L-99-043, LAR 136 for License NPF-73,revising LCO 3.7.1.3,by Increasing Min Required Volume in Primary Plant DW Storage Tank to 127,500 Gallons,By Adding New Footnote & by Revising Wording Contained in Action Statements

From kanterella
Jump to navigation Jump to search
LAR 136 for License NPF-73,revising LCO 3.7.1.3,by Increasing Min Required Volume in Primary Plant DW Storage Tank to 127,500 Gallons,By Adding New Footnote & by Revising Wording Contained in Action Statements
ML20204E378
Person / Time
Site: Beaver Valley
Issue date: 03/16/1999
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20204E382 List:
References
L-99-043, L-99-43, NUDOCS 9903250021
Download: ML20204E378 (2)


Text

-

Beav Valley Power Station Shippingport. PA 15077 0004 March 16, 1999 (412) 393-5512 en or Vi President '**#"'#'**

Nuclear Serv 6ces L-99-043 Nuclear Power Division U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 License Amendment Request No.136 Pursuant to 10 CFR 50.90, Duquesne Light Company requests an amendment to the above license in the form of changes to the technical specifications. The proposed amendment will revise Limiting Condition For Operation (LCO) 3.7.1.3 titled " Primary Plant Demineralized l Water (PPDW)" Specifically, the minimum required volume in the PPDW storage tank will be increased to 127,500 gallons. The term " contained" in LCO 3.7.1.3 will be replaced with the term " usable" A new footnote (1) will be added to LCO 3.7.1.3 pertaining to the volume required in the PPDW storage tank. The action statements will be revised by replacing the water )

volume value with wording pertaining to the water volume limit. The Bases section for l Specification 3/4.7.1.3 will be modified to clarify analysis assumptions on reactor coolant pump operation. An editorial change which consists of the addition of the plant operating license number is included in this proposed amendment.

The proposed technical specification changes are presented in Attachment A. The safety analysis )

and no significant hazard evaluation is presented in Attachment B.

This change has been reviewed by the Beaver Valley review committees. The change was determined to be safe and does not involve a significant hazard consideration as defined in 10 CFR 50.92 based on the attached safety analysis and no significant hazard evaluation. An implementation period of up to 60 days is requested following the effective date of this amendment.

Sincerely,  !

140003 W ]

l Sushil C. Jain e c: Mr. D. S. Collins, Project Manager i Mr. D. M. Kern, Sr. Resident Inspector oh Mr. H. J. Miller, NRC Region I Administrator Mr. W. P. Dornsife, Director BRP/DEP Mr. M. P. Murphy (BRP/DEP)

, l O LI A 1 i M 9903250021 990316 E4ERGV

[

ADOCK 05000412 PDR P PDR g

E

i - -

OF AMENDMENT i

l COMMONWEALTH OF PENNSYLVANIA)

) SS:

COUNTY OF BEAVER ) l

Subject:

Beaver Valley Power Station, Unit No. 2 i Docket No. 50-412, License No. NPF-73 l License Amendment Request No.136 i

Before me, the undersigned notary public, in and for the County and Commonwealth aforesaid, this day personally appeared Sushil C. Jain, to me known, who being duly sworn according to law, deposes and says that he is Senior Vice President, Nuclear Services of the Nuclear Power Division, Duquesne Light Company, he is duly authorized to execute and file the foregoing submittal on behalf of said i

Company, and the statements set forth in the submittal are true and correct to the best of 1 l his knowledge, information and belief.

he M wW Sushil C. Jain ~

Subscribed and sworn to before me j on this/6 day of //(Ltd( #97 6 t8NL d JL ! o

,v.

k_f/Tlr

~ 0 E NoYrla'l Seal Tracey A. Baczek, Notary Pubfc My om n p'ir A .6 1 Memoer,Pennsylvanic Association of Notaries