Forwards,For info,bi-weekly Update of Working Copy Status Rept of 870427 post-accident Sampling Sys Mods
ML20215L569
Person / Time
Site: Rancho Seco
Issue date: 05/04/1987
From: Julie Ward
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Cillis M, Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
JEW-87-762, TAC-60632, NUDOCS 8705120288
Download: ML20215L569 (6)


Text

m -

a- ,. *

$SMUD SACRAMENTO MUNICIPAL UTIUTY DISTRICT C P. O. Box 15830, Sacramento CA 95852-1830,(916) 452-3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA MAY t-4 1987 JEW 87-762 F;

_~_

'l -1 J. B. Martin Administrator di U. S. Nuclear Regulatory Commission :5 _,

Region V n L;

Office of Inspection and Enforcement t?

1450 Maria Lane Suite 210 c Walnut Creek CA 94596 "'

Docket 50-312 Rancho Seco Nuclear Generating Station Unit #1 PASS STATUS REPORT Attention: Mike Cillis

Dear Mr. Martin:

Attached is the bi-weekly update of a working copy status report of the PASS modifications dated 4/27/87 for your information. This report has been provided to the Resident Inspector's Office.

Should you have any questions, please contact Bob Fraser at extension 4364 or Masa Nakao at extension 3905.

Sincerely, E. Ward Deputy General Manager, Nuclear Attachments

. cc: George Kalman, NRG - Bethesda (w/atchs) "

l A. D'Angelo, NRC - Rancho Seco 8705120288 870504 PDR ADOCK 05000312 P PDR s\

DISTRICT HEADQUARTERS O 6201 S Street, Sacramento CA 95817-1899 ,

4/27/87 Page 1 of 5 PASS STATUS REPORT PASS ECNs A-5773 ADD RADIATION MONITOR AND RELOCATE IGE

-MEL sheet revisions in progress for R-15713.

-WR 127101 is closed. l

-WR 116995 (Rad Mon R-15713 loop check) is in the closure process.

ACTION -Tech Spec required testing of Rad Mon R-15713 will be incorporated into existing SPs for the weekly

" CHECK" and monthly " TEST". A new SP (SP 1107) will l be created for the quarterly " CALIBRATION" (Ref Tech Spec Table 4.1-1, item 44a).

-FPR required to revise drawing M-575 Sheet 1 to l change RI-15713 to R-15713. l

-No drawing change required. Action item deleted.l A-5735 ADD PASS ION CHROMATOGRAPH ACTION -QC has inspected and signed off. Paperwork closure required. (In progress) (WR 128497)

ACTION -Table top chart recorder has been received but requires minor modifications for use with the IC.

DCN changes will be required. (In progress) i ACTION -Functional testing required. (In progress) 4 -Run solution through the lines to trace them.

-Prepare solutions and flush (regenerate) the columns.

-Verify operation of the solenoid valves.

-Introduce standards and verify accuracies.

-STP 430 (DHS Sample Test) must be performed before this ECN can be turned over to Operations.

A-4711I INSTALL BACKUP SOURCE OF FLUSH AND COOLING WATER

-Release is tied to the performance of STP 433.

R-0285 DHS SAMPLE VALVE REPLACEMENTS

-Replaces valves HV-26000, HV-26003 and HV-26004.

-Construction is in progress.

R-0317 RELOCATE GRAB SAMPLE CONNECTIONS

-MEL sheets are complete.

-Release pending replacement of broken manometer.

-New manometer received (PR 10067). l Installation pending. l

-Drawing change done to build a cover for the manometer. WR 131276 written to build the cover.

-Work is in progress to build the cover.  ;

g '

Page 2 of 5.

R-0361 ADD CHECK VALVES TO DHS SAMPLE LINES

-MEL sheets are complete.

-Release is pending and in-service leak check of valves RSS711 and RSS712 with the RCS in hot shut down. Will be done in conjunction with STP 433. This is to check for thru-valve leakage.

R-0424 FLUSH / DILUTION WATER DEMINERALIZER ACTION -Need to replace Conductivity Indicator CI-49601 with a model having the correct range.

-Work request initiated to repair the leak on the output of Filter F-496.

R-0488 HYDROGEN ANALYZER / PASS SAMPLE LINE HEAT TRACING CHANGES

-Release is tied performance of STP-793.

AC'l' ION -Revise Process Standards (AP.100) to incorporate instrument set points.

-Engineering Action Request (EAR) IC87-012 initiated with a due date of 5/1/87.

-This item is pending calculations for the 'l acceptance criteria of STP-793 which is in l progress. l ACTION -Revise procedure A.52 step 4.1.10.4.4 to specify the calibrated setting and not specifically 285 deg.F since they are not all set at 285. Also add a reference to the appropriate section of Process Standards.

R-0559 SCAS PANEL MODIFICATION

-Release is tied to performance of STP 433.

ACTION -Manuals require update. (In progress)

-N27.01-IM01

-N27.01-IM02

-N27.02-IM01

-N27.08-6 (May not require update)

-FPR #1 written to replace 4 SIMPSON meters with NEWPORT meters. (Drawing Change Notice in progress)

-Purchase request (PR 10359) issued for the new meters.

