ML20133H094

From kanterella
Revision as of 02:54, 4 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Sanitized Summary of 840710 Meeting W/Ge in Region II Ofc Re Denial of Violation Concerning Statistical Methods Used to Determine Measurement Control Limits
ML20133H094
Person / Time
Site: 07001113
Issue date: 07/30/1984
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Long J
GENERAL ELECTRIC CO.
Shared Package
ML20133H069 List:
References
FOIA-85-158 NUDOCS 8508090184
Download: ML20133H094 (1)


Text

r l

[ - }g ,,o.s joy, 6

NUCLEAR REGULATURY COMMISSION

  1. J.-

' [ c5 REGloN il U E 101 M ARIETTA STREET, N.W.

$Y$ 6

.....- y.,,v~

Ge'neral Electric Company a h .pL ATTN: Mr. J. A. Long, General Manager Wilmington Manufacturing Department L /, g f v P.O. Box 780 /

Wilmington, North Carolina 28402 Gentlemen:

SUBJECT:

SUMMARY

OF THE JULY 10, 1984 MEETING WITH GENERAL ELECTRIC This refers to the special meeting held at the Region II office on July 10, 1984, to discuss the denial by General Electric of a violation concerning statistical methods used to determine measurement control limits. The subjects discussed at this meeting and c list of the attendees are presented in the enclosed Meeting Summary and Attachment A, respectively.

It is our opinion that the meeting was beneficial and resulted in a better understanding of the issues. As discussed in a telephone conversation on July 24, 1984, between Mr. C. M. Vaughan of ycur staff and Mr. K. P. Barr of this effice, we nave reviewed the issues discussed in the July 10, 1984 meeting, ar.d continue to believe that the violation did occur. You are hereby required to submit to this office, within 30 days of the date of this letter, a response in ~

accordance with the Notice of Violation issued October 31, 1983.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.2., safeguards activities and security measures are exempt from public disclosure; therefore, Attachments B & C to the Enclosure to this letter will not be placed in NRC's Public Document Room.

The responses directed by this letter and the enclosures are not subject to the clearance procedures of the Office of Management and Budget issued under the

, Paperwork Reduction Act of 1980, PL 96-511.

'Should you have any questiens concerning tnis letter, please contact us.

Sincerely,

,p

, g - ~. ,

)James&!

b t P. O'Reilly ..

Reg;onal Administrator

Enclosure:

Meeting Suwary w/ Attachments (Era pt frem Disclosure) cc w/encls:

C. M. Vaughan, Manager Licensing and Nuclear Materials Mau ge.nen t l'r.i t 8508090104 850621 PDR FOIA RATNER 85-158 PDR