ML20085D599

From kanterella
Revision as of 22:34, 25 September 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed OL Change Requests 189 & 53 to Licenses DPR-66 & NPF-73,respectively,revising Surveillance Requirement 4.6.1.5 Re Determination of Containment Average Air Temp
ML20085D599
Person / Time
Site: Beaver Valley
Issue date: 10/09/1991
From: Sieber J
DUQUESNE LIGHT CO.
To:
Shared Package
ML20085D592 List:
References
NUDOCS 9110170010
Download: ML20085D599 (1)


Text

__

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of ) UNIT NO. 1 UNIT NO. 2

) Docket No. 50-334 Docket No. 50-412 Duquesne Light Company ) License No. DPR-66 License No. NPF-73 Beaver Valley Power Station)

APPLICATION FOR AMENDMENT TO OPERATING LICENSE Pursuant 'to Section 50.90 of the regulations of the U. S. Nuclear Regulatory Commission, Duquesne Light Company hereby requests that the Technical Specifications set forth in Appendix A to those licenses be amended to revise Surveillance Requirement 4.6.1.5 which determines the containment average air temeprature.

The proposed technical specification changes are net forth in Attachments A to this Application. A Safety Analysis and no significant hazard evaluation are set forth in Attachment B. Typed replacement pages for the Technical Specifications are included in Attachment C. Based on the guidance provided by the Commission, the proposed changes have been determined to involve no significant hazards consideration in accordance with 10 CFR 50.92.

WHEREFORE, Applicant respectfully requests that Apperidix A to these operating licenses be amended in the form attached hereto as Attachment A.

Duquesne Light Company l

i By k'

s .

. D . Sieber ice President Nuclear Group l'

L Subscribed and sworn to before me

.on this - day of [b4 dud,. /  !

( W f/h h) d Y Q.&

9110170010 9tfoon ADOcR Oscoo{g, fDR PDR

--