Letter Sequence Other |
---|
|
Results
Other: 05000312/LER-1986-020, Forwards Rev 3 to Procedure AP.56, Core Damage Assessment, for Inclusion in NRC Review of post-accident Sampling Sys. Procedure Revised to Correct Discrepancy Noted in LER 86-20, ML20137X776, ML20137X795, ML20151Y962, ML20203P855, ML20215C433, ML20215J722, ML20215L385, ML20215L569, ML20235P297
|
MONTHYEARML20137X7951985-11-22022 November 1985 Notice of Deviation from Insp on 850923-27 & 1007-15 Project stage: Other ML20137X7761985-11-22022 November 1985 Notice of Violation from Insp on 850923-27 & 1007-15 Project stage: Other ML20137T5231986-02-0606 February 1986 Forwards Summary of 860116 Meeting Re Lessons Learned from Davis-Besse & Rancho Seco Events Project stage: Request ML20151Y9621986-02-0606 February 1986 Forwards post-accident Sampling Sys (PASS) Design Changes Implemented to Correct Capability Deficiencies.Pass Still Meets Requirements of NUREG-0737,Item II.B.3.Clarification of PASS Design Also Encl,Per 860127 Discussions Project stage: Other ML20141N8801986-03-13013 March 1986 Forwards Addl Info Re Changes to Facility post-accident Sampling Sys,Per 860218 Meeting W/Nrc & 860220 Telcon.Data Re Induced Gamma Radiation & Accuracy of Portions of Sys Affected by Mods Will Be Provided When Available Project stage: Meeting ML20155F3891986-04-11011 April 1986 Documents Commitment Made at 860218 Meeting W/Nrc to Demonstrate Operability of post-accident Sampling Sys Prior to Startup.Scope & Schedule for Test Will Be Provided in Time for NRC Comments to Be Considered Project stage: Meeting ML20203P8551986-04-30030 April 1986 Forwards Summary of Test for Chloride & Boron Analysis Employing Appropriately Diluted Test Matrix of post-accident Sampling Sys Equipment,Per 860313 Commitment.Addl Mods to Improve Sys Reliability & Maintainability Also Encl Project stage: Other ML20235P2971987-03-13013 March 1987 Rev 3 to Procedure AP.56, Core Damage Assessment Project stage: Other ML20215L5691987-05-0404 May 1987 Forwards,For info,bi-weekly Update of Working Copy Status Rept of 870427 post-accident Sampling Sys Mods Project stage: Other ML20215J7221987-05-0404 May 1987 Submits Addl Info Re Mods to post-accident Sampling Sys in Effort to Improve Sys Reliability & Provide Alternate Analyses for Boron,Chlorides & Reactor Bldg Atmosphere Radioisotopes.Criterion 10 of NUREG-0737 Satisfied Project stage: Other ML20215C4331987-06-0202 June 1987 Forwards Biweekly Update of Working Copy Status Rept of PASS Mods .Work Request Initiated to Repair Leak on Output of Filter F-496 (Er 131281) & Mgt Safety Review Committee Review Completed on 870526 Project stage: Other ML20215L3851987-06-16016 June 1987 Forwards 870608 Biweekly Update of Working Copy Status Rept of post-accidental Sampling Sys Mods,For Info Project stage: Other 05000312/LER-1986-020, Forwards Rev 3 to Procedure AP.56, Core Damage Assessment, for Inclusion in NRC Review of post-accident Sampling Sys. Procedure Revised to Correct Discrepancy Noted in LER 86-201987-07-0606 July 1987 Forwards Rev 3 to Procedure AP.56, Core Damage Assessment, for Inclusion in NRC Review of post-accident Sampling Sys. Procedure Revised to Correct Discrepancy Noted in LER 86-20 Project stage: Other 1986-04-30
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8851999-10-0808 October 1999 Informs of Staff Determination That Listed Calculations Should Be Withheld from Public Disclosure,Per 10CFR2.790, as Requested in 990909 Affidavit ML20211J7731999-08-31031 August 1999 Forwards Insp Rept 50-312/99-03 on 990802-06.No Violations Noted.Insp Included Decommissioning & Dismantlement Activities,Verification of Compliance with Selected TS & Review of Completed SEs ML20211H7481999-08-13013 August 1999 Forwards Amend 126 to License DPR-54 & Safety Evaluation. Amend Changes Permanently Defueled Technical Specification (PDTS) D3/4.1, Spent Fuel Pool Level, to Replace Specific Reference to SFP Level Alarm Switches with Generic Ref 3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held ML20210H9541999-07-0707 July 1999 Informs NRC of Change to Rancho Seco Decommissioning Schedule,As Described in Licensee Post Shutdown Decommissioning Activities Rept ML20209D2501999-06-24024 June 1999 Informs That Util Has Revised All Sections of Rancho Seco Emergency Plan (Rsep),Change 4,effective 990624 ML20196G0431999-06-22022 June 1999 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Smud Rancho Seco Nuclear Generating Station ML20195D1851999-05-27027 May 1999 Forwards Rancho Seco Annual Rept, IAW Plant Permanently Defueled TS D6.9.4 & D6.9.6b.Rept Contains Shutdown Statistics,Narrative Summary of Shutdown Experience,Er Info & Tabulation of Facility Changes,Tests & Experiments ML20195B8511999-05-27027 May 1999 Forwards Change 4 to Rancho Seco Emergency Plan, Incorporating Commitments Made to NRC as Outlined in NRC .Emergency Plan Includes Two Listed Supporting Documents ML20207E9181999-05-27027 May 1999 Informs That Effective 990328,NRR Underwent Reorganization. within Framework of Reorganization,Div of Licensing Project Mgt Created.Reorganization Chart Encl ML20206U7411999-05-18018 May 1999 Provides Summary of 990217-18 Visit to Rancho Seco Facility to Become Familar with Facility,Including