Other: 05000312/LER-1986-020, Forwards Rev 3 to Procedure AP.56, Core Damage Assessment, for Inclusion in NRC Review of post-accident Sampling Sys. Procedure Revised to Correct Discrepancy Noted in LER 86-20, ML20137X776, ML20137X795, ML20151Y962, ML20203P855, ML20215C433, ML20215J722, ML20215L385, ML20215L569, ML20235P297
|
MONTHYEARML20137X7951985-11-22022 November 1985 Notice of Deviation from Insp on 850923-27 & 1007-15 Project stage: Other ML20137X7761985-11-22022 November 1985 Notice of Violation from Insp on 850923-27 & 1007-15 Project stage: Other ML20137T5231986-02-0606 February 1986 Forwards Summary of 860116 Meeting Re Lessons Learned from Davis-Besse & Rancho Seco Events Project stage: Request ML20151Y9621986-02-0606 February 1986 Forwards post-accident Sampling Sys (PASS) Design Changes Implemented to Correct Capability Deficiencies.Pass Still Meets Requirements of NUREG-0737,Item II.B.3.Clarification of PASS Design Also Encl,Per 860127 Discussions Project stage: Other ML20141N8801986-03-13013 March 1986 Forwards Addl Info Re Changes to Facility post-accident Sampling Sys,Per 860218 Meeting W/Nrc & 860220 Telcon.Data Re Induced Gamma Radiation & Accuracy of Portions of Sys Affected by Mods Will Be Provided When Available Project stage: Meeting ML20155F3891986-04-11011 April 1986 Documents Commitment Made at 860218 Meeting W/Nrc to Demonstrate Operability of post-accident Sampling Sys Prior to Startup.Scope & Schedule for Test Will Be Provided in Time for NRC Comments to Be Considered Project stage: Meeting ML20203P8551986-04-30030 April 1986 Forwards Summary of Test for Chloride & Boron Analysis Employing Appropriately Diluted Test Matrix of post-accident Sampling Sys Equipment,Per 860313 Commitment.Addl Mods to Improve Sys Reliability & Maintainability Also Encl Project stage: Other ML20235P2971987-03-13013 March 1987 Rev 3 to Procedure AP.56, Core Damage Assessment Project stage: Other ML20215L5691987-05-0404 May 1987 Forwards,For info,bi-weekly Update of Working Copy Status Rept of 870427 post-accident Sampling Sys Mods Project stage: Other ML20215J7221987-05-0404 May 1987 Submits Addl Info Re Mods to post-accident Sampling Sys in Effort to Improve Sys Reliability & Provide Alternate Analyses for Boron,Chlorides & Reactor Bldg Atmosphere Radioisotopes.Criterion 10 of NUREG-0737 Satisfied Project stage: Other ML20215C4331987-06-0202 June 1987 Forwards Biweekly Update of Working Copy Status Rept of PASS Mods .Work Request Initiated to Repair Leak on Output of Filter F-496 (Er 131281) & Mgt Safety Review Committee Review Completed on 870526 Project stage: Other ML20215L3851987-06-16016 June 1987 Forwards 870608 Biweekly Update of Working Copy Status Rept of post-accidental Sampling Sys Mods,For Info Project stage: Other 05000312/LER-1986-020, Forwards Rev 3 to Procedure AP.56, Core Damage Assessment, for Inclusion in NRC Review of post-accident Sampling Sys. Procedure Revised to Correct Discrepancy Noted in LER 86-201987-07-0606 July 1987 Forwards Rev 3 to Procedure AP.56, Core Damage Assessment, for Inclusion in NRC Review of post-accident Sampling Sys. Procedure Revised to Correct Discrepancy Noted in LER 86-20 Project stage: Other 1986-04-30
[Table View] |
|
---|
Category:NOTICE OF VIOLATION OF A REGULATION
