Notice of Violation from Insp on 860310-0421
ML20198H813
Person / Time
Site: Rancho Seco
Issue date: 05/16/1986
From: Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20198H800 List:
References
50-312-86-13, NUDOCS 8605300566
Download: ML20198H813 (1)


Text

. . - - . - . . - . .- - .. . - _ . . . -

i 1

  • i l

l

] APPENDIX A NOTICE OF VIOLATION i

Sacramento Municipal Utility District Docket No. 50-312 P. O. Box 15830 License No. DPR-54 As a result of the inspection conducted between March 10 and April 21, 1986, and in accordance with NRC Enforcement Policy, 10 CFR Part 2, Appendix C, the following violations were identified:

I 10 CFR 50.59 (b) states, in part, ". . .the licensee shall furnish.. . annually or

, at such shorter intervals as may be specified in the license, a report containing a brief description of such changes... including a summary of the safety evaluation of each."

In addition, paragraph 6.9.3 of the Rancho Seco Technical Specifications specifies, in part "... tabulation of facility changes, tests or experiments j required pursuant to 10 CFR 50.59 (b), shall be submitted on a monthly

} basis...."

{ Contrary to these requirements SA-516 plate material was used in 1983 for new

'l containment penetration assemblies in lieu of the forged assemblies specified I in the Updated Safety Analysis Report. This change was not reported until

March, 1986. The report contained no summary of the 10 CFR 50.59 evaluation, i

i This is a Severity Level IV violation (Supplement I).

f Pursuant to the provisions of 10 CFR 2.201, the Sacramento Municipal Utility 1 District is required to submit to this office within thirty days of the date ,

1 of this Notice a written statement or explanation in reply, including: (1) corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further items of noncompliance; and, (3) the date when full compliance will be achieved. Consideration may be given to extending your response time or good cause shown.

I MAY 161986 Date f'

(J,. F. Miller, Chief j Reactor Projects Section 2 I