n-----

l:

,.e

r

'.f 1-

  • gsuuo SACRAMENTO MUNICIPAL UTILITY DISTRICT C P. O. Box 15030. Sacramento CA 95852 1830,(916) 452-3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA JUN 0 21987 GCA 87-086 l

\\,

J. B. Martin Administrator l'

U. S. Nuclear Regulatory Commission Region V Office of Inspection and Enforcement 1450 Maria Lane Suite 210 Walnut Creek CA 94596 Docket.50-312 l

Rancho Seco Nuclear Generating Station Unit #1 i

PASS STATUS kEPORT I

Dear Mr. Martin:

Attached is the bi-weekly update of a working copy status report of the PASS modifications dated 5/25/87 for your irformation.. This report has been provided to the Resident Inspector's Office.

l Should you have any questions, please contact Bob Fraser at extension 4364 or Masa Nakao at extension 3905.

Sincerely,

/b.

L G. Car And ini i

Chief Execut ye 0*ficer, Nuclear Attachments cci-George Kalman, NRC - Bethesda (2)

A. D'Angelo, NRC - Rancho Seco M. Cillis, NRC - Walnut Creek 5

o x

l=

x

. t's a

m E2

-o o ao ri3m 2~

o2

< 3>

Q w

8706180116 870602 V

DR ADOCK 05000312 l

~

,,t enn 95638 9799; (209) 333 2935 f[g RANCHO SECO NUCLEAR GENERATING STATION O 14440 Twin Cities Road, Herald, CA

t,a t

k 5/26/87-Page 1 of 5 PASS STATUS REPORT

-PASS ECNs i

A-5773 ADD RADIATION MONITOR AND RELOCATE IGE

-MEL sheet revisions are complete.

l ACTION

-Tech Spec required testing of Rad Mon R-15713 will l

be incorporated into Surveillance Procedure SP.3 to-satisfy the weekly " CHECK" and monthly " TEST".. A new i j

SP'(SP 1107) has been drafted for the quarterly j

" CALIBRATION" (Ref Tech Spec Table 4.1-1, item 44a).

1 A-5735 ADD PASS ION CHROMATOGRAPH

-WR 128497 closure in progress.

-Table top chart recorder has been received but requires minor modifications for use with the IC.

l Drawing changes have been received and WR 128492 has i

been written to.make the changes.

l

-Functional. testing in progress.

-STP 4S0-(DHS Sample Test) must be performed before h

this 2CN can be turned over to Operations.

A-4711I INSTALL BACKUP SOURCE OF FLUSH AND COOLING WATER

-Release is tied to the performance of STP 433.

B-0285 DHS SAMPLE VALVE REPLACEMEJTS

-Replaces valves.HV-26000, HV-26003 and HV-26004.

-Construction is complete and final functional l

testing is in progress.

-NCR S-3179 and NCR S-3324 closures are pending closure of this ECN.

-Associated Work Requests: (NE) 131063 & 131066; (EM) 131068 & 131069 R-0317 RELOCATE GRAB SAMPLE CONNECTIONS

-WR 131276 is closed and release to Operations is l

expected by 5/28/87.

l

.R-0381 ADD CHECK VALVES TO DHS SAMPLE LINES

-Release is pending and in-service leak check of valves RSS711 and RSS712 with the RCS in hot shut down.

Will be done in conjunction'with STP 433.

This is to check for thru-valve leakage.

R-0424 FLUSH / DILUTION WATER DEMINERALIZER ACTION

-Need to replace Conductivity Indicator CI-49601 with a model having the correct range.

The ECH and l

proposed change are being reviewed by the Design Engineer.

-Work request initiated to repair the leak on the

^

output of Filter F-496 (WR 131281).

s

i.<

  • ~.

i Page 2 of 5 R-0488 HYDROGEN ANALYZER / PASS SAMPLE LINE HEAT TRACING CHANGES

-Release is tied performance of STP-793.

ACTION

-Revise Process Standards (AP.100) to incorporate

)

instrument set points.

-Engineering Action Request (EAR) IC87-012 initiated with a due date of 5/1/87.

-Design calculations have been received.

The Process Standards will 1e revised as soon as l

STP-793 is approved.

l ACTION

-Revise procedure A.52 step 4.1.10.4.4 to specify the calibrated setting and not specifically 285 deg.F since they are not all set at 285.

Also add a reference to the appropriate section of Process Standards.

B-0559 SCAS PANEL MODIFICATION

-Release is tied to performance of STP 433.

ACTION

-Manuals require update. (In progress)

-N27.01-IM01

-N27.01-IM02 1

-N27.02-IM01 1

-N27.08-6 (May not require update)

-FPR #1 written to replace 4 SIMPSON meters with NEWPORT meters. Revised drawings received.

-Purchase request (PR 10359) issued for the new meters.

-FPR #2 initiated to add "T"

fittings for adding water to calibrate the level probes in V716 and V717.

-FPR #2 approved.

WR 131289 written to instal.1 the fittings.

Work is pending receipt of parts.

ACTION

-The SCAS panel needs internal lighting installed.

-Field Problem Report (FPR) #4 was written.

l ACTION

-Revise Process Standards (AP.100) to incorporate instrument set points.

-Engineering Action Request (EAR) IC87-042 initiated with a due date of 6/1/87.

