ML20127P155

From kanterella
Revision as of 09:07, 9 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards License Change Application 229 to License NPF-1, Modifying OL to possession-only License to Permit Plant to Possess SNM But Not Operate Nuclear Reactor to Support Decision to Cease Plant Operation
ML20127P155
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 01/27/1993
From: Cross J, Robinson W
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20127P160 List:
References
NUDOCS 9302010201
Download: ML20127P155 (2)


Text

. . ~ - - .

4 -w .

,.9-  : ,

1,.

1 mumm man, -

em Portland General Electric Company

.-James E. Cross Vice President and Chief Nuclear Officer -

January- 27, 1993'-

Trojan Nuclear Plant Docket.50-344 License.NPF-1 U.S. - Nuclear Regulatory Commission t Attn: Document Control Desk Washington DC 20555

Dear Sir:

License Change Application (LCA) 229 - ~f '

Rftqu.ta.t for PQaansalon Only. Licenan (IQL)'

' Attached is one signed original of LCA 229 requesting amendment of ,

Operating License NPF-1. - This LCA proposes to ~ modify the> Trojan Nuclear- -

Plant Facility Operating ~ License ' to a " Possession 10nly . License to' allow Trojan to possess special nuclear material, but not operate the nuclear reactor. This amendment is requested to support the' decision to cease- <

permanently nuclear operation of the Trojan Plant. -1 Attachment I provides the description of the change, the reasonsfor the~

~

change, and the no significant-hazards consideration determination .

~

Attachment II provides a mark-up copy of License-NPF-1 reflecting the--

changes' proposed by this_LCA._ Attachment III provides a revised copy of' License NPF-1 ref)ccting the changes proposed by-this.LCA. ,

It-is requested.tha_t this change become effective.immediately upon Nuclear:

Regulatory Commission-(NRC) approval'of this amendment and upon written-certification from Portland General Electric Company-(PGE) to the NRC.thati the reactor fuel has-been permanently off-loaded from the reactor vessel and placed in the spent. fuel pool, o

l) 1.

l-010023- 4 y '

L  !

L 19302010201-930127 4 4_

- (f . t  ;

.:PDR ADOCK 0500 ) i E '

~121 SW Salmon Street, Portland, .OR 97204 u 4i.

) -9 1503/464 8897 %J j a

n-4 Document = Control Desk January 27, 1993 Eagc_2-

'Also attached is one signed copy of the Certificate of Service for LCA 229 to the Chief Executive of the county in which the facility is located and the Director of the Oregon Department of Energy.

Additionally, PGE will maintain its current Fitness for Duty Program which was developed to meet .ne requirements of Title 10 of the Code of Federal Regulations, Part'26 (10 CFR 26).

Sincerely, v uec)

W. R. Robinson for J. E. Cross Attachments c: Mr. John B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. David' Stewart-Smith State of Oregon Department of Energy Mr. Kenneth Johnston NRC Senior Resident Inspector Trojan Nuclear Plant

,