,w ENCLOSURE 1, NOTICE OF VIOLATION South Carolina Tlectric & Gas Docket No. 50-395
(
V. C. Sumer Nuclear Station
- License No..NPF-12 During' the Nuclear Regulatory C9missirn (NRC) inspection conducted -on
-June l1 - 30, 1990, a violation of NRC rcquirements was identiffed. 'In accordance
- ' +-
Lwith the " General Statement of Policy and Procedure for NRC Enforcement Actions,"
L10 CFR Part 2, Appendix C:(1990), the violaticn is listed below:
Technical Specification 6.8.1.a requires that writtern procedures be.
' established, implemented, and maintained for. activities referenced in g
4 Appendix A of' Regulatory Guide 1.33, Rev. 2, revruary 1978.
Systeru Operating Procedure Component Cooling Water, Re'v. 30, 50P-118, requires two operators to verify proper valve positions.
i' Contr.ary to the above. on June 10, 1990, two chiller water valves were i
mispositioned - and verification. by two operators failed to detect the correct positions,.resulting in an alignment that caused an overheating the B~CCW pump motor..
This is a Severity Level IV violation (Supplement I).
l Pursuant to. the provisions of CFR 2.201, South Carolina Electric & Gas Co.'
. is hereby required to submit:a written statement or explanation to the Nuclear
' Regulatory Commission, ATTN: Document Control: Desk, Washington, DC 20555, with-a copy to the Regional Administrator, Region II, ard a copy to-the NRC Resident Inspector, 'V. C. Summer Nucleer Station, within 30 days of the -date of the L
_ letter transmitting this. Notice.
This reply should be clearly marked as e l
" Reply.to-a Notice of. Violation" and should include (for each violation):
(1)
L cdmiss' ion :or denial of. the violation, (2) the reason for the violation' if admitted, (3). the corrective st@s which have been taken and the results-achieved, (4) the corrective steps which will be taken to avoid further tiola-tions; and -(5) the date when full compliance will-be achieved.
Where good cause-is shown, L "ideration will be given to extending the response time.
If an adequate reply:is not. received within the time specified in this Notice, an 9
order may be issued. to shw cause' why the license should not be modified,
- y suspended, or -evoked or why such other action as may be proper should not be
-i taken.
FOR THE NUCLEAR REGULATORY COMMISSION l
Lf ow
=
Da id M. V relli, Chief Reactor Projects Branch 1 r
r Division of Reactor Projects l;
Da Atlanta Geor la
.thfeda dayofJuly1h90 p
si 9007260125 900712
'PDR ADOCK 0500039'5 G
- - - -