- - - - - - - _ -.
k l:
^.a l
'l 1
ENCLOSURE 1 i
NOTICE OF VIOLATION South Carolina Electric & Gas Docket No. 50-395 V. C. Summer Nuclear Station License No. NPF-12 4
During the Nuclear Regulatory Commission (NRC) inspection conducted on August 1 through September 30, 1987, violations of NRC requirements were identified.
.The violations involved inadequate action for degraded fire detection equipment and failure to follow procedures.
In accordance with the " General Statement of l
Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1986), the violations are listed below:
A.
Technical Specification 3.3.3.7 requires that the fire detection instru-mentation for each fire detection zone be operable.
If the. equipment is inoperable, it then requires that a fire patrol inspect the zone at least once per hour.
If the instrument is located inside containment, the containment must be inspected at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or the containment temperatures be monitored at least once per hour.
Contrary to the above, the licensee failed to monitor containment tempera-tures each hour between the hours of 7:00 P.M. on July 29, 1987, and-2:00 a.m. on July 30, 1987, and failed to establish a fire watch patrol in fire zones ZZZ, WWW, LLL and Q between the hours of 2:00 a.m. and 12:30 p.m. on July 30, 1987, while the fire detection instrumentation for these areas were inoperable.
These violations' are similar.to a violation contained in 'NRC letter dated August 8,1986 and to a licensee identified violation in Inspection Report No. 50-395/86-13.
This a Severity Level IV violation (Supplement 1).
B.
10 CFR 50.59 permits operation not described in the safety analysis report if an evaluation has been performed to show that it is not an unreviewed safety question.
3 1
Technical Specification 6.8.1.a requires that station procedures be
)
established, implemented and maintained.
System Operating Procedure l
SOP-304, implements this requirement for 7.2 kV switchgear and states to operate transformers XTF-4-ES and XTF-5-ES in parallel.
Contrary to the above, on September 3,1987, the licensee failed to operate the transformers in parallel or evaluate the change in operation from that described in the safety analysis report.
l This is Severity Level IV violation (Supplement 1).
l 1
Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including: (1) admission or denial of the alleged violations; (2) the reasons l
8710270418 871015 l
PDR ADOCK05000g5 l
0 l
.w
.w 4
South'CaroIinaElectric& Gas.
2 Docket No. 50-395-
~
V.fC.SummerNuclearStation License No.' NPF-12 for theLviolations if admitted; (3) the corrective steps which have been.taken and the:results achieved; (4) corrective steps which will be taken to avoid further.vJolations; and.(5).the date when full compliance will be achieved.
- Security or safeguards information should be' submitted as an enclosure tcr facilitate withholding it from public. disclosure'as required by 10.CFR 2.790(d)-
or 10 CFR 73.21.
I FOR'THE NUCLEAR REGULATORY COMMISSION StH5tNM: SIGNED E DAVID,M. VERREl.U Luis A. Reyes, Director Division of Reactor Projects Dated at Atlanta, Georgia-this 15th day of October 1987 i