MONTHYEARML20248K6301998-06-0303 June 1998 Notice of Violation from Insp on 980519-21.Violation Noted:Inspector Determined That Licensee Failed to Review & Consider All Info Obtained During Background Investigation ML20202C4771998-02-0505 February 1998 Notice of Violation from Insp on 980105-08.Violation Noted: on 971222,shipment of Scrap Metal,In Form of Auxiliary Boiler,Was Released from Rancho Seco Site W/O Having Been Surveyed ML20198K5451997-10-21021 October 1997 Notice of Violation from Insp on 970922-25.Violation Noted:On 970806,thermocouple for Spent Fuel Pool Temp Indicator Was Found to Be out-of-tolerance During Annual Calibration ML20248J6521989-03-31031 March 1989 Notice of Violation from Insp on 890114-0303.Violations Noted:Engineering Change Notice Not Initiated for Rebuilt Governor for Auxiliary Feed Pump Installed on 890131 & Maint Work Request Not Reviewed Prior to Performance of Test ML20244B1141989-03-27027 March 1989 Notice of Violation from Insp on 890123-0217.Violations Noted:Nonconformance Rept Not Written After Determination That Debris Caused Failure of Two Instrument Air Sys Check Valves During Performance of Test Procedure STP-774 ML20206B5891988-10-26026 October 1988 Notice of Violation from Insp on 880919-1007.Violation Noted:Relief Valves PSV-26101 & 26110 Made Inoperable & Written Safety Evaluation Not Completed to Provide Bases for Determination of Change ML20207L1961988-09-28028 September 1988 Notice of Violation from Insp on 880709-0906.Violation Noted:Temporary Mod of Outboard Seal of Auxiliary Feedwater Pump P-318 Not Controlled & Documented Per AP-26A.Seal Modified to Install Only Five Specified Packing Rings ML20154H8091988-09-0101 September 1988 Notice of Violation from Insp on 880719-21.Violation Noted:Failure to Maintain Calibr of Dedicated Emergency Equipment ML20153E4661988-08-16016 August 1988 Notice of Violation from Insp on 880719-22.Violation Noted: Individual Did Not Wear TLD Badge as Required While Working in Grade Level Decon Room ML20245D5511988-07-29029 July 1988 Notice of Violation from Insp on 880205-0617.Violations Noted:Overexposure of Licensed Matl on Skin,Hot Particle Zones Established to Repair Drain Line Not Posted & Licensee Did Not Notify Individual of Overexposure ML20150D9181988-06-24024 June 1988 Notice of Violation from Insp on 880606-10 & 19.Violation Noted:Licensee Had Not Submitted Required Annual Exposure Rept to Commission ML20155A6721988-05-23023 May 1988 Notice of Violation from Insp on 880330-0502.Violation Noted:Control Room HVAC Sys Actuated & Not Reported to NRC within 4 H ML20154J3441988-05-10010 May 1988 Notice of Violation from Insp on 880204-0329.Violation Noted:Failure of A2 Diesel Generator to Hot Start Automatically After Receiving Control Room Signal During Test Procedure Not Considered Nonconforming ML20154J3981988-05-10010 May 1988 Notice of Violation from Insp on 880404-08.Violation Noted: Licensee Did Not Maintain on File Spec 7A Package Certification for Radioactive Matl Transported in Package on Public Highways of State of CA ML20151C3611988-03-25025 March 1988 Notice of Violation from Insp on 871205-880203.Violation Noted:On 870702,NCR S6053 Signed & Closed by Quality Engineer W/O Corrective Actions in Block II of Ncr for Wire 1M1B180B Being Performed ML20148B4211988-03-0202 March 1988 Notice of Violation from Insp on 880125-0219.Violations Noted:Three safety-related Rsmm 0330 Gasket Line Items,W/ Expired Shelf Lives Had Not Been Tagged or Place in Hold Location IR 07100024/20120041988-02-10010 February 1988 Notice of Violation from Insp on 871024-1204.Violations Noted:On 871111,Work Request 139613A,Step 4 Not Performed While Troubleshooting HVAC Sys Refrigeration Unit & Nonconformance Rept Not Initiated to Correct Nonconformance ML20236T1811987-11-13013 November 1987 Notice of Violation from Insp on 870824-28,0911-18 & 