ENCLOSURE
e l
U.S. NUCLEAR REGULATORY COMMISSION I
REGION IV
E Docket No.:
50-312
,
License No.:
,
Report No.:
50-312/97-03 Licensee:
Sacramento Municipal Utility District.
Facility:
Rancho Seco Nuclear Generating Station I
Location:
Rancho Seco Nuclear Generating Station 14440 Twin Cities Road Herald, California Dates:
June 3-5,1997 i
!nspector:
D. Schaefer, Security Specialist, Plant Support Branch i
Approved By:
D. Blair Spitzberg, Chief, Nuclear Materials inspections I
and Fuel Cycle / Decommissioning Branch Division of Nuclear Materials Safety l
i
!
Attachment:
Supplemental Information i
l l
i
'
i l
-
!
!
!
!
l
!
"
9706200149 970517 PDR ADOCK 05000312 l-G PDR
,
.
.
-
,
- -....
_
... -.,
,,
i-2-EXECUTIVE SUMMARY Rancho Seco Nuclear Generating Station NRC Inspection Report 50-312/07-03 This was an announced inspection of the licensee's physical security program. The areas inspected included records and reports, testing and maintenance, protected area barrier and detection aids, assessment aids, alarm station and communication, security system power supply, security program plans and procedures, compensatory measures, protected area access control of personnel and packages, personnel training and qualification, management suppon, security program audit, and review of previous inspection findings.
During this inspection, the reactor was shut down and defueled.
Plant Suocort A very good records and reports program was in place. The security staff was
correctly reporting security events (Section 1.1).
A very good testing and maintenance program was in place. Timely repair of
security equipment resulted in a low number of compensatory posting hours for security officers (Section 1.2).
An effective protected area barrier and detection system were in place that would
provide delay and detection of individuals attempting unauthorized entry.
Additionally, the protected area barrier and detection system effectively limited access to only authorized personnel (Section 1.3).
The assessment aids system inside the protected area provided excellent
assessment of portal alarms, and produced a very good image on monitors in the security alarm station (Section 1.4).
A very good alarm station and security radio communication system was
maintained. Two pieces of communication equipment were inoperative (Section 1.5).
Security backup power supply system perforrned we!I (Section 1.6).
- Changes to security programs and plans did not decrease the effectiveness of the
plans. Implementing procedures met performance requirements in the physical security plans (Section 1.7).
l The compensatory measures program had been effectively implemented. Security
personnel were well trained on the program requirements (Section 1.8).
l l
-
...
.. -
- -
.
i i
!
i-3-l l
A very good program for searching personnel and packages entering the protected
area had been maintained (Section 1.9).
A very good security training program had been implemented. Security officers
displayed excellent conduct, confidence in their training, and knowledge of the procedural requirements (Section 1.10).
'
The security prograrn had been effectively managed by a well trained and highly
qualified staff, and was provided strong management support. The morale of the security officers was very good (Section 1.11).
The annual security audit provided an excellent evaluation of the security program
and was determined to be a strength in the overall security program (Section 1.12).
l l
l l
i
[
i l
l
\\
_ __
.,. _ _. _.
._
_ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _. _
l
.
c aport Details j
!
PHYSICAL SECURITY PROGRAM (81700)
'
The inspector reviewed elements of the physical security program in order to determine adequacy and compliance with the NRC-approved Rancho Seco Physical Security Plan for Long Term Defueled Condition, Amendment 6, Supplement 1,
!
dated January 15,1993. Evaluations and determinations were based primarily on i
observations of activities, review of records, and interviews with personnel. The
'
following paragraphs describe the inspection findings in each of the program areas inspected.
,
I
1.1 Records and Reports
!
a.
Insoection Scone The inspector reviewed safeguards event logs and security incident complaint reports to determine compliance with the requirements of 10 CFR 73.71 and the physical security plan.
,
l b.
Observations and Findinas The inspector reviewed the security event logs and the security incident complaint
'
reports from April 1996 to May 1997. There were no events recorded in the event log; there were 76 incident complaint reports recorded. The inspector determined that tha licensee conformed to the regulatory requirements regarding the reporting of security events. The security complaint incident reports were organized in numerical sequence and easy to audit. The licensee's records included trending and analysis of the security incident complaints.
c.
Conclusions A very good records and reports program was in place. The security staff was
,
correctly reporting security events, i
1.2 Testina and Maintenance i
a.
insoection Scope l
l The inspector reviewed the + wting and maintenance program to determine l
compliance with the requirerrionts of the physical security plan.
I b.
