License Change Application 229 to License NPF-1,modifying OL to possession-only License to Allow Util to Possess SNM But Not Operate Nuclear reactor.Marked-up License NPF-1 Encl
ML20127P169
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 01/27/1993
From: Robinson W
PORTLAND GENERAL ELECTRIC CO.
To:
Shared Package
ML20127P160 List:
References
NUDOCS 9302010204
Download: ML20127P169 (24)


Text

. . -. .- . _ . . - _ - . - . .

- p .

PORTLAND GENERAL ELECTRIC COMPANY

-EUGENE WATER & ELECTRIC BOARD AND PACIFIC POWER & LIGifT COMPANY ~

Operating License NPF-1 Docket 50-344 License Change Application 229 This License Change Application requests to modify the Trojan Nuclear Plant Operating License NPF-1 to a " Possession Only License".

I, W. it. Robinson, being duly sworn, subscribe to and say that I am the Vice President, Nuclear for Portland General Electric Company, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.

Date i!a7 , 1993 By J W. .R.

M_

Robinson Vice President, Nuclear On this day personally appeared before me W. R. Robinson, to me known to  ;

be the individual who executed the foregoing instrument, and acknowledged i that he signed the same as his free act.  ;

GIVEN under my hand and seal this 27th day of January 1993.

j'(sota) h) }. a ctL L $t2 wl 4

Notary Public in and for the State of Oregon Residingathdhw'4)

My commission expires Ol!!dth S$1Nf i

9302010204 930127 i- PDR ADOCK 05000344 p PDR

S l

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION I i

In the Matter of -)

)

PORTLAND GENERAL ELECTRIC COMPANY, ) Docket 50-344 THE CITI 0F EUCENE, OREGON, AND ) Operating License NPF-1 PACIFIC POWER & LIGHT COMPANY )

)

(TROJAN NUCLEAR PLANT) )

CERIIEICAIESE_ SERVICE I hereby certify that copies of License Change Application 229, to the Operating License f or Trojan Nuclear Plant, dated January 27, 1993, have been served on the following by hand delivery or by deposit in the United States mail, first class, this 27th day of January 1993:

State of Oregon Department of Energy 625 Marion St NE Salem OR 97310 Mr.-Michael J. fiykes Chairman of County Commissioners Columbia County Courthouse St. Helena OR 97051

//Hf K. Chernof f[

Manager Licensing Technical Functions 4

On this day personally appeared.before me H. K. Chernoff, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act.

GIVEN under my hand and seal this 27th day of January 1993.

_L ifAtttb l. 0bnLLQA& Notary Public in and.for the State of Oregon Residing at W LEUA.) My commission expireMardt MO;197M 5

Trojan Nuclear Plant Document Control Desk Docket 50-344 January 27,1993 License NPF-1 Attachment 1 Page1of5 Hackcround and Reason for Chance The Trojan Nuclear Plant (TNP) Facility Operating License, NPF-1, currently allows Portland General Electric (PGE) to possess, use, and operate the facility in accordance with the license. This requested license amendment proposes to modify the Trojan operating license to a " Possession Only License" (POL). The POL will allow Trojan to possess special nuclear material but not to operate the nuclear reactor. In addition, the POL will provide the licensing basis for the Nuclear Regulatory Commission to grant regulatory relief to PGE from certain operational requirements that are inappropriate for a permanently shutdown and defueled reactor. This license modification is being requested to support the 6 cision by PGE to permanently cease power operation at the Trojan plant. Description of Chance The requested amendment to the Trojan Facility Operating License deletes references to use of special nuclear material as reactor fuel and removes on a permanent basis authorization to operate the facility as a nuclear generating station at any power level. Beyond the changes to the Facility Operating License noted above, additional changes were made in Section 2C not in support of the POL, but to delete historical information or items that are no longer applicable to Trojan. The items deleted included Section 2C(3),

                                 "Less than Four Loop Operation" (no longer applicable), Section 2C(4), " Report on Vibtation Tests" (historical information), and Section 2C(5), " Replacement of Certain Relays" (no longer applicable) In addition, selected items from Section 2C(6), " Spent Fuel Pool Modification" (no longer applicable), were deleted The items deleted in this section pertained to spent fuel storage requirements prior to commencing work on the modined rack design performed in accordance with submittals in August and October 1983. Additionally, a portion of Section 2C(7), " Quality Assurance", was deleted. The deleted text pertained to the Quality Assurance Program for Construction requirements for the installation of certain hangers, restraints and snubbers and was considered no longer applicable to Trojan The changes to Section 2C are considered editorialin nature.

Similarly, items in Enclosure 1 to License NPF-1, " incomplete Preoperational Tests, Startup Tests and Other Items Which Must be Completed", have been deleted as these items are no longer considered relevant to Trojan's permanently shutdown and defueled condition. This enclosure identined certain preoperational tests, startup tests and other items that had to be completed to the satisfaction of the Commission prior to achieving certain specified operating conditions These deletions from Enclosure I to the Trejan Facility Operating License are considered editorial in nature. _-mm --

                                                        ~               _            -              .

s. 4 Trojan Nuclear Plant . Document Control Desk

              - Docket 50 344                                                    January 27,1993 License NPF-1                                                     Attachment I               ,

Page 2 of 5 No Sienificant linrards Considerations Determination Description of the Ameruhnent Request This requested amendment modifies Facility Operating I,icense NPF-1 for the Trojan Nuclear Plant (TNP) to a " Possession Only License" (POL) The requested amendment will allow Portland General Electric (PGE) to possess special nuclear material but will-remove authorization to operate the nuclear reactor at any power level permanently. The change is requested to take efTect immediately upon NRC approval of this amendment and certification from PGE, by letter, that the fuel has been oft-loaded from the reactor core and stored in the spent fuel pool. The following discussion will demonstrate that the requested license amendment involves no significant hazards considerations. t No Sigmficant fla:ards Considerations Determination In accordance with the three factor test of 10 CFR 50.92(c), implementation of the requested license amendment is analyzed using the following standards and found not to:

1) involve a signincant increase in the probability or consequences of an accident previously evaluated, or 2) create the possibility of a new or di!Terent kind of accident from any accident previously evaluated; or 3) involve a signi0 cant reduction in a margin of safety.