1020. Violation Noted:Radioactive Matl Stored Inside Reactor Vessel Head Stand Fixture,Producing Whole Body Dose Rates Up to 500 Mrem/H Not Posted as High Radiation Area ML20235R0341987-09-21021 September 1987 Notice of Violation from Insp on 870530-0710.Violations Noted:Heat Treating of Yoke of Safety Feature Valve SFV-25004 Not Controlled Using Qualified Procedure & Cable Trays A57E1 & A57015 Had No Cable Tray Edge Bumpers ML20238A4691987-08-12012 August 1987 Notice of Violation from Insp on 870615-25.Violation Noted: Training Records of Thirty of Licensee Supervisors,Foremen & Engineering Staff Showed That Only Two Engineers Had Received Training Specified in ALARA Manual During 1985/86 ML20237G9641987-07-30030 July 1987 Notice of Violation from Insp on 870615-25.Violation Noted: Failure to Perform Proper Insp of Location & Routing of Approx 1,110 safety-related Cables Installed During 1983- 1985 ML20236P0021987-07-28028 July 1987 Notice of Violation from Insp on 870601-05,12 & 16. Violation Noted:Deficiencies Identified During 1986 Health Physics/Medical Drill Not Corrected ML20236D8631987-07-14014 July 1987 Notice of Violation from Insp on 870418-0529.Violation Noted:Liquid Penetrant Test Performed on Spent Fuel Pool Liner Not Controlled by Work Document or Procedure Which Included Quantitative or Qualitative Acceptance Criteria ML20215C3241987-05-29029 May 1987 Notice of Violation from Insp on 870504-08 ML20213G0651987-04-29029 April 1987 Notice of Violation from Insp on 870323-0403 ML20209J0731987-04-16016 April 1987 Notice of Violation from Insp on 870127-0205 ML20206R2581987-04-0707 April 1987 Notice of Violation from Insp on 870131-0227 ML20204B6531987-03-20020 March 1987 Notice of Violation from Insp on 870202-13 ML20207R1671987-03-0303 March 1987 Notice of Violation from Insp on 870109-16 & 22 ML20211H5441987-02-0606 February 1987 Notice of Violation from Insp on 851216-860411.Violations Noted:Failure to Establish Procedures for Loss of 120-volt Ac,Loss of Flux Indication & Dam Failure ML20210M5371987-01-22022 January 1987 Notice of Violation from Insp on 861117-21 & 1208-23 ML20207D0171986-12-12012 December 1986 Notice of Violation from Insp on 861027-1106 ML20215N2101986-10-28028 October 1986 Notice of Violation from Insp on 860402-25.Violations Noted: Listed Procedures Re Emergency Plan Not Maintained & Current Emergency Facilities Not Described in Emergency Plan ML20210R2141986-09-18018 September 1986 Notice of Violation from Insp on 860714-0822 ML20206R3641986-08-29029 August 1986 Notice of Violation from Insp on 860714-18 & 0806 ML20214M2391986-08-26026 August 1986 Notice of Violation from Insp on 860610-0725 ML20206N5961986-08-0707 August 1986 Notice of Violation from Insp on 860602-0711 ML20206R6351986-06-20020 June 1986 Notice of Violation from Insp on 860422-0531 ML20198H8131986-05-16016 May 1986 Notice of Violation from Insp on 860310-0421 ML20141J0501986-04-11011 April 1986 Notice of Violation from Insp on 860116-24 ML20202H9831986-04-0303 April 1986 Notice of Violation from Insp on 860203-0307 ML20137X7761985-11-22022 November 1985 Notice of Violation from Insp on 850923-27 & 1007-15 IR 05000928/20100311985-11-20020 November 1985 Notice of Violation from Insp on 850928-1031 ML20133E2641985-09-26026 September 1985 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Violations Noted:Design Basis for Quality Class 1,Seismic Class 1 Portion of Reactor Coolant Vent Sys Not Correctly Translated Into Design Specs ML20134F0091985-07-30030 July 1985 Notice of Violation from Insp on 850516-18 & 20-23 IR 05000314/20050031985-06-17017 June 1985 Notice of Violation from Insp on 850314-0503 ML20062H6341982-07-29029 July 1982 Notice of Violation from Insp on 820510-14 ML20054K2531982-06-24024 June 1982 Notice of Violation & Notice of Proposed Imposition of Civil Penalty in Amount of $120,000.Noncompliance Noted:Lack of Control of Licensed Activities & Failure of Operators to Be Aware of Status of safety-related Components 1998-06-03
