L-97-045, Application for Amend to License NPF-73,consisting of Change Request 115,modifying TS 3.4.8 by Reducing RCS Specific Activity Limits IAW GL 95-05

From kanterella
Jump to navigation Jump to search
Application for Amend to License NPF-73,consisting of Change Request 115,modifying TS 3.4.8 by Reducing RCS Specific Activity Limits IAW GL 95-05
ML20212C873
Person / Time
Site: Beaver Valley
Issue date: 10/22/1997
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20212C877 List:
References
GL-95-05, GL-95-5, L-97-045, L-97-45, NUDOCS 9710300205
Download: ML20212C873 (2)


Text

+ - . _

4 tar Vatey Power Staten

.-r-E IP1eoWoM ru UU avi*n october 22, 1997 L-97-045 U. S. Nuclear Regulatory Commission Attention: Document Control Desk'

. Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Proposed Operating License ( .hange Request No.115 Pursuant to 10 CFR 50.90, Duquesne Light Company requests an amendment to the above license in the fonn of changes to the technical speci0 cations. The proposed chaage modifies Specification 3.4.8 by reducing the reactor coolant system speci0c activ?y limits in accordance with Generic Letter 95-05.

The proposed technical specification changes are presented in Auachment A. The safety analysis (including the no significant ha7.ards evaluation) is presented in Attachment B. The reactor coolant system specific activity analysis is presented in Attachment C. An information copy of proposed UFSAR changes is presented in Attachment D.

This change has been reviewed by the Onsite Safety Committee and Offsite Review Committee. The change was determined to be safe and does not involve a significant hazard consideration as defi'ied in 10 CFR 50.92 based on the attached safety analysis.

Approval of this amendment is requested for April 17, 1998. An implementation

- period of up to 60 days is requested following the effective date of this amendment.

Sincerely, guJoJ[ ,f Sushil C. Jain C,C l g c: Mr. D. M. Kem, Sr. Resident Inspector Mr. H. J. Miller, NRC Region I Administrator Mr. D. S. Brinkman, Sr, Project Manager DELIVERING

- Mr. W. P. Dornsife, Director BRP/DEP G 11 A 11 ~Ti Mr. M. P. Murphy (BRP!DEP)

L -[, O C- [ '] ^; IfkSf5!I 9710300205.971022 PDR ADOCK Of'000412 P PDR g

AFFIDAVIT FOR APPLICATION OF AMENDMENT COMMONWEALTH OF PENNSYLVANIA)

) SS:

COUNTY OF BEAVER )~

Subject:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Proposed Operating License Change Request No.115 Before me, the undersigned notary public, in and for the County and Commonwealth aforesaid, this day personally appeared Sushil C. Jain, to me known, who being duly sworn r.ccording to law, deposes and says that he is Division Vice c

President, Nuclear Services of the Nuclear Power Division, Duquesne Light Company, -

he is duly authorized to execute and file the foregoing submittal on behalf of said Company, and the statements set forth in the submittal are true and correct to the best of his knowledge, information and belief.

A . %A Sushil C. Jain Subscribed and swom to before me on thid2kay of hd!dbW, lWl (YOdu! b /1AJY '

/

'd r huhlin E ' NotartalSeal Tracey A. Baczek. pm-

  1. s s r.a h .?g %

m<mer. .w= u c n ., s L ,; _ _ i