Conformance of the requested amendment to the standards for a determination of no signincant hazards as defmed in 10 CFR 50.92 is shown in the following:

1) 1he requested license amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.

The requested amendment will remove on a permanent basis PGE's authorization to operate the Trojan Nuclear Plant as a nuclear electrical generating station. The requested amendment does not modify the present plant systems or administrative controls necessary to' preserve and protect the integrity of the nuclear fuel on site at Trojan. The requested amendment will not increase the probability of occurrence of previously evaluated accidents. With the reactor permanently shutdown and defueled, a number of previously evaluated accident are no lop r credible and thus the probability of their occurrence is reduced. The revested amendment l in no way increases the probability of occurrence of fuel handling r:cidents previously evaluated, and these analyses remain valid. These analyses address the consequences of an accident while fuel is in the spent fuel pool, in the reactor vessel, or in transit during core off-load.

 ~

l i I y

              - Trojan Nuclear Plant                                              . Document Control Desk              :

Docket 50 344 January 27,1993 , License NPF-1 - Attachment I Page 3 of 5 9 The probability of and consequences from a fucl handling accident remain unchanged and are bounded by the current accident analyses. Therefore,  ; the requested change does not involve a significant increase in the probability or consequences of an accident previously evaluated. 1 The historical information and information no longer considered relevant deleted from Section 2C and Enclosure 1 of the Facility Operating License _ are considered editorial changes and do not affect the manner in which systems or components are operated or maintained. These changes do not alter the intent of the Facility Operating License and , therefore, do not - involve a significant increase in the probability or consequences of an accident previously evaluated.

2) The requested license amendment does not create the possibility of a new or d t(ferent kind ofaccidentfrom any accident previously evaluated.

Upon permanent shutdown and defueling under the requested amendment, PGE's authorization to resume power operation is removed on a permanent basis. Any accident associated with this requested change is bounded by current accident analyses.- Existing analyses address potential accident scenarios from shutdown conditions through full power operation; There are no new accident scenarios or failure modes created by maintaining the reactor in the defueled condition. In the permanently shutdown, defueled condition with the fuel stored in the spent fuel pool, there are no new credible accident conditions that difTer from those previously analyzed Therefore, the requested change ivill not create the possibility _ of a new or different kind of accident. The historical information and information no longer considered relevant deleted from Section 2C and Enclosure 1 of the Facility Operating License - are considered editorial changes and do not afTect the m'anner in which systems or components are operated or maintained. These editorial changes do not alter the intent of the Facility Operating License and, therefore, do not create the possibility of a new or different kind of-accident from any accidnt previously evaluated. .

Trojan Nuclear Plant Document Control Desk Docket 50-344 January 27,1993 ~ License NPF-1 Attachment I Page 4 of 5 ,

3. 'lhe re<juested license arnendn:ent does not isn'oh e a significant reduction in a snatgin of safety.

The requested amendment removes on a permanent basis PGE's - authorization to operate the Trojan Nuclear Plant as a nuclear electrical generating station. Defueling the reactor and placing the fuel in the spent fuel pool does not adversely impact previously accepted _ margins of safety. Therefore, the requested change does not involve a sipificant reduction in a margin of safety. The historical information an? % formation no longer considered relevant deleted from Section 2C and r...c.osure 1 of the Facility Operating License are considered editorial changes and do not afTect the manner in which systems or components are operated or maintained. These editorial changes do not alter the intent of the Facility Operating License and, therefore, do not involve a significant reduction in a margin of safety. On the basis of the preceding analysis, it is concluded that the amendment of Trojan Facility Operating License NPF-1 to a Possession Only License is acceptable and involves no significant hazards considerations as defined in 10 CFR 50.92. Fnvironmental Impact Considerations Determination This amendment request meets the criteria specified in 10 CFR 51.22 (c)(9) for categorical exclusion or otherwise not requiring environmental review. Specific criteria contained in this section are discussed below. (i) 1he amendment invoh es no signtlicimt ha:ards considerations. As demonstrated above, this requested amendment does not involve any significant hazards considerations. (ii) There is no significant change in the types or significant increase in the utnounts of any effluents that snay be released offsite. The requested license amendment proposes to mod 4, the Trojan Facility Operating License to reflect the permanently defueHd and shutdown

condition of the Trojan Nuclear Plant and does not involve changes to any _

plant systems or components. The POL in itself will not authorize additional plant activities beyond those that may already be conducted in support of the current operating license. Administrative controls on plant

                                  ..a a

l 7, c Trojan Nuclear Plant Document Control Desk Docket 50-344 January 27,1993 ' License NPF-! Attachment 1 Page5of5 efliuents shall remain in place to ensure applicable regulatory guidelines on plant efiluents that may be released ofTsite are met. Moreover, there are no . new accident scenarios or failure modes created by maintaining the reactor

                  - in the defueled condition. Thus, because the requested amendment involves no changes to plant systems, components, or administrative controls, and as no new accident scenarios or failure modes are created, no             l anticipated plant activities as a result of the issuance of this requested amendment should result in a significant change in the types or significant increase in the amounts of any efiluents that may be released offsite.

(iii) there is no sigmficant increase in individual or cumulative occupational radiation exposure. 't The issuance of a POL for Trojan will not authorize additional plant activities beyond those that may be conducted in support of the current operating license. The requested POL will provide the licensing basis for the Nuclear Regulatory __ Commission to grant future regulatory relief to PGE from certain operational - requirements that are inappropriate for a permanently shutdown and defueled reactor. These operational requirements (surveillance testing, inspections, etc.), in some cases, result in the accrual of occupational radution exposure for Trojan workers. As the requirements for conducting these activities are reduced, many of these activities may be eliminated. The elimination of these unnecessary activities is expected to result in a decrease in the cumulative occupational radia_ tion exposure, as compared to the exposure associated with maintaining the current operating license authorizing continued power operation.. In addition, administrative controls shall remain in place t_o ensure that individual occupational - radiation exposure is maintained below applicable regulatory requirements. On the basis of the preceding discussion, it is concluded that amending License NPF-1 to a Possession Only License is acceptable and meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9), and thus no environmentalimpact statement or environmental assessment need be prepared in connection with the issuance of this

          . amendment.