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000312/19990031999-08-31031 August 1999 Insp Rept 50-312/99-03 on 990802-06.No Violations Noted. Major Areas Inspected:Decommissioning & Dismantlement Activities,Including Organization,Mgt & Cost Controls IR 05000312/19990021999-03-19019 March 1999 Insp Rept 50-312/99-02 on 990309-11.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communication & Testing & Maint IR 05000312/19980031998-08-0707 August 1998 Insp Rept 50-312/98-03 on 980706-09.No Violations Noted. Major Areas Inspected:Review of Licensee Programs Related to SFP Safety,Status of Decommissioning,Safety Review & self-assessments & Radiological Safety Programs ML20248K6301998-06-0303 June 1998 Notice of Violation from Insp on 980519-21.Violation Noted:Inspector Determined That Licensee Failed to Review & Consider All Info Obtained During Background Investigation IR 05000312/19980021998-06-0303 June 1998 Insp Rept 50-312/98-02 on 980519-21.Violations Noted. Major Areas Inspected:Announced Insp of Licensee Physical Security Program ML20202C4771998-02-0505 February 1998 Notice of Violation from Insp on 980105-08.Violation Noted: on 971222,shipment of Scrap Metal,In Form of Auxiliary Boiler,Was Released from Rancho Seco Site W/O Having Been Surveyed ML20202C4981998-02-0505 February 1998 Insp Rept 50-312/98-01 on 980105-08.Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls,Maint & Surveillance,Cold Weather Preparation,Decommissioning Performance & Status Review & Health Physics ML20198K5451997-10-21021 October 1997 Notice of Violation from Insp on 970922-25.Violation Noted:On 970806,thermocouple for Spent Fuel Pool Temp Indicator Was Found to Be out-of-tolerance During Annual Calibration IR 05000312/19970041997-10-21021 October 1997 Insp Rept 50-312/97-04 on 970922-25.Violations Noted. Major Areas Inspected:Organization,Mgt,Cost Control,Safety Reviews,Design Changes,Mods,Decommissioning Performance & Status Review IR 05000312/19970031997-06-17017 June 1997 Insp Rept 50-312/97-03 on 970603-05.No Violations Noted. Major Areas Inspected:Records & Repts,Testing & Maint, Protected Area Barrier & Detection Aids,Assessment Aids, Alarm Station & Communication & Security System IR 05000312/19970021997-04-25025 April 1997 Insp Rept 50-312/97-02 on 970331-0403.No Violations Noted. Major Areas Inspected:Incremental Decommissioning Activities in Turbine Bldg,Radiation Protection,Sfp Activities & Quality Assurance IR 05000312/19970011997-03-21021 March 1997 Insp Repts 50-312/97-01 & 72-0011/97-01 on 970224-27.No Violations Noted.Major Areas Inspected:Licensee Planned Work Associated W/Dismantlement of Turbine Bldg & Radiological Controls Being Implemented During Work Activities IR 05000312/19960031996-09-27027 September 1996 Insp Repts 50-312/96-03 & 72-0011/96-01 on 960909-12.No Violations Noted.Major Areas Inspected:Sfp & Radiological Ts,Radiological Exposure Controls & Implementation of New 10CFR49 Shipping Regulations IR 05000312/19930061993-09-0202 September 1993 Insp Rept 50-312/93-06 on 930819.No Violations or Deviations Noted.Major Areas Inspected:Licensee Employee Concerns Program