ML18040A345

From kanterella
Revision as of 00:35, 24 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 98-004-01:on 980302,Ts Required LSFT of Level 8 Trip of Main Turbine Was Missed.Caused by Knowledge Deficiency of EHC Sys.Revised Applicable LSFT Procedures Prior to Refueling Outage 6.W/980604 Ltr
ML18040A345
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/04/1998
Revision: 0
From: DAHLBERG K A, WARD K D
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-98-004, LER-98-4, NMP2L-1788, NUDOCS 9806160140
Download: ML18040A345 (10)