I l

Troian Nuclear Plant ' Document Control Desk

           ~

January 27,1993

     .              Docket 50 344 License NPF-1                                                        Attachment II Page1of12 PORTLAND GENERAL ELECTRIC COMPANY THE CITY OF EUGENE. OREGON PACIFIC POWER AND LIGHT COMPANYf DOCKET NO. 50 344 TROJAN NUCLEAR PLANT FACILITY OPERATING LICENSE License No. NPF-1                 i
1. The Nuclear Regulatory Commktion (the Commksion) having found that:

A. The appilcation for license filed by Portland General Electric Cornpany, the . City of Eugene, Oregon, acting by and through the Eugene Water and Electric Board, and Pacific Power and Light Company' (the licensees) complies with the standards and requirements of the Atomic Energy Act.of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I and all required notifications to other agencies or bodies have been duly made; B. Construction of the Trojan Nuclear Plant (facility) has been substantially completed in conformity with Constmetion- Permit No. CPPR-79 and the application, as amended, the provisions of the Act and the rules and regulations of the Commiss 6 __mainta g , C. The facility c;fetzte in contornuty with the application, as amended, the l provisions of the Act, and the rules and regulations of the Commission; D. There is reasonable assurance: (i) that the activities authorized by this operating license can be conducted without endangering the health and safety 'l of the public, and (ii) that such activities will be conducted in compliance with the rules and regulations of the Commission; E. Portland General Electric Company is technically qualified and' the licensees are financially qualified to engage in the activities authorized by this cp= ting l license in accordance with the rules and regulations of the Commissions;

                 " Pacific Power and Light Company, which has a 2.5% ownership interest in Trojan, has merged with Utah Power and Light Company to become a new corporation-named PC/UP&L Merging Corporation, which will change its name to PacifiCorp, but will operate under the assumed business name of Pacific Power and Light Company.

Trojan Nuclear Plant Document Control Desk

     '                                                                                                                               January 27,1993 L          Docket 50-344 License NPF-1                                                                                                              Attachment II

) Page 2 of 12 - F. The licensees have satisfied the applicable provisions of 10 CFR Part 140,

                             " Financial Protection Requirements and Indemnity Agreements," of the Commission's regulations; G.            The issuance of this opera:inglicense will not be inimical to the common                                                        l defense and security or to the health and safety of the public; H.            After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of Facility Operating License No. NPF-1 set forth herein is in accordance with Appendix D to 10 CFR Part 50, of the Commission's regulations and all applicable requirements have been satisfied; and I.          The receipt, possession, and use of source byproduct and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Part 30,40, and 70, including 10 CFR Section 30.33,4032, and 70.23 and 7 1.

Insert A ~

2. Facility Operating License No. NPF-1 is hereb'y issued to the Portland General Electric Company, The City of Eugene, Oregon and Pacific Power and Light Company to read as follows:

A. This license applies to the Trojan Nuclear Plant, a pressurized water nuclear reactor and associated equipment (the facility) owned by the licensees. The facility is located on Portland General Electric Company's site on the we t shore of the Columbia River in Columbia County, Oregon, and is describel in the Updated Final Safety Analysis Report, as supplemented and amended in accordance with 10 CFR 50.71(e), and the Environmental Report as supplemented and amended (Supplements 1 through 3). B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses: (1) Pursuant to Section 103 of the Act and 10 CFR Part 50,'"Lcensmg of Production and Utilization Facilities," to possess, use, r.iB operate the facility at the designated location in Columbia County, Oregon in accordance with the procedures and limitations set forth in this license;

Tro#n Nuc!:ar Plant Document Control D:r.k Docket 50 344 January 27,1993 License NPF l Attachment 11 Page 3 of12 (2) Pursuant to the Act and 10 CFR Part 70, to rusi% possess and-use l at any time spec!al nuclear material as reactor fuel,in accordance with the limitations for storage and amounts-requireMor-r4xter-operation, I as described in the Final Safety Analysis Report, as supplemented and amended; (3) Pursuant to the Act and 10 CFR Parts 30,40, and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources,for-reater stamp, sealed sources I for reactor instrumentation and radiation monitoring equipment ' calibration, and as ilssion detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30,40, and 70, to receive, povess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical , form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. C. This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: , (1) 11pimum Power Level hPertland-General-Electrie4oinjEny-is-authori ed to opeme h 4aeility-at-steady 4 tate-reactor-core-power-levels-not-in-euestr-ef 3411 enegawatts-(thermalFprevided-that-the-preoperadona! te:t , ::::+cp 4ests-and-ether-items-identified-4n-Enelesure4to thi: lleens: het:- 4eu-completed-in-sequencer-Enclosure-1-is-an-integral-part of this.

                      - 41eens*

P T

l l Trojan Nuclesr Plant Document Control Desk Docket 50 344 January 27,1993 ' License NPF.1 Attachment 11 Page 4 of12 1 4

2. (coa:.)

C. (cont) (2) IechnicaLSprtifica1Lom l t88 l The Technical S, .cification. contained in Appendix A, as revised through Amendment No. E, and the Em'ironmental Protection Plan contained in Appendix B, are bereby incorporated into this license. The licensee shall opup44 the facility in accordance with the Technical Specifications and the E vi n ental Protection Plan. l mainta n (3) Le" 'han Feur ' eet4eAisS- h,~m  % This paragraph intentionally deleth

                                                ~     '

The 11ameewhall-nat-opmte4he reactesat pe ver ove  !:ve!: abyP (s.dcEned !n T2b!e 33-! ef Spec!Ccat!cn 3.3.1 ef ^.ppendh A te=thk=

                          .Ha nte) "ith !c:t- than (A) receer coc!2nt !cep: 'meparat!cn until r,afety 2n2!yce: '^ !n than four 'cep epwation Nve-been cubm!: tad.

and 2ppre"2' re !ez 'han-four 'cep cpuat!cn at pewu leveh 2berb

                          =P 7 has-been-grented-by-4h: ComuMen-by Amemiment of 'b!r lkase.