IR 05000312/19930041993-08-11011 August 1993 Mgt Meeting Rept 50-312/93-04 on 930727.Major Areas Discussed:Status of Activities,Including Maint of Plant Equipment,Fire Protection Equipment & Plant Personnel Morale IR 05000312/19920071992-12-10010 December 1992 Insp Rept 50-312/92-07 on 921110-11.No Deviations or Violations Noted.Major Areas inspected:1992 Annual Emergency Preparedness Exercise & Associated Critiques & Inspector Identified Items IR 05000312/19900141990-11-14014 November 1990 Insp Rept 50-312/90-14 on 901003-04,09-11 & 1102.Violations Noted.Areas inspected:follow-up of Licensee Event Repts, Liquid Effluent,Solid Waste & Allegations IR 05000312/19900111990-07-31031 July 1990 Insp Rept 50-312/90-11 on 900527-0706.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Surveillance & Testing & QA IR 05000312/19890161989-09-21021 September 1989 Enforcement Conference Rept 50-312/89-16 on 890915. Violations Noted.Major Areas Discussed:Violations Noted in Insp Rept 50-312/89-16 & Indications That Findings Represent Decrease in Mgt Commitment to Emergency Preparedness IR 05000312/19890121989-09-21021 September 1989 Insp Rept 50-312/89-12 on 890801-04,21-25 & 30.No Violations Noted.Major Areas Inspected:Occupational Exposure,Including Alara,Radwaste Sys,Liquid & Liquid Wastes & Radwaste Mgt & Transportation PNO-V-89-056, on 890911,SMUD Board Rejected Golden State Energy Proposal to Purchase Plant1989-09-12012 September 1989 PNO-V-89-056:on 890911,SMUD Board Rejected Golden State Energy Proposal to Purchase Plant IR 05000312/19890141989-09-11011 September 1989 Insp Rept 50-312/89-14 on 890828-0901.Violations Noted Re Failure to Conduct Required Semiannual Health Physics Drill & Initial Training.Major Areas Inspected:Operational Status of Emergency Preparedness Program PNO-V-89-053, on 890901,Golden State Energy Proposal to Purchase Rancho Seco Submitted to Util,Including MOU for Purchase of Plant,Power Sale Agreement & Interim Operation & Maint of Facility & Rate Structure.Vote Expected on 8909071989-09-0505 September 1989 PNO-V-89-053:on 890901,Golden State Energy Proposal to Purchase Rancho Seco Submitted to Util,Including MOU for Purchase of Plant,Power Sale Agreement & Interim Operation & Maint of Facility & Rate Structure.Vote Expected on 890907 PNO-V-89-050, on 890823,util Announced That Board of Directors Would Meet on 890825 Re Proposed Golden State Energy Purchase of Plant.Key Issues Listed,Including MOU Addressing Power Sale Agreement1989-08-23023 August 1989 PNO-V-89-050:on 890823,util Announced That Board of Directors Would Meet on 890825 Re Proposed Golden State Energy Purchase of Plant.Key Issues Listed,Including MOU Addressing Power Sale Agreement IR 05000312/19890101989-08-10010 August 1989 Insp Rept 50-312/89-10 on 890603-0721.No Violations Noted. Major Areas Inspected:Areas of Operational Safety Verification,Health Physics & Security Observations,Maint, Surveillance & Testing & QA & Followup Items PNO-V-89-044, on 890720,util Board Voted by 4-1 Vote to Enter Exclusive Negotiations W/Quadrex Corp for Possible Sale of Plant.Key Milestone Dates Listed.Board Maintained That Several Key Issues Must Be Addressed Before Voting on Sale1989-07-21021 July 1989 PNO-V-89-044:on 890720,util Board Voted by 4-1 Vote to Enter Exclusive Negotiations W/Quadrex Corp for Possible Sale of Plant.Key Milestone Dates Listed.Board Maintained That Several Key Issues Must Be Addressed Before Voting on Sale IR 05000312/19890081989-07-11011 July 1989 Insp Rept 50-312/89-08 on 890422-0602.No Violations or Deviations Noted.Two non-cited Violations Discussed.