Onsite ISFSI & Meeting with Representatives of Smud to Discuss Issues Re Revised Rancho Seco Ep,Submitted to NRC on 960429 ML20206M1611999-05-10010 May 1999 Forwards Listed Proprietary Calculations to Support Review of Rancho Seco ISFSI Sar.Proprietary Encls Withheld ML20206E8591999-04-12012 April 1999 Provides Info Re High Total Coliform Result in Plant Domestic Sewage Effluent Prior to Confluence with Combined Effluent.Cause of High Total Coliform Result Was Broken Flow Rate Instrument.Instrument Was Repaired on 990318 ML20204H6751999-03-19019 March 1999 Forwards Insp Rept 50-312/99-02 on 990309-11.No Violations Noted.Portions of Physical Security & Access Authorization Programs Were Inspected ML20204E4031999-03-16016 March 1999 Submits Rept of Status of Decommissioning Funding for Rancho Seco,As Required by 10CFR50.75(f)(1).Plant Is Currently in Safstor, with Operating License Scheduled to Expire in Oct 2008 ML20204E6661999-03-11011 March 1999 Forwards Rancho Seco Exposure Rept for Individuals That Received Greater than 100 Mrem During 1998,IAW TS D6.9.2.2 & NRC Regulatory Guide 1.16 ML20204E6441999-03-11011 March 1999 Forwards Individual Monitoring Repts for Personnel That Required Radiation Exposure Monitoring During 1998 ML20207L1711999-03-10010 March 1999 Informs of Staff Determination That Supporting Calculations & Drawings Contained in Rev 2 of Sar, Should Be Withheld from Public Disclosure,Per 10CFR2.790 NL-99-002, Submits Info About Property Insurance for Rancho Seco Nuclear Generating Station,Iaw 10CFR50.54(w)(3)1999-03-10010 March 1999 Submits Info About Property Insurance for Rancho Seco Nuclear Generating Station,Iaw 10CFR50.54(w)(3) ML20207D4431999-03-0101 March 1999 Forwards Annual Radioactive Effluent Release Rept, for Rancho Seco Nuclear Generating Station for 1998 ML20207H6181999-02-18018 February 1999 Provides Attached Metrix & Two Copies of Rancho Seco ISFSI Sar,Rev 2 on Compact Disc,As Requested in 990209 Meeting. First Rounds of RAIs Dealt Primarily with Use of Cask as Storage Cask.Without Compact Disc ML20203D0761999-02-10010 February 1999 Ltr Contract:Task Order 37 Entitled, Technical Assistance in Review of New Safety Analysis Rept for Rancho Seco Spent Fuel Storage Facility, Under Contract NRC-02-95-003 ML20155D4431998-10-27027 October 1998 Forwards Amend 3 to Rancho Seco Dsar,Representing Updated Licensing Basis for Operation of Permanently Shutdown & Defueled Rancho Seco Nuclear Facility During Permanently Defueled Mode.With Instructions & List of Effective Pages NL-98-032, Forwards Certified Copies of Listed Nuclear Liability Endorsements for Util1998-09-30030 September 1998 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Util ML20237A6031998-08-0707 August 1998 Forwards Insp Rept 50-312/98-03 on 980706-09.No Violations Noted ML20237A9481998-08-0303 August 1998 Forwards Smud 1997 Annual Rept, IAW 10CFR50.71(b),which Includes Certified Financial Statements ML20236Q9461998-07-15015 July 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-312/98-02 ML20236J6331998-06-30030 June 1998 Forwards Response to Violations Noted in Insp Rept 50-312/98-02.Corrective Actions:Util Revised RSAP-1003 to Clarify District Security Staff Responsibilities Re Handling & Review of Criminal History Info ML20236E8211998-06-0303 June 1998 Forwards Insp Rept 50-312/98-02 on 980519-21 & NOV Re Failure to Review & Consider All Info Obtained During Background Investigation.Areas Examined During Insp Also Included Portions of Physical Security Program ML20217G8391998-04-20020 April 1998 Forwards Copy of Rancho Seco Monthly Discharger Self-Monitoring Rept for Mar 1998 IR 05000312/19980011998-03-25025 March 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-312/98-01 on 980205 ML20217F1891998-03-18018 March 1998 Forwards Signed Original & Amend 7 to Rancho Seco Long Term Defueled Condition Physical Security Plan & Rev 4 to Long Term Defueled Condition Training & Qualification Plan.Encls Withheld,Per 10CFR2.790 ML20217G6661998-03-18018 March 1998 Forwards Discharge Self Monitoring Rept for Feb 1998, Which Makes Note of One Wastewater Discharge Permit Violation ML20217H0451998-03-18018 March 1998 Submits Rancho Seco Exposure Rept for Individuals Receiving Greater than 100 Mrem During 1997,per TS D6.9.2.2 & Guidance Contained in Reg Guide 1.16.No One Exposed to Greater than 100 Mrem in 1997 ML20216K1091998-03-11011 March 1998 Forwards NRC Form 5 Individual Monitoring Repts for Personnel Who Required Radiation Exposure Monitoring,Per 10CFR20.1502 During 1997.W/o Encl ML20217N9531998-03-0505 March 1998 Responds to Violations Noted in Insp Rept 50-312/98-01. Corrective Actions:Radiation Protection Group Wrote Potential Deviation from Quality (Pdq) 97-0082 & Assigned Radiation Protection Action to Determine Cause & CAs ML20203H7001998-02-25025 February 1998 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1997, IAW 10CFR50.36a(a)(2) & TS D6.9.3.Revs to Radiological Environ Monitoring Manual & off-site Dose Calculation Manual,Encl ML20202G0131998-02-12012 February 1998 Forwards Certified Copies of Listed Nuclear Liability Endorsements & Master Worker Policy Certificate of Insurace for Facility NL-98-006, Submits Annual Rept of Property Insurance Levels for