(4) .b oon m r " ratier T w e w w - g hts paragraph intentionally deleted Se !!centen ;52!! submit "h = (5) monthr,-frem t .e :.2te of thh

                           !!cente 2 ""2'-repon 2n2!y2!n; 'he re:uh ef the preeperational vibration tests of the-reccer !" tern 2!s pe6med du?ng het func+!en

tes'ing 2t the T cjan Mudec.rh. (5) Rep!Maatak^f'Nttain "e'~: - - - - his paragraph inte tionally deleted The !!censees th2!! "-ith!r,b: (c) -"'u 2nc 'ive (5) day .rMe date of th!s !!canse rep!2ce 211 'here ou*put rel2y: ef 'he-Sc!!d State Protect!en--System 2nd ^.t"d!!2rj S2feguard C2b!ne'- (er. cept there-rel2ye which the 1!censees have the", te 'he :2t!&c!cn e' the MC Staff-need net be replaced) "ith---re!2y: 'h2! sati:Sj +he- reh "1c qu2!!fication-critwia-for-tha-T+ian.Nus!e2r P!2nt, ^ 'he reacter shall be-thutde " unt!! th=: re!2y ac replaea!. (6) Soent Fuel Pool Modification De licensee is authorized to modify the spent fuel pool as described in the application dated August 1,1983 and amended October 31, 1983.

Trojen Nuclear i, tant Document Control Desk Docket 50-344 January 27,1993 , License NPF l Attachment 11 Page$of12

2. (cont.)

C. (cont.) . (6) ~' bot Fu ' bl-Willimb This pa.ragraph intentionally deleted _~~__ _ Since-4pont-. fuel-lG-now-being stcr-d I" 'he ! pert fue! p^^!,'Upor. seminen ement Of "/0;h Or O!!her th edning-F2th ^' the ne'." r2ct'e. kHhe-spent--fuel-peeWn-eenfanetbn "ith replace .en+ cf 'he ect'n". u,w;;n n _.m" " " " ~.,,t,, '"'"', -

                       .,                                                                                   This paragraph intentionally deleted (a)      +he-water-in th: pent-fuel poc! :halkont:! nit i- 62npp- beten.

2nd th2!! be ~~.!ntained at 'h!: berce concertration-undl-esmpleien

m. r h. . , , .i. . . .7
                                           . . _            m i. .,. . .. . . n . ,. .. n. a -

This paragraph intentionally deleted (b) 4ptnt-fu .- 1 e '. ^. .' _d '"...' b. . . "7" .". '. .#".. ... ' 7" ^ ^ .' .'. #. '.T.

                                                                                                                                 .                .d. A.~.    ..".&.
                                                                                                                                                                    .~I . .. _ .D. . _,, ', '.A 4ap-from4he-tim-  "~ '-~                                                     inoved fem-th: ::: !ce.

Duri ng the t f

                              %;p a . .m,                         ,,,
                                                          .. ... .v.

e ...b.

                                                                          'h2t u ..-n ber^".!:

m m.....,,i.m.n. requ! .red

                                                                                                                                   '" m...n
                                                                                                                                        .'.he,wospent
                                                                                                                             ,,m e.....vj fue! p^c!,1!-,th:
                                                                                                                                                       .w...n.,r ,i_ ,n _i.,mer,-

at !enet 3 e: per day:, "4'k max! mum-t!me !"te n! between. 4 mp!:: of 72 hours. Pder-te fina! canvers!cn te-the ed!"ed r d-der!gn, fuel ~ey be-

                              ,.n.,a_,

_ ~...ded , '" b..- '. k.-.~'.,...y'.

                                                           .                      .        ..        .            .              **^ -
                                                                                                                                                 ....t.'..e.

d..-".'.*.d_

                              -T44hnisa!! Sa ec!Osatic" 5.6.'.2 c: '" 'he e e "                                                              ; ste rnge " 4 e 4e                      s k m, . b. .i .
                                 ..f              'P. h. a. a.u.f.e . .. t.
                                                                         . t e.,n, , e.l. .c    ,
                                                                                                  .c a. A_ .s . e I.,nu. . . A e n. . A c,h.k m.            ..l
m. ._, I.n..g .ee.n. A u d t.h. .
                                                                                                                                                    ._,11.

_e _e.n. .rn.I n. , I 1. "!. ..'I _ l n. o.k.. e. m. n t m. e 9 6_M. a. n. t.a. .r A. l. e. t. _, n. e m. h M. t.i t m. a. n. . fu. e. l , c .r. a. m. .b. l placed.in-the4tarage r2d: !c ensure 2mk of!::: 'hn er equ2! te 0.95 ma,h , w ,..-, ,..n__,e, n ._ y nan _i. n__m_a_ ma,w ,m..s. n.e,,._a_ ...,_._ :~_n , a_ i_ _n,,, e_ n n. _e n_ ru. , t_it r a_, I. I. n_ m. e_ n_ e_ In_ m_ c u n. .e. p r,,In ,I. n_ c_ 9_ e a_ m e_ e_ rb. _ _ a_ In D_ _ et_I.n_ n i_ iS cr r. a,.7.e.ent . t. u. , m.y .a. . m. v e._ e...r. mm (7) Ouality Assuranqq _ _ ~~ r-- e Qctivieiea

                                                                        =4 3nba&46   .. :uv44 = v4rsea        w 4 4ung,w 4 p, a. ww>s        ~ . maas
                                                                                                                                                   .r .,. . a . . .y6,b.
                                                                                                          .u . t--.