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations & ESF Sys Walkdown IR 05000312/19890111989-07-0606 July 1989 Insp Rept 50-312/89-11 on 890629-30.No Violations Noted. Major Areas Inspected:Licensee Radiochemical Analyses to Verify Accuracy of Measurements of Radionuclides in Release Tank Water & Sediment from Effluent Discharge Point PNO-V-89-039, on 890620,util Announced That Licensee Open to Offers to Purchase Facility Until 890630.Of All Bidders,Only Quadrex Corp Proposes to Operate Facility as Nuclear Plant. Evaluation of Bids Expected to Be Completed by End of Jul1989-07-0303 July 1989 PNO-V-89-039:on 890620,util Announced That Licensee Open to Offers to Purchase Facility Until 890630.Of All Bidders,Only Quadrex Corp Proposes to Operate Facility as Nuclear Plant. Evaluation of Bids Expected to Be Completed by End of Jul PNO-V-89-036, on 890620,SMUD Voted 3-2 to Allow 10 Days for Qualified Private Bidders to Submit Proposals to Take Over Facility.Conditions Imposed on Bidders Listed.Existing Quadrex Proposal Withdrawn1989-06-21021 June 1989 PNO-V-89-036:on 890620,SMUD Voted 3-2 to Allow 10 Days for Qualified Private Bidders to Submit Proposals to Take Over Facility.Conditions Imposed on Bidders Listed.Existing Quadrex Proposal Withdrawn PNO-V-89-035, on 890619,licensee Announced That D Keuter Had Been Appointed New Site Manager & Jr Shetler as Deputy Site Manager.Licensee Recognizes That Organizational Changes Subj to NRC Approval1989-06-20020 June 1989 PNO-V-89-035:on 890619,licensee Announced That D Keuter Had Been Appointed New Site Manager & Jr Shetler as Deputy Site Manager.Licensee Recognizes That Organizational Changes Subj to NRC Approval PNO-V-89-034, on 890615,offer to Assume Financial & Technical Responsibility for Plant Announced.Plant Presently in Cold Shutdown W/Activities Continuing Towards off-loading Reactor Core in Oct 19891989-06-16016 June 1989 PNO-V-89-034:on 890615,offer to Assume Financial & Technical Responsibility for Plant Announced.Plant Presently in Cold Shutdown W/Activities Continuing Towards off-loading Reactor Core in Oct 1989 PNO-V-89-033C, on 890609,plant Reached Cold Shutdown in Preparation for Reinstalling Refueling Bridge Into Reactor Bldg.Bridge Removed for Refurbishment/Mod.Reduction in Force of Nonessential Contractor Personnel in Progress1989-06-12012 June 1989 PNO-V-89-033C:on 890609,plant Reached Cold Shutdown in Preparation for Reinstalling Refueling Bridge Into Reactor Bldg.Bridge Removed for Refurbishment/Mod.Reduction in Force of Nonessential Contractor Personnel in Progress PNO-V-89-033B, on 890608,licensee Continuing Cooldown of Plant.Ceo Nuclear,J Firlit,Announced Resignation.Work Force Reductions Initiated Which Will Initially Involve Approx 420 Nonessential Contractor Clerical & Crafts Personnel1989-06-0808 June 1989 PNO-V-89-033B:on 890608,licensee Continuing Cooldown of Plant.Ceo Nuclear,J Firlit,Announced Resignation.Work Force Reductions Initiated Which Will Initially Involve Approx 420 Nonessential Contractor Clerical & Crafts Personnel PNO-V-89-033A, on 890607,util Shut Down Plant & Entered Hot Shutdown Due to Voter Defeat of Measure K.Util Continuing to Implement Contingency Plan to Remove Plant from Svc. Reductions in Site Work Force Under Consideration1989-06-0707 June 1989 PNO-V-89-033A:on 890607,util Shut Down Plant & Entered Hot Shutdown Due to Voter Defeat of Measure K.Util Continuing to Implement Contingency Plan to Remove Plant from Svc. Reductions in Site Work Force Under Consideration PNO-V-89-033, on 