Rsngs, IAW 10CFR50.54(w)(3)1998-02-12012 February 1998 Submits Annual Rept of Property Insurance Levels for Rsngs, IAW 10CFR50.54(w)(3) ML20202C4641998-02-0505 February 1998 Forwards Insp Rept 50-312/98-01 on 980105-08 & Notice of Violation.Insp Included Decommissioning & Dismantlement Work Underway,Verification of Compliance W/Selected TS & Main & Surveillance Activities Associated W/Sfp ML20199A5881997-11-10010 November 1997 Responds to NRC Re Violations Noted in Insp Rept 50-312/97-01.Corrective Actions:Reviewed SFP Water Temp & Instrument Calibr Records,Generated Otr 97-001 to Document out-of-tolerance Instrument & Generated Pdq 97-0064 ML20198R9501997-11-0505 November 1997 Requests Interpretation of or Rev to NUREG-1536, Std Review Plan for Dry Cask Storage Sys, Re Compliance W/ 10CFR72.236(e) & 10CFR72.122(h)(4) for Dry Fuel Storage Casks ML20198K5391997-10-21021 October 1997 Forwards Insp Rept 50-312/97-04 on 970922-25 & Notice of Violation.Response Required & Will Be Used to Determine If Further Action Will Be Necessary ML20217D3101997-09-25025 September 1997 Forwards Update of 1995 Decommissioning Evaluation, for Rancho Seco Nuclear Generation Station & Annual Review of Nuclear Decommissioning Trust Fund for Adequacy Re Assumptions for Inflation & Rate of Return ML20211F0991997-09-23023 September 1997 Forwards One Certified Copy of Mutual Atomic Energy Liability Underwriters Nuclear Energy Liability Insurance Endorsement 120 for Policy MF-0075 for Smud Rancho Seco Nuclear Facility ML20198G8141997-08-22022 August 1997 Forwards Amend 125 to License DPR-54 & Safety Evaluation. Amend Permits Smud to Change TS to Incorporate Revised 10CFR20.Amend Also Revises References from NRC Region V to NRC Region IV ML20151L0281997-07-29029 July 1997 Provides Response to NRC Request for Addl Info Re TS Change,Relocating Administrative Controls Related to QA to Ufsar,Per NUREG-0737 ML20149E5031997-07-10010 July 1997 Second Partial Response to FOIA Request for Documents. Forwards Records Listed in App C Being Made Available in Pdr.Records in App D Already Available in PDR ML20148P5161997-06-30030 June 1997 Second Partial Response to FOIA Request for Documents.App B Records Being Made Available in PDR ML20141A1721997-06-17017 June 1997 Forwards Insp Rept 50-312/97-03 on 970603-05.No Violations Noted.Areas Examined During Insp Included Portions of Physical Security Program 1999-08-31
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held ML20210H9541999-07-0707 July 1999 Informs NRC of Change to Rancho Seco Decommissioning Schedule,As Described in Licensee Post Shutdown Decommissioning Activities Rept ML20209D2501999-06-24024 June 1999 Informs That Util Has Revised All Sections of Rancho Seco Emergency Plan (Rsep),Change 4,effective 990624 ML20196G0431999-06-22022 June 1999 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Smud Rancho Seco Nuclear Generating Station ML20195B8511999-05-27027 May 1999 Forwards Change 4 to Rancho Seco Emergency Plan, Incorporating Commitments Made to NRC as Outlined in NRC .Emergency Plan Includes Two Listed Supporting Documents ML20195D1851999-05-27027 May 1999 Forwards Rancho Seco Annual Rept, IAW Plant Permanently Defueled TS D6.9.4 & D6.9.6b.Rept Contains Shutdown Statistics,Narrative Summary of Shutdown Experience,Er Info & Tabulation of Facility Changes,Tests & Experiments ML20206M1611999-05-10010 May 1999 Forwards Listed Proprietary Calculations to Support Review of Rancho Seco ISFSI Sar.Proprietary Encls Withheld ML20206E8591999-04-12012 April 1999 Provides Info Re High Total Coliform Result in Plant Domestic Sewage Effluent Prior to Confluence with Combined Effluent.Cause of High Total Coliform Result Was Broken Flow Rate Instrument.Instrument Was Repaired on 990318 ML20204E4031999-03-16016 March 1999 Submits Rept of Status of Decommissioning Funding for Rancho Seco,As Required by 10CFR50.75(f)(1).Plant Is Currently in Safstor, with Operating License Scheduled to Expire in Oct 2008 ML20204E6441999-03-11011 March 1999 Forwards Individual Monitoring Repts for Personnel That Required Radiation Exposure Monitoring During 1998 ML20204E6661999-03-11011 March 1999 Forwards Rancho Seco Exposure Rept for Individuals That Received Greater than 100 Mrem During 1998,IAW TS D6.9.2.2 & NRC Regulatory Guide 1.16 NL-99-002, Submits Info About Property Insurance for Rancho Seco Nuclear Generating Station,Iaw 10CFR50.54(w)(3)1999-03-10010 March 1999 Submits Info About Property Insurance for Rancho Seco Nuclear Generating Station,Iaw 10CFR50.54(w)(3) ML20207D4431999-03-0101 March 1999 Forwards Annual Radioactive Effluent Release Rept, for Rancho Seco Nuclear Generating Station for 1998 ML20207H6181999-02-18018 February 1999 Provides Attached Metrix & Two Copies of Rancho Seco ISFSI Sar,Rev 2 on Compact Disc,As Requested in 990209 Meeting. First Rounds of RAIs Dealt Primarily with Use of Cask as Storage Cask.Without Compact Disc ML20155D4431998-10-27027 October 1998 Forwards Amend 3 to Rancho Seco Dsar,Representing Updated Licensing Basis for Operation of Permanently Shutdown & Defueled Rancho Seco Nuclear Facility During Permanently Defueled Mode.With Instructions & List of Effective Pages NL-98-032, Forwards Certified Copies of Listed Nuclear Liability