L\wwy6 Ava t A Aw .- ,e s . .. Mentified in I:en A.1 of Enc!c grc : cama-liccas;, eshich my bc ecmp!c:cd in ac^c Ecn : rue !cr. elk:::  !"i:!::dan:: to which citha :h QualityOm!!rj Aaueanec Assurance Program P c;;r:sr. is fc applicable shall, after the date ofissue of this license, be conducted in accordance with the Nuclear Quality Assurance Program. (8) The licensee may proceed with and is required to complete the modifications identified in

t Document Control Desk

            <.      Trojan Nuclect Plont                                                                             l January 27,1993 Docket 50 344-
       *-                                                                            Attachment II                   i License NPF 1 Page 6 of1
2. (cont.)

C. (cont.) , Paragraphs 3.1.1 through 3.1.18 of the NRC's Fire Protection Safety Evahiation Report on the Trojan Nuclear Plant dated March 22,1978. ' These modifications shall be completed by the end of the second refueling outage of the Trojan facility and prior to return to operation for Cycle 3. In addition, the licensee shall submit the additional  ! Information identified in Table 3.2 of this Safety Evaluation Report in accordance with the schedule contained therein. In the event these dates for submittal cannot be met, the licensee shall submit a report explaining the circumstances, together with'a revised schedule. (9) Primary Shielding Modification The licensee is authorized to modify the primary shielding design as - described in PGE letter dated April 22,1977, as supplemented and amended by letters dated September 22 and 23,1977, December 22, 1977, January 4 and 24,1978, March 20, and April 4,1978. , (10) (This paragraph intentionally deleted.) (11) (This paragraph intentionally deleted.)- (12)- (This paragraph intentionally deleted.)  : (13) (This paragraph intentionally deleted.) E R i I

                -         ,         n    ,     ,                                         -
                                                                                                          +se r

Trojan Nucl:ar Plant Docum:nt Control Desk Docket 50 344 Enuary 27,1993 4 License NPF 1 Attachment 11 Page 7 of 12

2. (cont.) '

C. (cont.) (14) (This paragraph intentionally deleted.) l (15) (This paragraph intentionally deleted.) (16) . Spent Fi.el Asambly Shinoing Cash  ; I The licensee shall not move a spent fuel assembly shipp!ng cask into l the Fuel Building.  ! D. The licensee shall fully implement and maintain in effect all provisions of the Conunission approved physical security, guard training and qualification and safeguards contingency plans including amendments made pursuant to piovision of the Miscellaneous Amendments and Search Requirements to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information-protected under 10 CFR 73.21, are entitled: ' Trojan Nuclear Plant Security Plan", with revisions submitted through October 7,1988; "Irojan Nuclear Plant Security Force Training and Qualification Plan", with revisions submitted through June 10, 1988: and ' Trojan Nuclear Plant Safeguards Contingency Plan", with revisions submitted through October 7,1988. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth herein. E. This license is effective as of the date of issuance and shall expire at midnight - February 8,2011. FOR THE NUCLEAR REGULATORY COMMISSION Originally Signed by Roger S. Boyd, Acting Director nis enclosure Division of Reactor Licensing intentionally deleted Of5cc of Nuclear Reactor Regulation

1. Ecumpk:c Freepera:!c=! Temr S;c.; tup Tcau emd c;hcr Itcrca which mus; be complc:cd
2. Appendices A & B Technical Specifications Date of Issuance: November 21,1975

Enclosures:

        -                        . . _ . _ ~ .          . _ . _ _ _       _ . . _ . _ _ . _ _ ____                         _. _ _.

Trojan Nuclear Plant Document Control Desk Docket 50 344 Janacry 27,1993 License NPF 1 Attachment 11 ENCLOSURE 1 TO LICENSE NO. NPF 1 Page 8 of12

                               ,lntom.p_lete-Preope ra don al-Tect s:-St artua-Tes ts-tmd- This enclosure
                                           -Gtkf-item: "/hich ht-be-Complgig$                        intentionally deleted
          -TidHnelosure-identifies-eertain-preepef atiensi-tests,-startup-tests-and-ether-iterns-wideh-
          -must-be-completed 4o4he-satisfaction of4heEommission-prior 40-achievingtertain-speciGed-
          --operating-condidont ne !!cennes-shall not proceed-beyond-the-specified-operating-eenditions-without-prior-written-authorization-frorrHhe-Gommision, A       Thc followini; items must bc completedio4hesatisfaction-of-the-Gomndsien.
                        -prier-to-achieving-initial-eriticality+
                         -1        Installation cf hangersr - .weints--ami--snubbere--to--rellect--the.
                                 -requirements-of Westinghouse-ano-Bechtel-stres-ealeulations-on.
                                 -Q4isted-piping,
2. Ilcplacement and/cr qualificalicru cf - the--three--non :O !! :
                                 -<ompenentWn4he4satrobrystem-for-thMinel-genuater reem-cocting.
                                   +upply fan.
2. Ocmenstration cf Ccatrci!!com-{GR-)-ventilatiefsystem-espability4e.
                                 -maintain--the-pesitive-presure--requireme n t: cf-- dc Technical
                                  -Specificadom                                   -
4. Ocnsica of ic valvc stems-en-the-iselation valves of4hetentainment-
                                 -sump-meirculat!cn sy: tern :e ra! e-the-elevation-of-the-valve-motorf-2pprmimately4hree-feet:
f. Measurement of 6: tcapc=: time-ef-primarysystem-fict":ensors-(to-
                                   -be-dene-during !!c;" :crt-down test),
5. Performance- cf Se negative prezure :::: cf the-spent-fuel-pool.
                                  -building are to-demonstrat: ecmplianeewkh4he requirementsof-the-hhnical-SpeeiEsados
                           ~.        Comp lction of de scismic- analysis- cf Sc-dietcl-driven-auxiliary-feedwater-purre
3. E sination of ic a3-built-cendition-ef-piping-supperts-to-assure-that
                                  -4h: pretie= ::r:': cakulatiens-are-valid-
9. Deliverj ca site of Se updatedesion-of-Westinghouse 4-stetu.creport er &e primarypping-system strez analysirm t

l l l l l l i ,

                                                                    - - -                        , -         ,   w                 , ,
                             +                            -                                _ .. _ _ -                                 , . - - -.                                              .                           .