890606,voters Defeated Measure K,Encouraging Util to Cease Operating Facility.Util Board Previously Announced That Plant Would Be Shutdown If Measure K Defeated.Safe Shutdown Plan Implemented1989-06-0707 June 1989 PNO-V-89-033:on 890606,voters Defeated Measure K,Encouraging Util to Cease Operating Facility.Util Board Previously Announced That Plant Would Be Shutdown If Measure K Defeated.Safe Shutdown Plan Implemented PNO-V-89-030, on 890518,airborne Process Monitors for Reactor Bldg Stack,Auxiliary Bldg Stack & Auxiliary Bldg Grade Level Vent Inoperable.Caused by Computer Controlled Svc Air Purge Valves in Open Position.Possibly Caused by Software Errors1989-05-19019 May 1989 PNO-V-89-030:on 890518,airborne Process Monitors for Reactor Bldg Stack,Auxiliary Bldg Stack & Auxiliary Bldg Grade Level Vent Inoperable.Caused by Computer Controlled Svc Air Purge Valves in Open Position.Possibly Caused by Software Errors IR 05000312/19890071989-04-28028 April 1989 Insp Rept 50-312/89-07 on 890417-21.No Violations Noted. Major Areas Inspected:Previously Identified Items & Status of Emergency Preparedness Program IR 05000312/19890041989-03-31031 March 1989 Insp Rept 50-312/89-04 on 890114-0303.Violations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Qa Surveillance & Testing & Followup Items ML20248J6521989-03-31031 March 1989 Notice of Violation from Insp on 890114-0303.Violations Noted:Engineering Change Notice Not Initiated for Rebuilt Governor for Auxiliary Feed Pump Installed on 890131 & Maint Work Request Not Reviewed Prior to Performance of Test IR 05000312/19880391989-03-28028 March 1989 SALP Rept 50-312/88-39 for July 1986 - Dec 1988 ML20244A8021989-03-28028 March 1989 SALP Rept 50-312/88-39 for July 1986 - Dec 1988 ML20244B1141989-03-27027 March 1989 Notice of Violation from Insp on 890123-0217.Violations Noted:Nonconformance Rept Not Written After Determination That Debris Caused Failure of Two Instrument Air Sys Check Valves During Performance of Test Procedure STP-774 ML20244B1161989-03-24024 March 1989 Insp Rept 50-312/89-01 on 890123-0217.Violations Noted.Major Areas Inspected:Maint Program & Implementation of Related Activities IR 05000312/19880421989-02-13013 February 1989 Insp Rept 50-312/88-42 on 881227-30 & 890125-27.No Violations Noted.Major Areas Inspected:Followup Items,Part 21 Repts,Lers & Licensee Program to Maintain Quality of Diesel Generator Fuel Oil IR 05000312/19880411989-02-13013 February 1989 Insp Rept 50-312/88-41 on 881214-890103.No Violations Noted. Major Areas Inspected:Onsite Followup of Event of 881212 & Associated Mgt Meetings on 881219 & 890103.Weaknesses Observed Re Decision to Operate Plant in Degraded State IR 05000312/19880401989-02-0606 February 1989 Insp Rept 50-312/88-40 on 881208-890113.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Qa & Surveillance & Testing ML20235T2211989-02-0606 February 1989 Exam Rept 50-312/OL-88-02 on 881206-13.Exam Results:All Seven Senior Reactor Operator Candidates Passed Written & Oral Exams ML20196B6881988-11-30030 November 1988 PNS-V-88-006:on 881126,licensee Received Telcon Alleging That Nonlicensed Equipment Operator Observed Using Illegal Drugs.Individual Submitted to Urinalysis Test & Showed Positive for Marijuana.Individual Terminated on 881130 IR 05000312/19880351988-11-21021 November 1988 Mgt Meeting Rept 50-312/88-35 on 881114.Major Areas Discussed:Licensee Operational Performance Since Restart in Mar 1988 & Progress Re Restart Commitments in Areas of Engineering,Procurement,Maint & Effluent Sys Areas 1999-08-31
[Table view] |
Text
.