Endorsements for Util1998-09-30030 September 1998 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Util ML20237A9481998-08-0303 August 1998 Forwards Smud 1997 Annual Rept, IAW 10CFR50.71(b),which Includes Certified Financial Statements ML20236J6331998-06-30030 June 1998 Forwards Response to Violations Noted in Insp Rept 50-312/98-02.Corrective Actions:Util Revised RSAP-1003 to Clarify District Security Staff Responsibilities Re Handling & Review of Criminal History Info ML20217G8391998-04-20020 April 1998 Forwards Copy of Rancho Seco Monthly Discharger Self-Monitoring Rept for Mar 1998 ML20217H0451998-03-18018 March 1998 Submits Rancho Seco Exposure Rept for Individuals Receiving Greater than 100 Mrem During 1997,per TS D6.9.2.2 & Guidance Contained in Reg Guide 1.16.No One Exposed to Greater than 100 Mrem in 1997 ML20217F1891998-03-18018 March 1998 Forwards Signed Original & Amend 7 to Rancho Seco Long Term Defueled Condition Physical Security Plan & Rev 4 to Long Term Defueled Condition Training & Qualification Plan.Encls Withheld,Per 10CFR2.790 ML20217G6661998-03-18018 March 1998 Forwards Discharge Self Monitoring Rept for Feb 1998, Which Makes Note of One Wastewater Discharge Permit Violation ML20216K1091998-03-11011 March 1998 Forwards NRC Form 5 Individual Monitoring Repts for Personnel Who Required Radiation Exposure Monitoring,Per 10CFR20.1502 During 1997.W/o Encl ML20217N9531998-03-0505 March 1998 Responds to Violations Noted in Insp Rept 50-312/98-01. Corrective Actions:Radiation Protection Group Wrote Potential Deviation from Quality (Pdq) 97-0082 & Assigned Radiation Protection Action to Determine Cause & CAs ML20203H7001998-02-25025 February 1998 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1997, IAW 10CFR50.36a(a)(2) & TS D6.9.3.Revs to Radiological Environ Monitoring Manual & off-site Dose Calculation Manual,Encl NL-98-006, Submits Annual Rept of Property Insurance Levels for Rsngs, IAW 10CFR50.54(w)(3)1998-02-12012 February 1998 Submits Annual Rept of Property Insurance Levels for Rsngs, IAW 10CFR50.54(w)(3) ML20202G0131998-02-12012 February 1998 Forwards Certified Copies of Listed Nuclear Liability Endorsements & Master Worker Policy Certificate of Insurace for Facility ML20199A5881997-11-10010 November 1997 Responds to NRC Re Violations Noted in Insp Rept 50-312/97-01.Corrective Actions:Reviewed SFP Water Temp & Instrument Calibr Records,Generated Otr 97-001 to Document out-of-tolerance Instrument & Generated Pdq 97-0064 ML20198R9501997-11-0505 November 1997 Requests Interpretation of or Rev to NUREG-1536, Std Review Plan for Dry Cask Storage Sys, Re Compliance W/ 10CFR72.236(e) & 10CFR72.122(h)(4) for Dry Fuel Storage Casks ML20217D3101997-09-25025 September 1997 Forwards Update of 1995 Decommissioning Evaluation, for Rancho Seco Nuclear Generation Station & Annual Review of Nuclear Decommissioning Trust Fund for Adequacy Re Assumptions for Inflation & Rate of Return ML20211F0991997-09-23023 September 1997 Forwards One Certified Copy of Mutual Atomic Energy Liability Underwriters Nuclear Energy Liability Insurance Endorsement 120 for Policy MF-0075 for Smud Rancho Seco Nuclear Facility ML20151L0281997-07-29029 July 1997 Provides Response to NRC Request for Addl Info Re TS Change,Relocating Administrative Controls Related to QA to Ufsar,Per NUREG-0737 NL-97-030, Forwards Endorsement 132 to Nelia Policy NF-0212 & Endorsement 118 to Maelu Policy MF-0075 for Smuds Rsngs1997-05-13013 May 1997 Forwards Endorsement 132 to Nelia Policy NF-0212 & Endorsement 118 to Maelu Policy MF-0075 for Smuds Rsngs ML20138F5321997-04-28028 April 1997 Forwards Response to RAI Re License Amend 192,updating Cask Drop Design Basis Analysis,Per NRC 960510 Request for Addl Info on 960318 Application NL-97-027, Forwards Certified Copies of Listed Nuclear Liability Endorsements for Utility1997-04-17017 April 1997 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Utility ML20137W8091997-03-20020 March 1997 Forwards Biennial Update to Rancho Seco Post-Shutdown Decommissioning Activities Rept ML20137S3571997-03-19019 March 1997 Provides Notification of Use of Revised Quality Manual for Activities Re Rancho Seco ISFSI ML20137D0981997-03-18018 March 1997 Submits Rancho Seco Exposure Rept for Individuals Receiving Greater than 100 Mrem During 1996.Provided IAW TS D6.9.2.2 & Guidance Contained in NRC Reg Guide 1.16.No One Exposed to Greater than 100 Mrem in 1996 ML20137D1221997-03-18018 March 1997 Submits,Iaw 10CFR20.2206 & TS D6.9.2.1,1996 NRC Form 5 Individual Monitoring Repts for Personnel Requiring Radiation Exposure Monitoring Per 10CFR20.1502 During 1996. W/O Encl NL-97-012, Submits Rept of Listed Current Levels of Property Insurance for Plant,Iaw 10CFR50.54(w)(3)1997-02-11011 February 1997 Submits Rept of Listed Current Levels of Property Insurance for Plant,Iaw 10CFR50.54(w)(3) ML20138L1091997-01-29029 January 1997 Informs of Schedule Change Re Decommissioning of Rancho Seco.Incremental Decommissioning Action Plan,Encl NL-97-005, Forwards Certified Copies of Listed Nuclear Liability Endorsements for Utility1997-01-22022 January 1997 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Utility NL-96-056, Forwards Certified Copies of Listed Nuclear Liability Endorsements for Util1996-12-16016 December 1996 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Util ML20134E0041996-10-23023 October 1996 Forwards Response to NRC GL 96-04, Boraflex Degradation in Spent Fuel Pool Storage Racks ML18102B6871996-08-0606 August 1996 Informs That Util Will Revise Loading & Unloading Procedures & Operator Training as Necessary ML20149E4491994-05-16016 May 1994 Forwards 1993 Annual Rept of Sacramento Municipal Utility District,For Info ML20149E3971994-05-10010 May 1994 Forwards Re Updated Decommissioning Cost Estimate for Rancho Seco & Attached Rept by Tlg Engineering,Inc. W/Svc List ML20059H6731994-01-20020 January 1994 Forwards Revised Rancho Seco Quality Manual, Reflecting Current Rancho Seco Pol Phase Nuclear Organization Changes ML20059E1221994-01-0303 January 1994 Forwards Amend 7 to Long Term Defueled Condition Physical Security Plan.Encl Withheld (Ref 10CFR73) ML20059C1681993-12-22022 December 1993 Forwards Suppl Info to Support Review & Approval of 930514 Proposed License Amend 186 Re Nuclear Organization Changes, Per NRC Request 1999-07-07
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059L5431990-09-20020 September 1990 Requests Exemptions from Certain Requirements of 10CFR50.47(b) & 50,App E & Proposes New Emergency Plan That Specifically Applies to Long Term Defueled Condition ML20059J9161990-09-13013 September 1990 Notification of Change in Operator/Senior Operator Status for R Groehler,Effective 900907 ML20059J9221990-09-13013 September 1990 Responds to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2,Part 2, 'Vendor Interface for Safety-Related Components.' No Vendor Interface Exists for Spent Fuel Pool Liner NL-90-442, Forwards Endorsements 13 to Nelia Certificate N-49 & Maelu Certificate M-49,Endorsements 91 & 92 to Maelu Policy MF-75 & Endorsements 103 & 104 to Nelia Policy NF-2121990-09-12012 September 1990 Forwards Endorsements 13 to Nelia Certificate N-49 & Maelu Certificate M-49,Endorsements 91 & 92 to Maelu Policy MF-75 & Endorsements 103 & 104 to Nelia Policy NF-212 ML20059G0791990-09-0606 September 1990 Forwards Supplemental Fitness for Duty Performance Data, Omitted from 900725 Rept Re Random Drug Testing Results ML20059E0031990-08-30030 August 1990 Forwards Semiannual Radioactive Effluent Release Rept,Jan- June 1990, Corrected Repts & Revs to ODCM ML20059C2491990-08-27027 August 1990 Advises That M Foster & B Rausch Leaving Util Effective on 900810 & 17,respectively & Will No Longer Require Active Operator Licenses ML20056B2591990-08-20020 August 1990 Forwards Long-Term Defueled Condition Security Training & Qualification Plan. Encl Withheld (Ref 10CFR2.790) ML20056B2961990-08-10010 August 1990 Discusses 900731 Meeting Re Future of Util & Closure & Decommissioning of Facility.Request for Possession Only License Pending Before Commission ML20058Q2811990-08-0909 August 1990 Forwards Updated Listing of Commitments & long-range Scope List Items Deferred or Closed by Commitment Mgt Review Group Since Last Update ML20058N0911990-08-0707 August 1990 Notifies of Minor Change in List of Tech Specs Applicable in Plant Defueled Condition.Determined That Surveillance Requirements Table 4.1-1,Item 63 Not Required to Be Included in List of Tech Specs Applicable in Defueled Condition ML20056A1131990-07-30030 July 1990 Apprises of Status of Plans to Use 3 of 4 Emergency Diesel Generators as Peaking Power Supplies & Responds to Questions in .Util Obtained Authorization for Operation of Diesel Generators for No More than 90 Days Per Yr ML20056A2041990-07-30030 July 1990 Provides Response to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. Pressure & Differential Pressure Transmitters 1153 & 1154 Do Not Perform Any safety-related Function in Current Plant Mode ML20055J0311990-07-25025 July 1990 Forwards fitness-for-duty Performance Data for Facility from 900103-0630 ML20055J0331990-07-25025 July 1990 Notifies of Change in Operator/Senior Operator Status. Operators Terminating Employment & No Longer Require License ML20055H8081990-07-24024 July 1990 Forwards Decommissioning Financial Plan for Plant,Per 10CFR50.33(k)(2) & Requests Interim Exemption Re Requirement to Have Full Decommissioning Funding at Time of Termination of Operation,Per 10CFR50.12 ML20055H7561990-07-24024 July 1990 Requests Exemption from Performing Annual Exercise of Emergency Plan,Activation of Alert & Notification Sys & Distribution of Public Info Brochures,Per 10CFR50.12 Requirements ML20055F8421990-07-13013 July 1990 Forwards Application for Proposed Decommissioning of Plant. Util Needs Relief from Equipment Maint,Surveillance,Staffing & Other Requirements Not Necessary to Protect Public Health & Safety During Defueled Condition ML20055G9821990-07-12012 July 1990 Advises That Environ Exposure Controls Action Plan Will Be Provided by Sept 1990,per Insp Rept 50-312/90-02 ML20055E5111990-07-0606 July 1990 Notifies of Change in Operator/Senior Operator Status for D Rosenbaum & M Cooper,Effective 900622 & 29,respectively ML20055C3541990-02-14014 February 1990 Forwards Updated Response to Insp Rept 50-312/88-30. Calculations for Liquid Effluent Monitors Completed & in Use & Rev to Reg Guide 4.15 in Procedure RSAP-1702 Scheduled to Be Completed & Implemented by Apr 1990 ML20055C3511990-02-14014 February 1990 Forwards Addl Info Re 900306 Response to NRC Bulletin 88-003, Inadequate Latch Engagement in Hfa Type Latching Relays Mfg by Ge. Util Will Replace Only Relays Found Not to Meet Insp Criteria ML20248H2571989-10-0606 October 1989 Responds to NRC Re Addendum to Safety Evaluation Supporting Amend 92 to License DPR-54 Re Reactor Vessel Vent Valve Testing.No Testing of Reactor Vessel Vent Valves Will Be Performed ML20248H2391989-10-0606 October 1989 Requests Exemption from Requirements of 10CFR26 Re Fitness for Duty Programs Based on Present & Future Operational Configuration ML20248A8271989-09-25025 September 1989 Requests Permission to Submit Next Amend to Updated FSAR W/Decommissioning Plan Submittal.Extension Will Allow District to Incorporate Plant Closure Status in SAR Update to Reflect Plant Conditions Accurately ML20248D4611989-09-13013 September 1989 Responds to 890906 Request for Assessment of Util Compliance W/Ol & Associated Programs & Commitments,Per 10CFR50.54(f). Staffing Requirements for Emergency Preparedness Will Not Be Violated & Future Shortfalls Will Be Remedied ML20247G1991989-09-11011 September 1989 Requests Extension for Time Period Equivalent to That of Current Shutdown.Extension Would Result in Revised Final Expiration Date of Not Earlier than 900318.Plant Would Not Be Brought Above Cold Shutdown W/O NRC Prior Concurrence ML20247H3551989-09-0707 September 1989 Informs That Util Stands by Commitments of 890621 & 0829 Re Implementation of Closure Plan in Safe & Deliberate Manner in Compliance W/License & W/All Applicable Laws & Regulations ML20247H5541989-09-0101 September 1989 Responds to Violations Noted in Insp Rept 50-312/89-14. Corrective Actions:Stop Order on Fuel Movement Issued & Action Plan Generated on 890908 to Address Broader Issues 05000312/LER-1988-010, Forwards Rev 1 to LER 88-010,due to Change in Commitment Date for re-evaluating Fire Zones.Date Changed to 901001. Zones re-evaluated in Conjunction W/Mods to Fire Detection Annunciator Sys1989-08-23023 August 1989 Forwards Rev 1 to LER 88-010,due to Change in Commitment Date for re-evaluating Fire Zones.Date Changed to 901001. Zones re-evaluated in Conjunction W/Mods to Fire Detection Annunciator Sys ML20246A4011989-08-16016 August 1989 Forwards Rev 5 to Inservice Testing Program Plan. Changes Identified Consistent W/Guidance Provided by Generic Ltr 89-04 NL-89-593, Forwards Plant Closure Organizational Charts & Administrative Procedure RSAP-0101,per 890802 Request1989-08-15015 August 1989 Forwards Plant Closure Organizational Charts & Administrative Procedure RSAP-0101,per 890802 Request ML20245H4781989-08-10010 August 1989 Requests Exemption from Generic Ltr 89-07, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs Because on 890607,util Board of Directors Ordered That Plant Cease Operation ML20245H1781989-08-0909 August 1989 Notifies of Change in Operator/Senior Operator Status. J Dailey & J Reynolds Terminated Employment on 890721 & 890802,respectively ML20245L1831989-08-0808 August 1989 Informs That Official Correspondence Must Be Directed to Listed Individuals Due to Reorganization of Util Following 890606 Election ML20247L9221989-07-26026 July 1989 Provides Revised Response to NRC Re Violations Noted in Insp Rept 50-312/88-33.Corrective Action:Portable Shield Walls Inspected Every 6 Months to Ensure All Safety Factors Met & Area Surveys Conducted on Weekly Basis ML20247M4121989-07-24024 July 1989 Requests Exemption from 10CFR50,App E,Section IV.F.2 to Allow Util Not to Perform Annual Emergency Plan Exercise for 1989.Request Results from Transitional Mode of Plant from Operating Plant to Plant Preparing for Decommissioning NL-89-541, Requests That Completion Date for Addl Training of Personnel Involved in Performing Work on Environ Qualified Equipment Be Extended from 890616 to 8912151989-07-14014 July 1989 Requests That Completion Date for Addl Training of Personnel Involved in Performing Work on Environ Qualified Equipment Be Extended from 890616 to 891215 ML20246P4011989-07-14014 July 1989 Informs That Evaluation of Contracts & Agreements Identified No Restrictions on Employee Ability to Provide Info About Potential Safety Issues to NRC NL-89-547, Forwards Amend 110 to License DPR-54,issued on 890609, Identifying Discrepancy in Tech Spec Page X (Table of Contents) Which Does Not Reflect Changes Approved in Amend 1061989-07-0606 July 1989 Forwards Amend 110 to License DPR-54,issued on 890609, Identifying Discrepancy in Tech Spec Page X (Table of Contents) Which Does Not Reflect Changes Approved in Amend 106 ML20246A9751989-06-30030 June 1989 Advises That Concerns Addressed in Generic Ltr 89-08 Inapplicable,Since Util Intends to Defuel Reactor.Generic Ltr Will Be Reviewed Prior to Placing Facility in heatup-cooldown Operational Mode for Return to Power ML20246A5171989-06-30030 June 1989 Forwards Rancho Seco Closure Plan, Per 890621 Request for Addl Info Re Plan CEO-89-289, Notifies of Change in Operator/Senior Operator Status.Listed Operator/Senior Operator Terminated Employment on Listed Effective Date1989-06-27027 June 1989 Notifies of Change in Operator/Senior Operator Status.Listed Operator/Senior Operator Terminated Employment on Listed Effective Date NL-89-526, Lists Discrepancies Noted in Amend 109 to License DPR-54,per 890615 Discussion W/S Reynolds.Tech Specs Encl1989-06-22022 June 1989 Lists Discrepancies Noted in Amend 109 to License DPR-54,per 890615 Discussion W/S Reynolds.Tech Specs Encl ML20245H4181989-06-21021 June 1989 Discusses Util Plans Re Overall Closure of Plant,Per 890615 Meeting W/Nrc.Util Will Request Appropriate Changes to Tech Specs to Reflect Defueled Mode & Will Evaluate & Request Changes to Emergency Plan ML20245D9281989-06-21021 June 1989 Discusses Activities Underway Re Plan for Closure of Plant Discussed During 890615 Meeting W/Region V.Util Intends to Continue Use of Essential Programs,Such as Preventive Maint Program,For Sys within Scope of Closure Process ML20245A0981989-06-16016 June 1989 Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. No Westinghouse Plugs Used at Plant ML20248B5751989-06-0202 June 1989 Advises That Util Anticipates That Final Analysis of Thermal Striping Will Conservatively Support Surge Line Lifetime Significantly Longer than June 1994 Date,Per NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification NL-89-468, Submits Justification for Absence of Functional Testing Requirement in Proposed Tech Spec 4.14(f) Re Snubber Svc Life Monitoring,Per 890517 Request1989-05-30030 May 1989 Submits Justification for Absence of Functional Testing Requirement in Proposed Tech Spec 4.14(f) Re Snubber Svc Life Monitoring,Per 890517 Request ML20247N2601989-05-25025 May 1989 Requests Guidance Re Whether NRC Concurs W/Arbitrator Order Concerning Employee Access to Plant 1990-09-06
[Table view] |
Text
m -
a- ,. *
$SMUD SACRAMENTO MUNICIPAL UTIUTY DISTRICT C P. O. Box 15830, Sacramento CA 95852-1830,(916) 452-3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA MAY t-4 1987 JEW 87-762 F;
_~_
'l -1 J. B. Martin Administrator di U. S. Nuclear Regulatory Commission :5 _,
Region V n L;
Office of Inspection and Enforcement t?
1450 Maria Lane Suite 210 c Walnut Creek CA 94596 "'
Docket 50-312 Rancho Seco Nuclear Generating Station Unit #1 PASS STATUS REPORT Attention: Mike Cillis
Dear Mr. Martin:
Attached is the bi-weekly update of a working copy status report of the PASS modifications dated 4/27/87 for your information. This report has been provided to the Resident Inspector's Office.
Should you have any questions, please contact Bob Fraser at extension 4364 or Masa Nakao at extension 3905.
Sincerely, E. Ward Deputy General Manager, Nuclear Attachments
. cc: George Kalman, NRG - Bethesda (w/atchs) "
l A. D'Angelo, NRC - Rancho Seco 8705120288 870504 PDR ADOCK 05000312 P PDR s\
DISTRICT HEADQUARTERS O 6201 S Street, Sacramento CA 95817-1899 ,
4/27/87 Page 1 of 5 PASS STATUS REPORT PASS ECNs A-5773 ADD RADIATION MONITOR AND RELOCATE IGE
-MEL sheet revisions in progress for R-15713.
-WR 127101 is closed. l
-WR 116995 (Rad Mon R-15713 loop check) is in the closure process.
ACTION -Tech Spec required testing of Rad Mon R-15713 will be incorporated into existing SPs for the weekly
" CHECK" and monthly " TEST". A new SP (SP 1107) will l be created for the quarterly " CALIBRATION" (Ref Tech Spec Table 4.1-1, item 44a).
-FPR required to revise drawing M-575 Sheet 1 to l change RI-15713 to R-15713. l
-No drawing change required. Action item deleted.l A-5735 ADD PASS ION CHROMATOGRAPH ACTION -QC has inspected and signed off. Paperwork closure required. (In progress) (WR 128497)
ACTION -Table top chart recorder has been received but requires minor modifications for use with the IC.
DCN changes will be required. (In progress) i ACTION -Functional testing required. (In progress) 4 -Run solution through the lines to trace them.
-Prepare solutions and flush (regenerate) the columns.
-Verify operation of the solenoid valves.
-Introduce standards and verify accuracies.
-STP 430 (DHS Sample Test) must be performed before this ECN can be turned over to Operations.
A-4711I INSTALL BACKUP SOURCE OF FLUSH AND COOLING WATER
-Release is tied to the performance of STP 433.
R-0285 DHS SAMPLE VALVE REPLACEMENTS
-Replaces valves HV-26000, HV-26003 and HV-26004.
-Construction is in progress.
R-0317 RELOCATE GRAB SAMPLE CONNECTIONS
-MEL sheets are complete.
-Release pending replacement of broken manometer.
-New manometer received (PR 10067). l Installation pending. l
-Drawing change done to build a cover for the manometer. WR 131276 written to build the cover.
-Work is in progress to build the cover. ;
g '
Page 2 of 5.
R-0361 ADD CHECK VALVES TO DHS SAMPLE LINES
-MEL sheets are complete.
-Release is pending and in-service leak check of valves RSS711 and RSS712 with the RCS in hot shut down. Will be done in conjunction with STP 433. This is to check for thru-valve leakage.
R-0424 FLUSH / DILUTION WATER DEMINERALIZER ACTION -Need to replace Conductivity Indicator CI-49601 with a model having the correct range.
-Work request initiated to repair the leak on the output of Filter F-496.
R-0488 HYDROGEN ANALYZER / PASS SAMPLE LINE HEAT TRACING CHANGES
-Release is tied performance of STP-793.
AC'l' ION -Revise Process Standards (AP.100) to incorporate instrument set points.
-Engineering Action Request (EAR) IC87-012 initiated with a due date of 5/1/87.
