Forwards IE Inspec Rept 50-324/78-17 & 50-325/78-17 on 780718-21 & Notice of Violation
ML20062A252
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/21/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML19294A332 List:
References
NUDOCS 7810110295
Download: ML20062A252 (2)


See also: IR 05000324/1978017

Text

_.

. . .

,

4

UNITED STATES

,,

pm arcuq[o,

,

NUCLEAR REGULATORY COMMISSION

REGloN tl

[ ) .-"g.

- 9

( 3 g

z 101 M ARIETTA STR E ET, N.W.

o, . Ng [ ATLANTA, GEORGIA 30303

%w y

    • ...

In Reply Refer To: AUG 21 1378

RII:DGH

{' 50-325/78-17

50-324/78-17

l

Carolina Power and Light Company

ATTN: Mr. J. A. Jones

.

Executive Vice President

Engineering, Construction
and Operation

'

336 Fayetteville Street

Raleigh, North Carolina 27602

j Gentlemen:

This refers to the inspection conducted by Mr. D. G. 3inckley of this

office on July 18-21, 1978, of activities authorized by NRC Operating

License Nos. DPR-62 and DPR-71 for the Brunswick I and 2 facilities,

and to the discussion of our findings held with Mr. A. C. To11ison, Jr.,

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This

item and references to pertinent requirements are listed in the Notice

of Violation enclosed herewith as Appendix A. This notice is sent to

l you pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations. Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including: (1)

'

l corrective steps which have been taken by you and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

2

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you (or

'; your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

APCW

7 p isili p M . .

%g Abc<K $5V - 3M 9s

hDR R OC6 (5V - 3d T W

_

-

.

-

.

AUG 21 G7e

Carolina Power and Light -2-

Company

1

.

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is con-

tained in a separate part of the document. If we do not hear from you

in this regard within the specified period, the report will be placed

in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

c d

09,_ y

F. J. Long, Chief 0

Reactor Operations and Nuclear

'upport Branch

Enclosures:

1. Appendix A, Notice

of Violation

2. Inspection Report Nos.

50-325/78-17

50-324/78-17

cc w/ encl:

Mr. A. C. Tollison, Jr.

Plant Manager

Box 458

Southport, N. C. 28461

,

i

l

l