ML20247B545
| ML20247B545 | |
| Person / Time | |
|---|---|
| Site: | 07001113 |
| Issue date: | 08/28/1989 |
| From: | Stohr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Lewis W GENERAL ELECTRIC CO. |
| References | |
| NUDOCS 8909130067 | |
| Download: ML20247B545 (1) | |
Text
gy7 p d;
~
M/
1
- 7) Q%
t
- AUG 2 81989^
m-zDocketiNo. 70-1113' Li, cense No. SNM-1097
- n
- Generali Electric Company ATTN: 'Mr.: Wayne P.' Lewis, Manager Nuclear Fuel and Components
.1 Manufacturing P. 0. Box:780:
4 LWilmington, NC 28402
- Gentlemen:-
SUBJECT:
TIME EXTENSION.FOR REPLY TO A NOTICE OF VIOLATION This'isLin'responsetoyourrequestofAugust 18, 1989 for an extension of time'
- for-preparation of a response to the Notice of Violation issued with NRC
' Inspection Report No. 70-1113/89-05'on July 27,?I989
.With good cause' having 'been shown, you are-hereby granted a 45 day time extension making your response,due on October 10,l1989.
LIf you = haveD any questions.concerning this letter, please call me or Mr. W. E. Cline:on.(404) 331-0346.
Sincerel,
3-J. Philip Stohr, Director
' Division of Radiation' Safety-
'and Safeguards.
cc:.
T. Pre'ston Winslow, Manager Licensing.and Nuclear-
- Materials Management.
- State of North Carolina bec: License Fee' Management Branch
" Document > Control Desk I jf tf
- RII.DRSS R::I CK S EM ne:
C ire
' 8/A /89 h{/89 89'09130067' 890828
- PDR-ADOCK 07001113-ZHf t
C~
PDC _ _ _._ _ _
I ~'