APPENDIX A NOTICE OF VIOLATION Sacramento Municipal Utility District License No. DPR-54 L P. O. Box 15830 Docket No. 50-312 Sacramento, California 95813 As a result of the inspection conducted during the period of September 23-27, 1985, October 7-15, 1985, and telephone discussions of October 18, 21, 22, 23 l
and 24, 1985, and'in accordance with NRC Enforcement Policy 10 CFR, Part 2, Appendix C, the following violations were identified.
A. Technical Specifications, Section 6.11, " Radiation Protection Program" states in part: " Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained, and adhered to for all operations involving l radiation exposure.". The following procedures established pursuant to Technical Specifications, Section 6.11 state in part:
- 1) "That workers are responsible for obeying posted, oral, and written
,' instructions radiation protection on RWPsinstructions (Procedure and procedures, AP-305, Article 2,including
" Responsibility of Workers").
+
+
- 2) "It is the responsibility of all personnel utilizing an RWP to l familiarlze themselves'with the radiological conditions listed, protective' clothing and dosimetry required, and any special instructions. Each RWP user will complete his own individual items as Name, Initials, Date, and Badge No. Individual completion of
! these items constitutes acknowledgement of the conditions and i
requirements as listed"-(Procedure AP-305-4, " Radiation Work Permits, paragraph 3.2.3.5").
- 3) "A dosimeter must be worn by anyone when' entering Controlled Areas if it is required by the RWP" (Procedure AP 305-3, " Direct Reading Pocket Dosimeter Assignment and Use")".
Contrary to the above requirement, radiation protection procedures were not to adhered as observed by the inspector on:
l 1) September 25, 1985, when an auxiliary operator did not wear the pocket ionization chamber nor the same protective clothing required by RWP 85-743 while working on the resin transfer solidification pad,
- 2) September 26, 1985, when an utility worker did not wear the protective clothing cloth hood required by RWP 85-743 while working on the resin transfer solidification pad and,
- 3) October 9,1985, when a security guard did not wear the protective shoe covers required by RWP 85-738 while on the -20 foot level of the auxiliary building.
l This is a Severity Level V Violation (Supplement IV).
8512100627 851122 PDR ADOCK 05000312 g PDR
- r
- c
- w. ; i L-
.B. Technical Specifications, Section 4.20, " Radioactive Gaseous Effluent
. Monitoring Instrumentation," Table 4.20-1 requires Instrument Channel Calibrations of the' reactor building purge vent and auxiliary building stack monitors sampler flow rate devices be accomplished bi-yearly-(BY).
Technical Specifications, Section~1.5.4, " Instrument Channel Calibration"
' defines'a channel' calibration as follows:
"An instrument channel calibration is a test, and adjustment (if Ns _,
necessary), to; establish that the channel output responds with acceptable
' range and accuracy to known values of the parameter which the channel measures or an accurate simulation of these values. - Calibration shall encompass the entire channel, including equipment actuation, alarm, or trip and shall be deemed to include the channel test."
Contrary to the above, on September 27, 1985, the inspector observed that
. the reactor. building purge vent and auxiliary building stack radioacti-vity monitoring systems sampler flow rate measurement devices were not' calibrated in that the test performed on June 24, 1985 did not~ '
quantitatively compare the measured flow rate by the devices to known flow rate values.
This is'a Severity Level IV Violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, Sacramento Municipal Utility
' District is-hereby required to submit to this office within thirty days-of the date of this Notice, a written statement or explanation addressing each alleged violation including: (1) the' corrective steps which have been taken
~
and the results' achieved; (2) corrective steps which will be taken to avoid further violations; (3) the date when full compliance will be achieved.'
Consideration may be given to extending your response time for good cause shown.
W Dated $$- '/ffY WY
/Ross A. Scarano, Director Division of Radiation Safety and Safeguards g
[