Trojan Nuclear Plant Docunont Control Dosk Docket 50 344 January 37,1993

.      License NPF 1                                                                                                                                                     Attachment 11 Page 9 of 12
40. Addition-of-e+tiffefeng-braee-to-the-service-water strainer-base-plater
11. .'.dditien-of-thrcc ficv. transmitters-to-thc CC."!. systcm-tc vcrify-
                                .GrCr%deignha f!ce to-eentainment-eir-ee0!cc. (he-itensmittet                                                                                                                                                  ,

13 's bc locatetHnside-cor.telmnent-) C. Addition of guidc pla:c3- and--pipe-restreints-and-+nubbers-to-the-rcm .. 3p.cm .0 ionag st$c33c3 vathm.-allowev,.c . . t e w.w. 6 6 mm.ts c.r.d-ensere-new . . a , ~.

                              '" w. . w . o                     yu fffp . u""          . _b_"tu   e nt - M M dn.a                             w u h _ _,nvu                awaanuw ou6u                                     a.m           .T
                                -te npere+ arc icadse
                   ,e                                                                                                                              . .                        . i ; _. n _ _ . . .                                           .

4.n n _ _i _ _ __ _ vs awyzuwwsuvun _._ 441w t r . 6w

                                                                                            . _ .u4      _ _perRf7"nD                                    Ist                   e84 ww v aw wa vvit .
                                                                                          . t_ _ _ _ _ _ _ _ _ _ . ;! _ _ t _ _ _ _ _ _ .                                                                                        _n ? _ _ _ ,
                               $8                                   T.?_  ba u4 u4w wauwagwuwf wawawa gv4awa p _.v4, wa44wtgwuwf u&wawd
                                                                                                                *                  ~ _.        ?_ _ _.                                                        __A
                                  .___ _ ..._. -                                                                                                                    .,.wu
                                                                                                                                                                        - _ .un
                                                                                                                                                                              !1.. uv
                                                                                                                                                                                    . ! _ u,    _.

3h uw a u6va - asvus .,-wumu . :1,. lten_, w v.4 6 uuunw u. uuu .usv.. iidiiUGcCtfttieft-tystefnt , s , _ r r. _ , _ _ _r . o _.. t _ _~_ o__ __ .t_ .c r__1.._.__

                        .           Av4WwAuwauvu V6 6TIw                                            1 647% a 6 w 444 gw&Wwa V&& 644w                                            .A L&A4 H a4 J 4wwWvvatwa

_ . _ . _ o _ t _ _1_ . t _ ._ . . _ t _ _ . __t.._f _tt..it _f. L af a6bsu a wvauuv64 va41wa su yuyaewusTy unut *e8Ye w $"ku v_y. __ wuuuv. ___. gsw_ ._u v_ . . .n t _ _ _ 3 _ __ __ _1 au4 s t _u?ts. . vj L .u, tuu_ u_ sj Lu _t .f m.,.g. rww owf vuu uva mu4 = u.

                   ,r               n__t________.                            _ r _ _ __ . _ . _ _ __ _ s e _ . _ t t . ? _ __ . c _ . _ _ _ _ t _ _ . ? _ . . L . r_
                 ~ 4./ .            4%wy4.&wbu4w uh v4 hvu 6.&w ed u;4u A4w wueu uvaa vt w ua a w un uvva ung 6 v suy a a va-
                                    .t__     _ _ ___
                                                                   ,_._t            _____.t               . . . _N _ t _ _

buw a6AAug 4w V wd hva4 L4 v4 a vv e 6v64b JJ 4r

                  'Av.

in?__ d nuuluvu v6 u _t . . _65u4ywo _ _ _ _ utug . . . . w_ wvut .. % . %t .m . . . , . . . 1b s4 uw u u .v s s..wung n..,,11.r . y.w . . . ( w . . . . m r . L . ns

                                *"!f,                                                           ..1t_.ML                                  c m .m               *T%       t
                                                                                                                                                                         #'~

_ .w uy va mv uw u'6 ' ' " OY~U " . "b * *" _g== __ * * .t n_S r_ - ___ _ . s f r* _ _ . ? _ _ _ __ . . _ _ _ _ _ _ . _ i

                    &le             4w4 64444                     44u Adv4              4..J 6e            44w& A 6             44 4WM 6 44 b d 64 W e &J            v&4        .4 4 k             ew.AuvveJ66                         g AT
                                  *cNOf$cabOrY
                   .t o             n__,__..___.mr                                           v..A                 f        ..Ar_tr,                        .

ss_r_ e . av. s w yauswuawsu va u wawvaa ysu vv 6uww aa uuaa t..IO h__m.u + v a muu v te Okie & vehc CV EMk

                    ,n               , , _ . . -       . __.?       _

_,_1__. .___ .1__ _____1.___ . _ _ _ _. _ _ , _ _ , _ _ _ , _ _ _ 4/. 14VM&&4bauc a va yea 446 v swa u6u 3 yivwwwsaa wa su 4 w 6 awiw b uv.. vi vuv _, r .im 1. _ __ . t . . - ,s . r a.usf .s.vu r _u.a. u

s. mv .nv
                                                               .m unw uu u r ws                        e fItl' u%s           wu     L.

vy. mw . L . wvu e C w.. w y ..utt.v w. k@ _n.....,,_m...wg.... v.c tvva4w m uwiu..a f u wu w .L-a.-..-- wuwevs vwaaws

                                                                                                                                                                                                                                 --.1
                                             . . . . . .                            .w     wvuw w uu uuv ua 7
                                   ,f.s11 vuv m   n .mg      .L ~ i ., y_ v~a..        6u4u1. k w.w .a    4.vTw4a  r"\/"* A . .                                                                                                                    r n         ar-t _    r_ti_.*                        *                 - -         t _ _ _ -- - i _ _n                           _ . t _ __!_r__?_                          _ r .t -                  r"= _                =
  • As. A 4dk kv&4v vv &4.g 46 444a 64464a k ww wV&&& yaw 6bW bv wiw aGkAJ&dwheven wa maw hv4AAA4&4aaewu
                                           ! !.                                    . ; ,.                                                                                       f..

