ML20129J617

From kanterella
Revision as of 02:27, 6 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Withholds Comment on Proposed Tech Spec Change Involving Extension of Time to Repair RHR Pump 1B Pending Review of GE Apr 1969 Aped 5736, Guidelines for Determining Safe Test Intervals & Repair Times for Engineered Safeguards
ML20129J617
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 07/18/1985
From: Parker M
ILLINOIS, STATE OF
To: Harold Denton
Office of Nuclear Reactor Regulation
References
DOE-85-112, NUDOCS 8507230170
Download: ML20129J617 (1)


Text

t

  1. 6N

'en h 0$$I

\.  ?? .!

<:r g #

STATE OF lLLINOIS DEPARTMENT OF NUCLEAR SAFETY 1035 OUTER PARK DRIVE SPRINGFIELD 62704 (217) 546-8100 TERRY R. LASH Ju1y 18, 1985 DAN L. WILLIAMS DIRECTOR DEPUTY DIRECTOR Mr. Harold Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20SSS

Subject:

Quad-Cities Station Unit 1 Exigent Proposed Technical Specification Change involving Extension of Time to Repai r the IB RHR pump

Reference:

J. Wojnarowski Letter to H. Denton Dated July 11, 198b 00E-8S-112 The state of Illinois Department of Nuclear Safety has reviewed the proposed technical specification change referenced above. The Department's comment on this request is withheld pending our review of the technical specification (DPR-29)

Section 3.5. A (page 3.S/4. i-11) Ref erence 3, " Guidelines for Determining Safe Test Intervals and Repair Times for Engineered Safeguards", GE Topical Report APED 6736, April 1969.

We intend to respond regarding our evaluation of subject prior to the comment period deadline.

Sin rely, ic C Parke h Division of Engineering MCP:RRM: MAN cc: T. Lash G. Wri ght J. Keppler, NRC Region III R. Lickus, NRC Rgion III R. Bevin, NRC Washington, D.C.

J. Wojnarowski, CEC 0 8507230170 850718 DR ADOCK05000gg4 /h66l P

48