Application for Amends to Licenses DPR-66 & NPF-73, Consisting of Change Requests 235 & 109,incorporating Editorial Changes for Unit 1 & Implementing Requirements of GL 95-05 for voltage-based SG Tube Repair Criteria
ML20113B330
Person / Time
Site: Beaver Valley
Issue date: 06/18/1996
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20113B333 List:
References
GL-95-05, GL-95-5, NUDOCS 9606270052
Download: ML20113B330 (3)


Text

Beaver Valley Power Station Shippingport, PA 15077-0004 tv slon Vke esident fax 12) 3-80 Nuclear P Division U. S. Nuclear Regulatory Commission June 18, 1996 Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. I and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Proposed Operating License Change Request Nos. 235 and 109 Pursuant to 10 CFR 50.90, Duquesne Light Company requests an amendment to the above licenses in the form of changes to the technical specifications. The proposed changes will incorporate editorial changes for Unit No. I and implement the requirements of Generic Letter (GL) 95-05 for voltage-based steam generator tube repair criteria for Unit No. 2.

The proposed technical specification changes for Unit No. I and Unit No. 2 are presented in Attachments A-1 and A-2, respectively. The safety analysis (including the no significant hazards evaluation) is presented in Attachment B. A technical evaluation of the vcltage-based repair criteria is presented in Attachment C.

This change has been reviewed by the Onsite Safety Committee and Offsite Review Committee. The change was determined to be safe and does not involve a significant hazard consideration as defined in 10 CFR 50.92 based on the attached safety analysis.

Approval of this amendment is requested prior to the start of the Beaver Valley Power Station, Unit No. 2 seventh refueling outage which is scheduled to start on March 7,1998. An implementation pericd of up to 60 days is requested following the effective date of this amendment. Projections of steam generator tube repairs do not indicate a need for voltage-based repair criteria to be used in the upcoming refueling outage at Unit No. 2. This refueling outage is scheduled to begin on August 30,1996.

Outage updates of potential need will be discussed with the NRC should circumstances develop which necessitate earlier implementation.

bODI

/

Sincerely, d

DEllVillNG QUALITY Sushil C. Jain E N E.8 G V 2700,10

$paJgg gy 4

P

Beaver Valley Power St: tion, Unit No. I and No. 2 Proposed Operating License Change Request Nos. 235 and 109 Page 2 c:

Mr. L. W. Rossbach, Sr. Resident Inspector Mr. T. T. Martin, NRC Region 1 Administrator Mr. D. S. Brinkman, Sr. Project Manager Mr. W. P. Dornsife, Director BRP/DEP Mr. M. P. Murphy (BRP/DEP) l I

i

.(

I I

1

AFFIDAVIT FOR APPLICATION OF AMENDMENT COMMONWEALTH OF PENNSYLVANIA)

) SS:

COUNTY OF BEAVER

)

Subject:

Beaver Valley Power Station, Unit No. I and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Proposed Operating License Change Request Nos. 235 and 109 Before me, the undersigned notary public, in and for the County and Commonwealth aforesaid, this day personally appeared Sushil C. Jain, to me known, who being duly sworn according to law, deposes and says that he is Division Vice l

President, Nuclear Services of the Nuclear Power Division, Duquesne Light Company, he is duly authorized to execute and file the foregoing submittal on behalf of said Company, and the statements set forth in the submittal are true and correct to the best of his knowledge, information and belief.

Sushil C. Jain Subscribed and sworn to before me on this/[ day of uAf, /6/C/6 dum a Auk-my