v, .r v. . ..u Lvm

                                   .m                                                           .. rmit                                                                                                       -.   ..
                 -y :m,

_. n

                         .v.       w       uu            ..N vyw   tm        uuvu               u.         . u
                                                                                                                          .m....

yvnw aw uv u na u v. a w %*

m. t. _ _ . ' _ .T.t.. f*__. . _ . _ _
                   "Oper       .uv.!m._. u.               u 11  u _yu _ _n _w4,    . . _ _ y44vi 6v a way 9. , 4-                        i fY,' v' .vv1 ?auwuw

_ t . .rw. . _ 64 _ a 6 wwwsu a.- e s _ _ - -_ _ t ? _ t _ _ _ . .c t ., A A ,, _ _,,,:, . . r. .,, , y ,

8. uw-uwwueu
4. . sw viuyuauuawu6 vs ww.a.1- uaua att. . .._

_,.qnuI.c,a g gc af, e

v. .. .v d n e.. ' 9

(* -, A...C ne

                                                                                                                                              . t h. . a. I"~.n.=.. 4. c n y. . n. n. . ..            e.1      *f*m         eh nf ad
                                                     *    ,-.fm,              / 4             .+ A L D \ m . ,3 c m ... ? _ 4                                                                                        Jfmim 45 u u v us g4 syy w ou n uf un au vw w .a v n                                                   ..v..t f '.. a4g /uj\ala.mvar .L.w_      u              a umvsvg,4 !_1             w u4
                                     *T*    _L_L                  .1 c___!r _.;m                           . / 4 ~                    d*

a w wu4u w.aa ./yw.,4 us u uv us g4 ayywuu . m- p v ,w ~ w -. -

Trojan Nuclear Plant Docuinent Control Desk , Docket 50 344 January 27,1993 License NPF.1 Attachment II , Page 10 of 12 E: Modificatiers to the-instrtimentatien-for-the-steam-driven-Ausiliary. Ferdwater-Pumpr i

                                          -0.                Repineement-of-cer t ain-tempo rary-vak e; - in =t he-primary-sampling-
                                                     -system 4vith-permanera "ced:" vaku, t
                                             .               4                     A4 44 4        b                                   -

TT 4 -

5. Performance-of-a-generetcr l cad rejection-test-from-100% of-rated-power:-
                                          - 6.                Performance of ; Ic35tf-Off3itc pcWct (Ic33 cftll-btit cmcijcacy dIc3cl
                                                    - generator-pow::) :est-from-greater-4hea409-generater-: d.-- (Th!:

nst should bc pcrictmcd prior to merc $an 100 hour; ci spctr.:!ca :-

                                                        .pe>>er %vels-greatethan 205 pcwcr-)r
7. Pcriermancc of a natural circulatiersc3 at appccimatcly 5% of ret.ed- ,
                                                         -power. (This--tc3: Should be performed prict to morc San 100 houra ef-eperation-at-power-levels-greater-than 20% pc4                                                                  :

P

                       -           .~, --

r, . _ . . . . . , +

i

                       ..              Trojan Nuclear Plant                                             Document Control Desk     i Docket 50 344 -                                                  January 27,1993 License NPF 1                                                    Anachent II INSERTA                     Page 11 of 12 1
                          ... superseded in its entirety by Possession Only License (POL) No, NPF L .                             '

4 F f 4 t i e

                                                                                                                                .y
                                          ,            , . , . , _ - - ,--. y . _ , , . , , . . . . . ,  ,,   . . , . .
         .. .. . 3
                                                                       .                                                      Trojan Nuclear Plant                                                Document Control Desk '

Docket 50 344 January 27,1993 License NPF 1 . Attachment 11 INSERTH Page 12 of12 l Tbc licensee is not authorized to operate the facility as a nuclear reactor. The rated reactor j core output power is 0 megawatts (thermal).  ! I i ( i o

                                                                                                 %-                            .   ~   ,  -e -~rew. , .w-+-   .- w- ew,'- --  e-     -. , y e- -
 ,o Trojan Nuclear Plant                                                    Document Control Desk Docket $0 344                                                          January 27,1993 License NPF 1                                                           Attachment til Page 1 of 6 PQBTLANDJENERAL ELECTRIC COMPANY ILLCITY OF EUGENE. OREGON PACIFIC POWER AND_ LIGHT COMPANY' RQCKET NO. 50-344 IA01AN NUCLEAR PLANT FACILITY OPERATING LICENSE                                               ,

License No. NPF-1

1. The Nuclear Regulatory Commission (the Commission) having found that:

A The apphcation for license filed by Portland General Electric Company, the City of Eugene, Oregon, acting by and through the Eugene Water and Electric Board, and Pacific Power and Light Company * (the licensecs) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set fonh in 10 CFR Chapter I and all required notifications to other agencies or bodies have been duly made; B. Constmetiori of the Trojan Nuclear Plant (facility) has been substantially completed in conformity with Construction Permit No. CPPR-79 and the application, as amended, the provisions of the Act and the mles and regulations of the Commission; C. The fhcility will be maintained in conformity with the application, as amended, the l provisions of the Act, and the mies and regulations of the Commission; D. There is reasonable assurance: (i) that the activities authorized by this license can l be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the rules and regulations of the Commission;  ; i E. Portland General Electric Company is technically qualified and the licensees are financially qualified to engage in the activities authorized by this license in accordance with the rules and regulations of the Commissions; "

  • Pacific Power and Light Company, which has a 2.5% ownership interest in Trojan, has merged with Utah Power and Light Company to become a new corporation named PC/UP&L Merging Corporation, which will change its name to PacifiCorp, but will operate under the assumed ,

business name ofPacific Power and Light Company.

