Other: 05000312/LER-1985-001, :on 850124,operations Personnel Found Hydrogen Monitor Sys Containment Isolation Valves Open.Caused by Tagging Inconsistency.Cover Panels added.Post-accident Sampling Sys Operation Procedure Revised, 05000312/LER-1986-020, Forwards Rev 3 to Procedure AP.56, Core Damage Assessment, for Inclusion in NRC Review of post-accident Sampling Sys. Procedure Revised to Correct Discrepancy Noted in LER 86-20, ML17341B657, ML20002B642, ML20023B820, ML20024A705, ML20137X776, ML20137X795, ML20151Y962, ML20203P855, ML20215C433, ML20215J722, ML20215L385, ML20215L569, ML20235P297
|
MONTHYEARIR 05000312/19800131980-07-0202 July 1980 IE Insp Rept 50-312/80-13 on 800505-09.No Noncompliance Noted.Major Areas Inspected:Document Control Program,Onsite Review Committee Operations,Reactor Operator Requalification Program & IE Bulletin 79-27 Followup Project stage: Request ML20002B6421980-12-15015 December 1980 Forwards Commitments for Implementation of Items in NUREG-0737, Clarification of TMI Action Plan Requirements Project stage: Other ML17341B6571982-02-16016 February 1982 Forwards List of Procedures & Basis Used to Determine Whether or Not Radiological Effects Are Anticipated Re post-accident Analysis of Reactor Coolant Samples Project stage: Other ML20023B8201983-05-0202 May 1983 Forwards Resolution of Open Items Re NUREG-0737,Item II.B.3, Post-Accident Sampling Sys, Per 830215 Evaluation & 830314 Telcon.No Significant Radiation Effects Anticipated Project stage: Other ML20024A7051983-06-17017 June 1983 Clarifies Info Provided in Re NUREG-0737,Item II.B.3 Post-Accident Sampling Sys (Pass), Per 830526 Request.Equipment Ordered to Allow Powering of Analyzer & Solenoid Valves from Reliable Source within 3 H Project stage: Other ML20137X7951985-11-22022 November 1985 Notice of Deviation from Insp on 850923-27 & 1007-15 Project stage: Other ML20137X7761985-11-22022 November 1985 Notice of Violation from Insp on 850923-27 & 1007-15 Project stage: Other ML20151Y9621986-02-0606 February 1986 Forwards post-accident Sampling Sys (PASS) Design Changes Implemented to Correct Capability Deficiencies.Pass Still Meets Requirements of NUREG-0737,Item II.B.3.Clarification of PASS Design Also Encl,Per 860127 Discussions Project stage: Other ML20141N8801986-03-13013 March 1986 Forwards Addl Info Re Changes to Facility post-accident Sampling Sys,Per 860218 Meeting W/Nrc & 860220 Telcon.Data Re Induced Gamma Radiation & Accuracy of Portions of Sys Affected by Mods Will Be Provided When Available Project stage: Meeting ML20155F3891986-04-11011 April 1986 Documents Commitment Made at 860218 Meeting W/Nrc to Demonstrate Operability of post-accident Sampling Sys Prior to Startup.Scope & Schedule for Test Will Be Provided in Time for NRC Comments to Be Considered Project stage: Meeting ML20203P8551986-04-30030 April 1986 Forwards Summary of Test for Chloride & Boron Analysis Employing Appropriately Diluted Test Matrix of post-accident Sampling Sys Equipment,Per 860313 Commitment.Addl Mods to Improve Sys Reliability & Maintainability Also Encl Project stage: Other 05000312/LER-1985-001, :on 850124,operations Personnel Found Hydrogen Monitor Sys Containment Isolation Valves Open.Caused by Tagging Inconsistency.Cover Panels added.Post-accident Sampling Sys Operation Procedure Revised1987-01-22022 January 1987
- on 850124,operations Personnel Found Hydrogen Monitor Sys Containment Isolation Valves Open.Caused by Tagging Inconsistency.Cover Panels added.Post-accident Sampling Sys Operation Procedure Revised
Project stage: Other ML20235P2971987-03-13013 March 1987 Rev 3 to Procedure AP.56, Core Damage Assessment Project stage: Other ML20215J7221987-05-0404 May 1987 Submits Addl Info Re Mods to post-accident Sampling Sys in Effort to Improve Sys Reliability & Provide Alternate Analyses for Boron,Chlorides & Reactor Bldg Atmosphere Radioisotopes.Criterion 10 of NUREG-0737 Satisfied Project stage: Other ML20215L5691987-05-0404 May 1987 Forwards,For info,bi-weekly Update of Working Copy Status Rept of 870427 post-accident Sampling Sys Mods Project stage: Other ML20215C4331987-06-0202 June 1987 Forwards Biweekly Update of Working Copy Status Rept of PASS Mods .Work Request Initiated to Repair Leak on Output of Filter F-496 (Er 131281) & Mgt Safety Review Committee Review Completed on 870526 Project stage: Other ML20215L3851987-06-16016 June 1987 Forwards 870608 Biweekly Update of Working Copy Status Rept of post-accidental Sampling Sys Mods,For Info Project stage: Other 05000312/LER-1986-020, Forwards Rev 3 to Procedure AP.56, Core Damage Assessment, for Inclusion in NRC Review of post-accident Sampling Sys. Procedure Revised to Correct Discrepancy Noted in LER 86-201987-07-0606 July 1987 Forwards Rev 3 to Procedure AP.56, Core Damage Assessment, for Inclusion in NRC Review of post-accident Sampling Sys. Procedure Revised to Correct Discrepancy Noted in LER 86-20 Project stage: Other 1986-03-13
[Table View] |
Text
,
flSMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S Street, P.O. Box 15830, Sacramento, CA 95813; (916) 452-3211 RJR 86-141 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA April 11,1986 J B MARTIN REGIONAL ADMINISTRATOR REGION Y OFFICE OF INSPECTION & ENFORCEMENT U S NUCLEAR REGULATORY COMMISSION 1450 MARIA LANE SUITE 260 WALKdT CREEK CALIFORNIA 94596 g3 J
T 3%
q z
.m C
DOCKET 50-312 2
PASS SYSTEM OPERABILITY
~
C RANCHO SECO NUCLEAR GENERATING STATION, UNIT N0. 1 T
Our letter of February 6,1986, discussed compliance with commitments and the Confirmatory Order of March 13, 1983, requiring the installation of a Post Accident Sampling System (PASS) at Rancho Seco. These items were discussed in detail at a meeting bl your office on February 18, 1986.
e This letter is intended to document a commitment made at that meeting to demonstrate operability of the PASS system prior to plant startup. We will inform you of the exact scope and schedule for this test in time for comments from your staff to be considered.
If we can provide any further information at this time, please contact Mr. Rcn Lawrence at (916) 452-3211, extension 4365.
\\Ws R. J. R RIGUEZt ASSISTANT GENERA MANAGER NUCLEAR