ML20067D965

From kanterella
Revision as of 14:07, 31 May 2023 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in Safety Insp Repts 50-454/89-17 & 50-455/89-19.Corrective Actions: Results of Sample Analyses Excluded from 1985-1988 Annual Environ Repts Encl
ML20067D965
Person / Time
Site: Byron  Constellation icon.png
Issue date: 11/17/1989
From: Kovach T
COMMONWEALTH EDISON CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20067D967 List:
References
NUDOCS 9102130368
Download: ML20067D965 (3)


Text

, , , , , , , , .

'y' Comm:nwealth Edison

_ 72 West Adams Street, Chicago, Ilknots .

  • A3di6sslipffi570sf0(fse~B5T76T Chicago, liknees 60690 0767 November 17, 1989 Mr. A. Bert Davis I Regional Administrator U.S. Nuclear Regulatory Commission Region III.

799 Roosevelt Road Glen Ellyn, IL 60137  ;

Subject:

-Byron Station Units I and 2 Response to Inspection Report

~

i; Nos. 50-454/89017 and 50-455/89019 HRC-Docl(et Nos;;5.0-454 and 50-455

Reference:

October 20, 1989, letter from H. D. Shafer to Cordell Reed _

X . -Dear Mr. Davls- I The referenced letter provided the results of a routine afety 'l 4

Inspection conducted by Messrs. H. J. Kropp, R. N. Sutphin R. B. Holthun and -

,Hs. D.-R. Calhoun from August 20_through September 30, 1989, of activities:at.'

-Byron Station.

H

. - The inspection-resulted In'the issuance of..one Level.IV violatt'on for. '

..the failure to meet the' requirements.of Technical Specification 6.9.1.6, regarding the submittal of all radiological envlornmental samples:in'the Annual Radiological Environmental Operating Report. Commonwealth Edston's '

response.to the violation 1s contained in Attachment A.

The sample analyses that were not: included in the'1985, 1986, 1987; and.1988 Byron Statton Annual Radiological r'vironmental Operating Reports are-contained ~ln Attachments B,.C. D,'and E of ' letter.

.Please direct any questions regard 1 rig-this letter a this-office.

Very truly yours,- -

i hT. J. Kovach GMu

/r Nuclear Lic nsing Manage'r p q cc: Byron Resident Inspector NRC Document Control Desk I ee m l

1. . . .o#F9p'kosgogs4

.. , 1 o p

~

  • ^

i i

AUACliMLtlLA NOTICE Of VI0t.ATION 454/89017-02 and 455/89019-02 Technical Specification 6.9.1.6 requires that the Annual Radiological Environmental-Operating Report include the results of the analyses of all radiological environrental samples taken during the period, at all the locations specified in the tables and figures specified in the Offsite Dose ]

Calculatlon. Manual (ODCH).  !

Contrary to the above, although the four Annual Radiological Environmental Operating reports covering the years 1985 to 1988 included summaries, the i results of the analyses of the radiological environmental samples taken during the respective periods were not included. ,

Responsel Commonwealth Edison acknowledges that-the 1985, 1986, 1987 ar.d 1988 Annual Environmental Reports did not contain the results of the m lyses of the radiological environmental samples takea during the respw tive periods.

Rather than including the individual data points in the report, a sumr.ary of the individual d&ta points was included and the individual data pointt weie {.

available for review, i Byron Station's environmental monitoring program continues to function within i =

the legal requirements and administrative guidelines to ensure the health and safety of the public.

Collitthe_Atti kni_lBAeA_and_Rei.u.Lli_AthlRYEdi The results of sample analyses, excluded from the 1985,1986,1987 and 1988 Byron Reports have been rallected and are contained in Attachments B, C, D and E re3pectfully.

Corr.e_tthe_AttlonttolychLfrther Vlola1Lonal .

A corporate procedure EP-ADMIH-7, " Review and Distribution of Contractors Radiological Monitoring Report", will be developed which will include a station specific checklist delineating.the technical specification '

requirements .for report content. The checklist will be reviewed and approved by Byron Station prior to generation of the Annual Report to ensure all 4 technical specification requirements are being met.

Date_oLEulLComU.ancel Co porate procedure EP-ADHIH-7 will be issued by December 31, 1989.

/;rJ:0385T:1 ki . . ... . .._ . . . . .

j

ATTACHMENT B ENVIRONMENTAL RADIOLOGICAL MONITORING PROGRAM BYROH tlVCLEAR P0HER STATION JANUARY - DECEMBER, 1985

[

k, i

- - - - - - - - - _ - _ _ . - _ - _ _ _ _ _ - - - _ _ _ - _ - - - _ _ _ . _ - - . _ _ - - - _ _ . _ _ _ _ _ - - _ _ - . - - - - - - - - - - .