Trojan Nuclear Plant Document Control Desk Docket 50 344 January 27,1993 License NPF 1 Attachment 111 Page 2 of 6 F. The licensees have satisfied the applicable provisions of 10 CFR Part 140,

                                   " Financial Protection Requirements and Indemnity Agreements," of the Commission's regulations; G.            The issuance of this license will not be inimical to the common defense and                                      l security or to the health and safety of the public; II.

After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of Facility Operating License No. NPF 1 set forth herein is in accordance with Appendix D to 10 CFR Part 50, of the Conmiission's regulations and all applicable requirements have been satisfied; and I. The receipt, possession, and use of source byproduct and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Part 30,40, and 70, including 10 CFR Section 3033,40.32, and 70.23 and 70.31.

2. Facility Operating License No. NPF-1 is superseded in its entirety by Possession Only License (POL) No. NPF-1 hereby issued to the Portland General Electric Company, The i
  • City of Eugene, Oregon and Pacific Power and Light Company to read as follows:

A. This license applies to the Trojan Nuclear Plant, a pressurized water nuclear reactor and associated equipment (the facility) owned by the licensees. The facility it located on Portland General Electric Company's site on the west shore of the Columbia River in Columbia County, Oregon, and is described in the Updated - Final Safety Analysis Report, as supplemented and amended in accordance with 10 CFR 50.71(c), and the Environmental Report as supplemented and amended (Supplements 1 through 3). B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses: (1) Pursuant to Section 103 of the Act and 10 CFR Part 50, " Licensing of Production and Utilization Facilities," to possess, use, but not operate the . fac.ility at the designated location in Columbia County, Oregon in accordance with the procedures and limitations set forth in this license; I (2) Pursuant to the Act and 10 CFR Part 70, to possess at any time special nuclear material as reactor fuel, in accordance with the limitations for storage, described in the Final Safety Analysis Report, as supplemented and

amended;
              ,.m..,     ..,v-.,..   > . , , , ~ . , . , , , , .        ,,                   ,.      ,          ,    ,,           ,               ,     ,

Trojan Nuclear Plant Document Control Desk Docket 50 344 January 27,1993 License NPF-1 Attachment Ill-Page 3 of 6

2. (cont.)
11. (cont.)

(3) Pursuant to the Act and 10 CFR Parts 30,40, and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as scaled neutron sources, scaled sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30,40, and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instmment calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. C. This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section -i' 30.34 of Part 30. Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafler in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level The licensee is not authorized to operate the facility as a nuclear reactor. The rated reactor core output power is 0 megawatts (thermal), , (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through j Amendment No,188, and the Environmental Peotection Plan contained in Appendix B, are hereby incorporated into this license, The licensee shall; maintain the facility in accordance with the Technical Specifications and the Environmental Protection Plan. (3) = (This paragraph intentionally deleted) l (4) (This paragraph intentionally deleted)- l

     ;       Trojan Nuclear Plant                                                  Document Control Desk Docket 50-344                                                         January 27,1993 License NPF-1                                                         Attachment til Page 4 of 6
2. (cont.)

C. (cont.) (5) (This paragraph intentionally deleted) l (6) Spent Fuel Pool Madjlication The licensee is authorized to modify the spent fuel pool as described in the application dated August 1,1983 and amended October 31,1983. (7) Qualif yAnytanto Activities to which a Quality Assurance Program is applicable shall, after l the date ofissue of this license, be conducted in accordance with the . Nuclear Quality Assurance Program. (8) The licensee may proceed with and is required to complete the , modifications identified in Paragraphs 3.1.1 through 3.1.18 of the NRC's Fire Protection Safety Evaluation Report on the Trojan Nuclear Plant dated March 22,1978. These modi 0 cations shall be completed by the end of the second refueling outage of the Trojan facility and prior to return to operation for Cycle 3. In addition, the licensee shall submit the additional information identified in Table 3.2 of this Safety Evaluation Report in accordance with the schedule contained therein. In the event these dates for submittal cannot be met, the licensee shall submit a report explaining the circumstances, together with a revised schedule. (9) Primary Shielding Modi 6 cation The licensee is authorized to modify the primary shielding design as described in PGE letter dated April 22,1977, as supplemented and amended by letters dated September 22 and 23,1977, Decemt.cr 22,1977, l January 4 and 24,1978, March 20, and April 4,1978. l (10) (This paragraph intentionally deleted.). l l l

4 . Trojan Nuclear Plant Document Control Desk Docket 50 344 January 27,1993 License NPF 1 Attachment til Page 5 of 6 2.- (cont.) C. (cont.) (11) (This paragraph intentionally deleted.) (12) (This paragraph intentionally deleted.) (13) (This paragraph intentionally deleted.) (14) (This paragraph intentionally deleted.) (15) (This paragraph intentionally deleted.) (16) SacaduelAmmbly_ Shipping cask The licensee shall not move a spent fuel assembly shipping cask into the Fuel Building. D. The licensee shall fu;ly implement and maintain in efTect all provisions of the Commission approved physical security, guard training and qualification and safeguards contingency plans including amendments made pursuant to provision of the Miscellaneous Amendmente and Search Requirements to 10 CFR 73 55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: " Trojan Nuclear Plant Security Plan", with revisions submitted through October 7,1988; " Trojan Nuclear Plant Security Force Training and Qualification Plan", with revisions submitted through June 10,1988: and " Trojan Nuclear Plant Safeguards Contingency Plan", with revisions submitted through October 7,1988. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth herein. E. This license is efTective as of the date ofissuance and shall expire at midnight February 8,2011. FOR THE NUCLEAR REGULATORY COMMISSION-Originally Signed by Roger S. Boyd, Acting Director Division of Reactor Licensing Oflice of Nuclear Reactor Regulation

Trojan Nucleas Pimt Document Control Desk Docket 50 344 January 27,1993 License NPF 1 Attaciunent til Page 6 of 6

1. Enclosure 1 intentionally Deleted l
2. Appendices A & 13 Technical Specifications Date ofIssuance: November 21,1975

Enclosures: