Notice of Violation from Insp on 860408-10
ML20211F901
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/11/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20211F883 List:
References
50-395-86-08, 50-395-86-8, NUDOCS 8606190141
Download: ML20211F901 (1)


Text

n ENCLOSURE 1 NOTICE OF VIOLATION South Carolina Electric and Gas Company Docket No. 50-395 V. C. Summer Nuclear Station License No. NPF-12 The following violation was identified during an inspection conducted on April 8-10, 1986. The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).

Technical Specification 6.8.1.e requires written procedures for implementing the Radiation Emergency Plan. Table 6.2 of the Radiation Emergency Plan specifies that the State of Seuth Carolina and four county governments will be notified "as soon as possible" following declaration of an emergency.

Paragraph IV.D.3 of Appendix E to 10 CFR Part 50 specifies that licensees have the " capability to notify respo'sible State and local governmental agencies within 15 minutes after declaring an emergency."

Contrary to the above, Emergency Plan Procedure EPP-002, " Communication and Notifications," is inadequate in that it specifies that the process of notification of the State of South Carolina and the four local county governmental authorities is required only to begin (rather than be completed), using one individual, within 15 minutes after an emergency is declared or 'an emergency classification is escalated. Since notifications to State and local governmental agencies are made in series, this system does not provide the capability to notify State and local governmental agencies within 15 minutes after declaring an emergency.

This is a Severity Level IV violation (Supplement VIII).

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including: (1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.

Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.

JUN 11 1986 Date:

8606190141 860611 PDR ADOCK 03000395 G PDR