ML20155G341

From kanterella
Revision as of 09:19, 17 December 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Discusses Insp Repts 50-324/85-26 & 50-325/85-26 on 850812- 16 & Forwards Notice of Violation
ML20155G341
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/21/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20155G345 List:
References
NUDOCS 8605050385
Download: ML20155G341 (2)


See also: IR 05000324/1985026

Text

O

.

[e//M

APR 211986

Carolina Power and Light Company

ATTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction ~

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-325/85-26 AND 50-324/85-26)

This refers to the special team inspection of Environmental Qualification con-

ducted by the NRC August 12 - 16, 1985, of activities authorized by Operating

License Nos. DPR-71 and DPR-62 for the Brunswick Steam Electric plant. The

results of this inspection were previously sent to you by our letter of

November 12, 1985. The inspection team identified four deficiencies classified

as Potential Enforcement / Unresolved Items. We have determined from a irther

review of these matters that two of the four Potential Enforcement /U. >1ved

Items were in violation of NRC requirements. These two are identific a the j

inspection report as items 50-325, 324/85-26-10 " Inclusion of Rockbestos Coaxial

Cable on EQ List," and 50-325, 324/85-26-11, " Qualification of Rockbestos Fire-

wall III Cable." The violations, references to pertinent requirements, and

elements to be included in your response are presented in the enclosed Notice of

Violation.

Potential Enforcement / Unresolved Items 50-325/324:85-26-04, " Procurement of

Replacement Parts," and 50-325/324:85-26-05, " Qualified Status of Installed Equip-

ment / Establishment of EQ Maintenance Requirements in Plant Procedures," are

regarded as Unresolved Items.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, l

Title 10, Code of Federal Regulations, a copy of this letter, its enclosure, and

your reply will be placed in the NRC's Public Document Room upon completion of our l

evaluation of the reply, j

1

The responses directed by this letter and the enclosed Notice are not subject to  ;

the clearance procedures of the Office of Management and Budget as required by

the Paperwork Reduction Act of 1980, PL 86-511.

e6050hh

PDR

o [

G

I r.Eo l

.

,

'

.

Carolina Power and Light . Company 2 APR 211996

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

Original Signed by

Luis A. Reyes /for

Roger D. Walker, Director

Division of Reactor Projects

Enclosure:

Notice of Violation '

cc w/ enc 1:

1P.W. Howe,VicePresident

Brunswick Nuclear Project

dC.R.Dietz,PlantGeneralManager .

bec w/ encl:

jNRC Resident Inspector

Document Control Desk

gStateofNorthCarolina

B. K. Grimes, 0IE

AJ. Axelrad, 0IE

s,

-

-

-

-.

__

'

RIM RI RI R?, RII

ARuff:jw TConlon A erdt ibson P redrickson [WlM

03/ /86 03 /86 /3 /86 86

04/g/86 4  %

+/i,/rb.* p a d V& ns %

l'c

u _ _ _ _ --

W * # ',leEuf;d-

w 8.cA

i A " M