-This item is pending calculations for the 'l acceptance criteria of STP-793 which is in l progress. l ACTION -Revise procedure A.52 step 4.1.10.4.4 to specify the calibrated setting and not specifically 285 deg.F since they are not all set at 285. Also add a reference to the appropriate section of Process Standards.
R-0559 SCAS PANEL MODIFICATION
-Release is tied to performance of STP 433.
ACTION -Manuals require update. (In progress)
-N27.01-IM01
-N27.01-IM02
-N27.02-IM01
-N27.08-6 (May not require update)
-FPR #1 written to replace 4 SIMPSON meters with NEWPORT meters. (Drawing Change Notice in progress)
-Purchase request (PR 10359) issued for the new meters.
-FPR #2 initiated to add "T" fittings for adding water-to calibrate the level probes in V716 and V717.
-FPR #2 approved. WR 131289 written to install l the fittings. l ACTION -The SCAS panel needs internal lighting installed.
-Field Problem Report (FPR) required.
ACTION -Revise Process Standards (AP.100) to incorporate instrument set points.
-Engineering Action Request (EAR) IC87-042 initiated with a due date of 6/1/87.
.. 1 f,
. Page 3 of 5 R-0732 BACKUP LAB FOR PASS GRAB SAMPLES
-Chemistry has submitted recommendations to Nuclear l Engineering to revise the Design Basis Report and l Safety Analysis. l
-Engineering Action Request (EAR) SY87-045 initiated to make the revisions.
' PASS STPs 426 SAMPLING TIMES USING THE PASS
-Test Outline approved.
-The procedure has been reviewed by the Test Working Group (TWG). TWG approval is pending approval of AP.313-1 (PASS Operating Procedure) revision 1.
-STP-426 records the sampling times during the performance of AP.313-1.
-Revision of AP,313-1 is pending additional !
functional testing of the PASS. l 428 MEASURE VOLUMES A & B
-Test complete.
-Closure pending final review by Test Review Group (TRG).
429 MEASURE VOLUMES S & T
-Test complete.
-Closure pending final review by TRG.
430 DHS SAMPLE TEST
-The Test Outline was approved with comment by the TRG on 4/9/87.
-Acceptance criteria for flushing being addressed to resolve TRG comment. EAR SY87-044 initiated.
-The procedure was reviewed by the TWG and their l comments have been encorporated. Furthur review is l on hold pending final approval of the Test Outline. l 431 SYSTEM FLUSH
-Test results are with Bob Fraser for processing.
-NCR S-5309 Rev. O closure pending final signoff of STP-431.
432 GASEOUS SAMPLE TEST
-The Test Outline and procedure are approve. l
-Calibrated gas has been moved to the environmental lab for testing to establish base line data.
-WR 131280 initiated to install test "Ts" for collecting gas samples.
-Procedure performance is pending receipt of syringes for collecting gas samples during the test. (On order - PR 10097)
~
[ .
- Page 4 of 5 433 RCS SAMPLE TEST
-The Test Outline is approved.
-The procedure is scheduled to be submitted to the l TWG by 4/29/87. l 793 HEAT TRACING
-The Test Outline was reviewed by the TRG on 4/9/87.
Comments to be incorporated.
-Outline approval is pending calculations being l generated by the Design Engineer for acceptance !
criteria. Completion of the calculations due !
approximately 5/1/87. l
-The procedure was reviewed by the TWG and their l comments are being incorporated. l PASS SPs 907 MONTHLY FUNCTION TEST OF PASS
-Drafting of Test Outline and Procedure pending revision 1 to Operating Procedure AP.313-1.
-A draft of the SP exists based on Revision 0 of AP.313-1.
-Must include the monthly " TEST" of Rad Monitor R-15713 per Tech Specs, Table 4.1-1, item 44a.
-A new SP will be generated to perform the quarterly " CALIBRATION" and the weekly " CHECK" will be inserted into an existing SP.
PASS APs 313-1 EMERGENCY SAMPLING USING THE PASS ACTION -Revision 0 approved 2/26/86. Revision 1 is drafted.
Revision 1 review and approval is pending system functional testing to verify the procedure.
313-1A UNDILUTED GRAB SAMPLE FROM PASS FOR OFFSITE ANALYSIS
-Revision 0 approved 2/26/86.
313-1B DILUTED GRAB SAMPLE FROM PASS FOR ONSITE ANALYSIS
-Revision 0 approved 2/26/86.
313-1D HANDLING AND LOADING OF NUPAC CASK MODEL NUMBER PAS-2 ACTION -Procedure drafted. Word processing required.
-Bob Fraser has the procedure and will take action to get it approved.
MISCELLANEOUS ITEMS DESIGN BASIS REPORT
-The PASS design basis has been issued for the initial review. The System Engineer reviewed the draft and provided comments to the Design Engineer.
Page 5 of 5 TRAINING ACTION -A list of personnel to be trained on PASS needs to be established and a method developed to document and schedule the. training. Coordinate with TRAINING.
-Class room training was conducted on 4/17/87.
All Chemistry Technicians have now received 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of classroom training. Selected Techs will receive hands on training between now and plant heatup.
SPARE PARTS ACTION -A list of required spare parts must be developed and a Purchase Request generated to order them.
PREVENTATIVE MAINTENANCE ACTION -A Preventive Maintenance program must be developed for the appropriate PASS components.
PASS COMMITMENTS ACTION -SMUD commitments to the NRC must be revised to refelect the capabilities of the PASS.
-Licensing has completed a draft of the !
transmittal and routed it for comment. l PAINTING ACTION -A work request will be written to have the room painted which houses the PASS control panel.
-Work Request 131290 was written to have the bottom l of the SCAS panel. cleaned and painted. l DUCTWORK ACTION -Ductwork must be installed to contain miscellaneous wires in the vicinity of the IGE and MCA.