-FPR #2 initiated to add "T" fittings for adding water-to calibrate the level probes in V716 and V717.

-FPR #2 approved. WR 131289 written to install l the fittings. l ACTION -The SCAS panel needs internal lighting installed.

-Field Problem Report (FPR) required.

ACTION -Revise Process Standards (AP.100) to incorporate instrument set points.

-Engineering Action Request (EAR) IC87-042 initiated with a due date of 6/1/87.

.. 1 f,

. Page 3 of 5 R-0732 BACKUP LAB FOR PASS GRAB SAMPLES

-Chemistry has submitted recommendations to Nuclear l Engineering to revise the Design Basis Report and l Safety Analysis. l

-Engineering Action Request (EAR) SY87-045 initiated to make the revisions.

' PASS STPs 426 SAMPLING TIMES USING THE PASS

-Test Outline approved.

-The procedure has been reviewed by the Test Working Group (TWG). TWG approval is pending approval of AP.313-1 (PASS Operating Procedure) revision 1.

-STP-426 records the sampling times during the performance of AP.313-1.

-Revision of AP,313-1 is pending additional  !

functional testing of the PASS. l 428 MEASURE VOLUMES A & B

-Test complete.

-Closure pending final review by Test Review Group (TRG).

429 MEASURE VOLUMES S & T

-Test complete.

-Closure pending final review by TRG.

430 DHS SAMPLE TEST

-The Test Outline was approved with comment by the TRG on 4/9/87.

-Acceptance criteria for flushing being addressed to resolve TRG comment. EAR SY87-044 initiated.

-The procedure was reviewed by the TWG and their l comments have been encorporated. Furthur review is l on hold pending final approval of the Test Outline. l 431 SYSTEM FLUSH

-Test results are with Bob Fraser for processing.

-NCR S-5309 Rev. O closure pending final signoff of STP-431.

432 GASEOUS SAMPLE TEST

-The Test Outline and procedure are approve. l

-Calibrated gas has been moved to the environmental lab for testing to establish base line data.

-WR 131280 initiated to install test "Ts" for collecting gas samples.

-Procedure performance is pending receipt of syringes for collecting gas samples during the test. (On order - PR 10097)

~

[ .

  • Page 4 of 5 433 RCS SAMPLE TEST

-The Test Outline is approved.

-The procedure is scheduled to be submitted to the l TWG by 4/29/87. l 793 HEAT TRACING

-The Test Outline was reviewed by the TRG on 4/9/87.

Comments to be incorporated.

-Outline approval is pending calculations being l generated by the Design Engineer for acceptance  !

criteria. Completion of the calculations due  !

approximately 5/1/87. l

-The procedure was reviewed by the TWG and their l comments are being incorporated. l PASS SPs 907 MONTHLY FUNCTION TEST OF PASS

-Drafting of Test Outline and Procedure pending revision 1 to Operating Procedure AP.313-1.

-A draft of the SP exists based on Revision 0 of AP.313-1.

-Must include the monthly " TEST" of Rad Monitor R-15713 per Tech Specs, Table 4.1-1, item 44a.

-A new SP will be generated to perform the quarterly " CALIBRATION" and the weekly " CHECK" will be inserted into an existing SP.

PASS APs 313-1 EMERGENCY SAMPLING USING THE PASS ACTION -Revision 0 approved 2/26/86. Revision 1 is drafted.

Revision 1 review and approval is pending system functional testing to verify the procedure.

313-1A UNDILUTED GRAB SAMPLE FROM PASS FOR OFFSITE ANALYSIS

-Revision 0 approved 2/26/86.

313-1B DILUTED GRAB SAMPLE FROM PASS FOR ONSITE ANALYSIS

-Revision 0 approved 2/26/86.

313-1D HANDLING AND LOADING OF NUPAC CASK MODEL NUMBER PAS-2 ACTION -Procedure drafted. Word processing required.

-Bob Fraser has the procedure and will take action to get it approved.

MISCELLANEOUS ITEMS DESIGN BASIS REPORT

-The PASS design basis has been issued for the initial review. The System Engineer reviewed the draft and provided comments to the Design Engineer.

Page 5 of 5 TRAINING ACTION -A list of personnel to be trained on PASS needs to be established and a method developed to document and schedule the. training. Coordinate with TRAINING.

-Class room training was conducted on 4/17/87.

All Chemistry Technicians have now received 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of classroom training. Selected Techs will receive hands on training between now and plant heatup.

SPARE PARTS ACTION -A list of required spare parts must be developed and a Purchase Request generated to order them.

PREVENTATIVE MAINTENANCE ACTION -A Preventive Maintenance program must be developed for the appropriate PASS components.

PASS COMMITMENTS ACTION -SMUD commitments to the NRC must be revised to refelect the capabilities of the PASS.

-Licensing has completed a draft of the  !

transmittal and routed it for comment. l PAINTING ACTION -A work request will be written to have the room painted which houses the PASS control panel.

-Work Request 131290 was written to have the bottom l of the SCAS panel. cleaned and painted. l DUCTWORK ACTION -Ductwork must be installed to contain miscellaneous wires in the vicinity of the IGE and MCA.