Observations and Findinas l
The inspector determined through interviews with security officers and supervisors
'
and a review of records that repairs to security equipment were completed in a
!
!
!
!
i i
.
5-
!
l timely manner. The timely response to repair detection aids, access control L
equipment, and security door locks resulted in a low number of compensatory L
postings.
I c.
' Conclusions l
A very good testing and maintenance program was in place. Timely repair of l
security equipment resulted in a low number of compensatory postings.
l 1.3 Protected Area Barrier and Detection Aids l
!
a.
insoection Scoce The inspector reviewed the licensee's protected area barriers and detection aids to determine compliance with the requirements of the physical security plan. (Note:
The licensee had no vital areas or vital equipment as defined in 10 CFR 73.2.)
b.
Observations and Findinos -
The inspector determined through observation that the protected area (the Fuel Storage Building) was appropriately locked and alarmed and that the protected area
!
barriers were adequate to ensure delay of a potential adversary, and to ensure that unescorted access was limited to authorized personnel. The alarm system
'
consisted of balanced magnetic switches at the entry points to the protected area and infrared and microwave detection aids inside the protected area. The alarms annunciated in a continuously manned alarm station. The inspector verified throcch testing that an alarm for each component annunciated in the alarm station. The
. protected area door locking mechanisms and alarms were properly tested.
Emergency exits from the protected area were locked and alarmed.
The inspector conducted a review of the lock and key inventory records.and keys in storage and verified that security related locks and keys for the protected area barrier were controlled in accordance with commitments in the physical security plan.
c.
Conclusions An effective protected area barrier and detection system were in place that would provide delay and detection to individuals attempting unauthorized entry.
l Additionally, the protected area barrier and detection system effe::tively limited
'
access to only authorized personnel.
i
!
!
_..
...
- - - _.. -. _. -
-
- - -.
.- - - _- - -
_- -
.. -
-
.
,.
!
'
-6-1.4 Assessment Aids
,
a.
Inspection Scone The inspector reviewed the assessment aids to determine compliance with the physical security plan. The areas inspected included the closed-circuit television monitors located in the alarm station.
!
b.
Observations and Findinas
.
L The inspector verified through observation that a closed circuit television system was installed inside the protected area and that the closed circuit television cameras were positioned to provide assessment of the protected area portal alarms.
Following an alarm, each closed circuit television camera produced a very good image on a monitor in the security alarm station.
c.
Conclusions i
The assessment aids system inside the protected area provided excellent assessment of portal alarms and produced a very good image on monitors in the
]
security alarm station.
J
!
1.5 Alarm Stations and Communications a.
Insoection Scone The inspector reviewed the communication capabilities to determine compliance with the requirements of the physical security plan. The areas inspected included the operability of radio and telephone systems and the capability to effectively communicate with the local law enforcement agencies through both of the systems, b.
Observations and Findinas The inspector determined through observations and interviews that the security dlarm station, located in the control room, was equipped with appropriate alarm, surveillance, and communication capabili+y. The alarm station was continually manned by a Control Room Operator / Alarm Station Operator whose duties did not interfere with the execution of assessment and response functions. The inspector determined that the Control Room Operator / Alarm Station Operator was capable of maintaining continuous communication with each security officer on duty and was
!
also capable of calling for assistance from the locallaw enforcement authority. The licensee maintained an adequate number of portable rndios for use by members of the security organization. Radio checks with the locd law enforcement authority
,
{
were conducted at least once each 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
,
f
.. _
,
_
_
_
_
_
_
. _.
_ _
!-
l l
l'
[
-7-l During this inspection, while in compliance with the physical security plan, the licensee's ring-down telephone to the Sheriff's Office and one of the security department's radio channels were temporarily inoperative. The licensee utilized
!
alternate means of communication to meet physical security plan requirements.
c.
Conclusions A good alarm station and a security radio communication system were maintained.
Two pieces of communication equipment were inoperative.
1.6 Security System Power Supply
-
a.
Inspection Scope The inspector reviewed the security system power supply to determine compliance with the physical security plan.
b.
Observations and Findinas The physical security plan requires that sufficient backup power for a specific period of time be provided to the security computer, alarm system, and the radio communications system. The licensee provided this backup power through multiple uninterruptible power supply systems. During this inspection, the licensee tested the backup power for the security computer and the alarm system as discussed in paragraph 2.1 below. The systems performed as required under the security backup power supply system.
c.
Conclusion The security backup power supply system performed well.
1.7 Security Proaram Plans and Procedures i
a.
InsDection Scoce l
The inspector reviewed the physical security plan and the implementing procedures to determine compliance with the requirements of 10 CFR 50.54(p) and the physical security plan.
b.