-NCR S-5563 closure is pending closure of this ECN.

-Associated Work Requests:

(TE) 115524; (IC) 115530 & 117320; (NE) 114291; (MM) 113381 l

& 119229; (EM) 110022 & 117222

]

R-0732 BACKUP LAB FOR PASS GRAB SAMPLES l

-Management Safety Review Committee (MSRC) review was l

l completed on 5/26/87.

l

-Release is tied to the performance of STP-430.

l

Page 3 of 5

~

PASS STPs 426 SAMPLING TIMES USING THE PASS

-Test Outline approved.

-The procedure has been reviewed by the Test Working Group (TWG).

TWG approval is pending approval of AP.313-1 (PASS Operatina Procedure) revision 1.

-STP-426 records the sampling tines during the performance of AP.313-1.

-AP.313-1 draft is in progresa.

428 MEASURE VOLUMES A & B

-The procedure will be revised and reperformed.

-Test Outline is drafted.

l 429 MEASURE VOLUMES S & T

-The procedure will be revised and reperformed.

-Test Outline is drafted.

l 430 DHS SAMPLE TEST i

-The Test Outline is approved.

-The procedure is scheduled for review by the TWG on l

5/27/87.

l 431 SYSTEM FLUSH

-Test complete.

-Test results were submitted to the TWG for review.

-NCR S-5309 Rev. O closure is pending final signoff of STP-431.

432 GASEOUS SAMPLE TEST

-The Test Outline and procedure are approved.

-WR 131280 initiated to install test "Ts" for collecting gas samples and to provide I&C support.

-Performance is pending replacement parts for pump l

P-793.

433 RCS SAMPLE TEST

-The Test Outline is approved.

-Incorporating TWG comments.

Awaiting Chemistry's comments.

793 HEAT TRACING

-The Test Outline was reviewed by the TRG on 4/9/87.

Comments to be incorporated.

-The Test Outline is being revised to incorporate i the new acceptance criteria.

l

-The procedure is in TWG for additional review which l

is expected to occur on 5/27/87.

4 e

A

i.

Page 4 of 5 PASS SPs 907 MONTHLY FUNCTION TEST OF PASS

-Drafting of Test Outline and Procedure pending revision 1 to Operating Proced t:4e AP.313-1.

l PASS APs I

313-1 EMERGENCY SAMPLING USING THE PASS ACTION

-Revision 0 approved 2/26/86.

Revision 1 is being redrafted and is expected to be submitted to Word

' Processing'by 6/2/87.

313-1A UNDILUTED GRAB SAMT E FROM PASS FOR OFFSITE ANALYSIS

-Revision 0.pproved 2/26/86.

313-1B DILUTED GRAB SAMPLI FROM PASS FOR ONSITE ANALYSIS

-Revision 0.pproved 2/26/86.

313-1C GAS CHROMATOGRAPH F3ING THE CARLE AGC SERIES GC

-The draft is complete except for enclosures.

313-1D HANDLING AND LOADING OF NUPAC CASK MODEL NUMBER PAS-2

-The procedure is in multi-discipline review.

MISCELLANEOUS ITEMS DESIGN BASIS REPORT

-The' PASS design basis has been issued for the initial revien. The System Engineer reviewed the draft and provided comments to the Design Engineer.-

TRAINING ACTION

-Provide on-the-job training for Chemistry Technicians in the use of PASS.

-Five Technicians have been selected and will i

begin hands on training as soon as the Operating i

Procedure (AP.313-1) is approved.

-Functional testing will be performed during the development of the operating procedure.

SPARE PARTS ACTION

-Efforts have begun to develop a spare parts list.

l When the list is finalized a Purchase Order will be initiated.

PREVENTATIVE MAINTENANCE ACTION

-A Preventive Maintenance program must be developed for the appropriate PASS components.

d

~. 5 4

' 'r -

Page 5 of 5 PASS COMMITMENTS

-A letter was sent from John Ward to Frank Miraglia (NRR) on 5/4/87 specifing additional information on PASS accuracy and range. (Ref: JEW 87-750) j PAINTING

-Work Request 131294 has been written to have the room !

painted which houses the PASS control panel.

-Work Request 131290 was written to have the bottom of the SCAS panel cleaned and painted.

DUCTWORK ACTION

-Ductwork must be installed to contain miscellaneous wires in the vicinity of the IGE and MCA.

VALVE HV-46705

-Work Request 131295 has been written to trouble shoot the dual position indication on the CRD cooling water supply valve HV-46705.

I l

i g

g s

/

1

,.3 s

I

i e

>o E

4 4

W go so l

l 1

l t

i i

90 t

e i a h

W i

k o _ _ _ _.o U

i i

D O

i i

LIJ l

l Z

.a O-D "4

I E

l

'7

="

l lE l

t.o ?.."6 E

l o.a i

,M j

O l

1 I

<C z

a

! Q.

D ag l

6

,.g 7

E E

o r l, eg-a e

o 1l h C<E E

1 i

8

  • a o

M e o_

e W

M, O

M W N

E E

  1. a e

E g

g

..I Q

. E

.. e Ei E !

t !E E

3 s

>z

>. E E

wa w

E W

w o w

w a-o 3.o g

a5 a 3 o

. - _ - _ _ _ _ _ _