/08/2021 02/12/2021 IP 71152B 000747 Problem Identification and Resolution 1, 2 02/22/2021 02/26/2021 IP 71152B 000747 Problem Identification and Resolution Rad Safety Inspection 1 1, 2 04/19/2021 04/23/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities. Page 2 of 4 This report shows only on-site and announced inspection procedures.
2/26/2020 1:47:32 PM
IP 22 Inspection Activity Plan Report Beaver Valley 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count Rad Safety Inspection 1 1, 2 04/19/2021 04/23/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 04/19/2021 04/23/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/19/2021 04/23/2021 IP 71124.04 000728 Occupational Dose Assessment EP Program Inspection - Beaver Valley 1 1, 2 06/07/2021 06/11/2021 IP 71114.02 000717 Alert and Notification System Testing 1, 2 06/07/2021 06/11/2021 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 06/07/2021 06/11/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 06/07/2021 06/11/2021 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 06/07/2021 06/11/2021 IP 71151 001397 Performance Indicator Verification BV2 Requal Inspection with P/F Results 2 1 07/12/2021 07/16/2021 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1 07/12/2021 07/16/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Rad Safety Inspecton 1 1, 2 07/12/2021 07/16/2021 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 07/12/2021 07/16/2021 IP 71151 000746 Performance Indicator Verification MATERIAL CONTROL AND ACCOUNTABILITY 1 1, 2 07/18/2021 07/24/2021 IP 71130.11 000742 Material Control and Accounting (MC&A)
Access Control, Protective Strategy, TSR, SPR 4 1, 2 08/02/2021 08/06/2021 IP 71130.02 000734 Access Control 1, 2 08/02/2021 08/06/2021 IP 71130.05 000737 Protective Strategy Evaluation 1, 2 08/02/2021 08/06/2021 IP 71130.09 001656 Security Plan Changes 1, 2 08/02/2021 08/06/2021 IP 71130.14 000743 Review of Power Reactor Target Sets 1, 2 08/02/2021 08/06/2021 IP 71151 001338 Performance Indicator Verification Rad Safety Inspection 1 1, 2 09/13/2021 09/17/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 09/13/2021 09/17/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 09/13/2021 09/17/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/13/2021 09/17/2021 IP 71124.04 000728 Occupational Dose Assessment This report does not include INPO and OUTAGE activities. Page 3 of 4 This report shows only on-site and announced inspection procedures.
2/26/2020 1:47:32 PM
IP 22 Inspection Activity Plan Report Beaver Valley 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count Rad Safety Inspection 1 1, 2 10/25/2021 10/29/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/25/2021 10/29/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 10/25/2021 10/29/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/25/2021 10/29/2021 IP 71124.04 000728 Occupational Dose Assessment 1, 2 10/25/2021 10/29/2021 IP 71151 000746 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 4 of 4 This report shows only on-site and announced inspection procedures.