Observations and Findinas l
The inspector determined through interviews and observations that security, contingency, and training and qualifications plan changes did not decrease the
,
i effectiveness of the respective plans. The latest NRC-approved plans included:
(1) Rancho Seco Physical Security Plan for Long Term Defueled Conditions,
Amendment 6, Supplement 1; and (2) Rancho Seco Security Training and
. _ _ _ _
_ _.. _
_. _. _._
_ _. _ _ _ _ _ _. _ _. _ _ _ _.. _ _ _ _ _
.
.
i Qualification Plan for Long Term Defueled Condition, Revision 3. Both plans were dated January 15,1993.
The inspector verified that the licensee had an effective management system for the
!
development and administration of procedures and that changes to the procedures (
did not reduce the effectiveness of the licensee's security program.
j c.
Conclusions
(
Changes to security programs and plans did not decrease the effectiveness of the i
plans. Implementing procedures met performance requirements in the physical security plans.
1.8 Compensatory Measures a.
Inspection Scoce
,
The inspector reviewed the licensee's compensatory measures program to determine compliance with the requirements of the physical security plan. The areas inspected included deployment of compensatory measures and the
effectiveness of those measures.
-
l b.
Observations and Findinos The inspector confirmed that the licensee deploys compensatory measures in a
'
manner that adequately compensates for any degraded security system. The inspector determined through interv ews of security officers that the officers
scheduled to be assigned to compensatory posts were adequately trained for those duties.
c.
Conclusions The compensatory measures program was effectively implemented. Security personnel were well trained on the program requirements.
'
1.9 Protected Area Access Control of Personnel and Packaaes
!.
a.
Insoection Scope
. The inspector reviewed the access control program for personnel and packages into
.
'
the protected area to deteimine compliance with the physical security plan. (Note:
l it is not possible for vehicles to enter the protected area.)
t
.
?
l l
,
s.
.
.
,
b.
Observations and Findinas Upon e^ntering the industrial area, persons were issued a photo-identification
,
security key card which authorized access, as appropriate, to the industrial area and
'
the protected area. Persons not authorized a key card were escorted at a!! times within the industrial and protected areas. Prior to leaving the industrial arem all persons left their key card with the attending security officer.
j
.I The inspector determined through observations that personnel access to the l
'
protected area was effective'< controlled. The inspector verified that the licensee had a search program as v sitted to in the physical security plan for firearms, explosives, incendiary d
.., and other unauthorized materials. The fixed metal
'
du.ector and the explosivt. jetectoa at Security Door FB-308 were inspected and
'
tound to be functional and well maintained. The inspector verified that personnel
L
'
were properly identified and authorization was verified prior to the security officer
'
unlocking Security Docr FB-308 and providing access to the protected area. The inspector verified that the licensee maintained escort procedures for visitors
!
authcand access into the protected area.
l t
in adation to the protected area at the Spent Fuel Bu;lding, the licensee also maintained " security areas" throughout portions of the Turbine Building (industrial
area). Security areas included the control room (housing the security alarm console), and the communications room (housing the two security computers).
Personnel utilized their photo identification key card to access these security areas.
The inspector reviewed background investigation screening files for three individuals
'
authorized access to the industrial and protected areas. The licensee had l
contracted with Wackenhut locorporated to complete the required background
investigations. All screenirg files were accurate and complete.
i As an initiative, the licensee continued to submit the fingerprints for all persons requesting unescorted protected area access, to the California Department of
t Justice. The principle advantage of this system, is that once an employer (such as the licensee) registers a person with California Department of Justice, the employer
!
!
will be notified of any future reported criminal activities involving this person.
(Note: In accordance with 10 CFR 73.56, the licensee also submitted fingerprints
through the NRC to the Federal Bureau of investigation.)
$
c.
Conclusion A very good program for searching personnel and packages er:tering the protected area was maintained.
i f
f
,
>
I
-
_
_
,
,
._
_
~
..
-
i
.
- 10-l l
1.10 Personnel Trainina and Qualification
,
a.
inspection Scope The inspector reviewed the licensee's security training and qualification program to determine compliance with the requirements of the training and qualification plan.
I b.
Observations and Findinas During the inspection, the inspector observed security officers performing their duties. Without exce; Jon, the security officers displayed excellent conduct, l
confidence in their training, and knowledge of the procedural requirements.
i The security organization conducted al! required training in accordance with its approved security, training, and contingency plans. The inspector confirmed, by a review of the composite security training records, that the required training was conducted every 12 months.
l The inspector determined from a review of four training records and interviews with serwity officers that the licensee had an excehe.. program to ensure that security
,
o' ace s were trai. ed, equipped, and qualified to perform each assigned security-j related task or duty. The records reviewed were maintained current and well
'
orgenized. The inspector interviewed security officers and confirmed that their annual medical examinations were thorough.
c.
Conclusiens
!
A very good security training program was implemented. Security officers displayed excellent conduct, confidence i', their training, and knowledge of the procedural l
requirements.
1.11 Manaaement SuDDort a.
insc9etion Scoce l
l The inspector reviewed the effectiveness and adequacy of management support to
{
determine the degree of management support for the physical security program, b.
Observations and Findinas
.
The inspector determined through ot,;,ervations and from discussions with security force personnel that licenseu management was appropriately managing the security program, was wellinformed about security program requirements, and provided
strong support for the program. Further, the inspector determined that the security program was managed by a well trained and highly quahiied security staff. All
i l.
i
i
!
-11
!
l
!
members of the security organization had a clear understanding of their duties and i
j.
responsibilities, and the morale of the security officers was very good.
!
'
!
l c.
Conclusions
,
l t
l The security program was effectively managed by a well trained and highly qualified j
staff and was provided strong management support. The morale of the security
l officers was very good.
r 1.12 Security Proaram Audit
l a.
Inspection Scope l
The inspector reviewed the annual audit of the NRC-approved physical security
'
program to determine compliance with the physical security plan, contingency plan, and training and qualifications plan.
,
l
\\
l b.
Observations and Findinas The inspector reviewed Audit Report 96-A-015, dated December 24,1996, which j
documented the licensee's audit of the Rancho Seco Security Program and the
'
effectiveness of program implementation. This audit was conducted during the period December 9-18,1996, and concluded that the Ranch Seco Security Program was appropriate for a defueled plant and was effectively implemented in accordance j
with the permanently defueled techriical specifications and the physical security
'
plan. Additionally, the inspector determined through a review of records that the audit team was independent of plant security management and plant security management supervision and that the audit results were reported to the appropriate level of management. The inspector determined that the audit report was a program strength.
c.
Conclusions The annual security audit provided an excellent evaluation of the security program and was determined to be a strength in the overall security program.
l
FOLLOWUP (92904)
l 2.1 (Closed) inspection Followur, item 312/9602-01: Uninterruotible Power Supolv -
!'
System
!
'
!
During a previous security inspection the licensee had recently completed an
"
upgrade to the uninterruptible power supply system; however, final testing of the upgraded equipment had not been completed. Additionally, the licensee had not
,
l developed a procedure for testing this equipment and was unable to demonstrate
}
the capability of the unintenuptible power supply system.
,
,
_
i
,
_
-
.
- l
__
_
-.
-
.
.
...
,
I
.
,
l
12-During this inspection, the inspector reviewed the licensee's procedure for testing the uninterruptible power supply system and also observed the licensee conduct a test of this system. The licensee's test of this system demonstrated the ability of
,
security equipment to satisfactorily operate on backup power.
,
EXIT MEETING The inspector presented the inspection results to members of licei.see management
at the conclusion of the inspection on June 5,1997. The licensee acknowledged
the findings presented.
I
,
,
i l
I
!
l I
l
'
l
.
.
-
._
_
_- -
--
.-
-
. _ -.
-
o i*
l ATTACHMENT i
l SUPPLEMENTAL INFORMATION
!
PARTIAL LIST OF PERSONS CONTACTED l
Licensee i
R. Duperron, Supervisor, Security Operations
J. Field, Superintendent, Technical Services H. Humphrey, Supervisor, l&C Maintenance W. Koepke, Supervisor, Quality Control S. Redeker, Manager
T. Robinson, Supervisor, l&C T. Tucker, Superintendent, Operations W. Wilson, Supervisor, Radiation Protection / Chemistry I
INSPECTION PROCEDURES USED
!
IP 81700 Physical Security Program for Power Reactors IP 92904 Followup - Plant Support LIST OF ITEMS OPENED CLOSED AND DISCUSSED ltems Closed j
50 313/9602-01 IFl Uninterruptible Power Supply System i
LIST OF DOCUMENTS REVIEWED Security Event Logs and incident Complaint Reports from April 1996 to May 199~<
'
Plant Maintenance Manual Procedure,1.408, Revision 26, " Security Door Card aders and l
Alarms" l
l Rancho Seco Audit Report No. 96-A-015, dated December 24,1996
Composite list of dates of training and medical examination l