Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217N1608 October 1999Forwards Amend 11 to License SNM-1097,including Rev 5 to Physical Security Plan, Dtd Aug 1999.Safeguards Evaluation Rept,Encl
ML20216F1218 September 1999Forwards Insp Rept 70-1113/99-05 on 990809-13.No Violations Noted
ML20211L28231 August 1999Forwards Insp Rept 70-1113/99-04 on 990726-0805.No Violation Noted
ML20211F24925 August 1999Forwards Insp Rept 70-1113/99-202 on 990802-06.No Violations or Deviations Noted
ML20211D76119 August 1999Discusses 990806 Meeting Conducted at General Electric Facility Re NRC Evaluation of Performance in Five Major Areas of Safety Operations,Safeguards,Radiological Controls, Facility Support & Licensing Activities.With Encl
ML20211B39719 August 1999Forwards Amend 10 to License SNM-1097,incorporating Changes to Respiratory Protection Program & Modifying Safety Condition S-1 to Include Date of 990806.SER,which Includes Categorical Exclusion Determination Also Encl
ML20210V19113 August 1999Forwards Insp Rept 70-1113/99-03 on 990712-16.No Violations Noted.Insp Consisted of Selective Exams of Procedures & Representative Records & Interviews with Personnel
ML20211A37012 August 1999Refers to ,Which Transmitted Rev 5 to Physical Security Plan.Rev Acceptable for Inclusion Into Plan
ML20209J44613 July 1999Ack Receipt of Application for Amend of Matls License SNM-1097,transmitted by .Anticipates Completion of Review by 990830
ML20209E3326 July 1999Discusses Results of NRC Review of GE Program for Conducting NRC Licensed Activities for Period of 970818-990514. Determined That GE Continues to Operate Facility Safely & Demonstrated Number of Strengths.Review Outline Encl
ML20196H82224 June 1999Confirms Discussions Between R Foleck & D Ayres on 990624 Re Mgt Meeting Requested.Meeting Scheduled for 990806 at Gene Wilmington,Nc Re Results of Licensee Performance Review
ML20195D4084 June 1999Forwards Partially Withheld Insp Rept 70-1113/99-201 Conducted on 990510-14.No Violations Noted.Major Areas Inspected:Facility MC&A Safeguards Program.Insp Rept Details Withheld,Per 10CFR2.790
ML20195D2872 June 1999Forwards License SNM-1097,amend 9,incorporating Changes Made to Radiological Contingency & Emergency Plan.Safety Condition S-3 Has Been Revised to Reflect Changes to EP as Listed.Ser Encl
ML20217B88025 May 1999Forwards Amend 8 to License SNM-1097 & Safeguards Evaluation Rept,In Response to 990225 Submittal of Certain Changes to Chapter 4.0 of Fundamental Nuclear Matl Control (Fnmc) Plan
ML20206B54127 April 1999Responds to ,Requesting Addl Six Months Extension for Submission of Final Status Survey Rept for Northwest Caf Storage Area on or Before 991016.Request for Extension Until 991016,has Been Approved
ML20207M15211 March 1999Informs That Encl Ltr Explains How NRC Plans to Institute Round Robin Sample Exchange Program Administered by Nbl for Verifying Quality of Licensee U Destructive Measurement Sys.Invoice FLO234-99 Encl
ML20203G4535 February 1999Forwards Insp Rept 70-1113/99-01 on 990111-15.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls
ML20203B4285 February 1999Forwards Amend 7 to License SNM-1097,incorporating Changes to Radiological Contingency & Emergency Plan.Safety Evalution Rept,Including Categorical Exclusion,Encl
ML20202J07229 January 1999Forwards Insp Rept 70-1113/99-02 on 990104-08.No Violations Noted
ML20199E0564 January 1999Requests Addl Info for Info Not Found During Review of Listed Licensing Documents.Nrc Is in Process of Preparing Rtm Suppl for Each Fc Facility,Per .Suppl Assist NRC Incident Response Staff as Emergency Assessment Tool
ML20198F0339 December 1998Responds to 981008 & 1124 Ltrs,In Which GE Requested Changes to Final Status Survey & Release Plan for Northwest FSS Plan
ML20196A62724 November 1998Approves Request for Extension Until 990416 to Complete Final Decommissioning Activities Re CaF2 Area Survey & Release Plan
ML20155A82330 September 1998Forwards Insp Rept 70-1113/98-05 on 980908-10.No Violations Noted.Purpose of Insp Was to Determine Whether Activities Authorized by License Were Conducted Safely & in Accordance with NRC Requirements
ML20154C33911 September 1998Forwards Insp Rept 70-1113/98-03 on 980817-21.No Violations or Deviations Noted.Purpose of Insp,To Determine Whether Activities Authorized by License Conducted Safely & in Accordance with NRC Requirements
ML20154C1474 September 1998Forwards Insp Rept 70-1113/98-04 on 980810-14.No Violations Noted.Conduct of Activities at GE Facility Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls
ML20151U0873 September 1998Forwards Amend 6 to Materials License SNM-1097 for Ge.Amend Allows Time Extension for Distributing Material Repts of July 1998,physical Inventory.Temporary Safeguards License Condition SG-1.5 Being Issued Effective Immediately
ML20151S7743 September 1998Forwards Partially Withheld Insp Rept 70-1113/98-204 on 980810-14.No Violations Noted.Rept Details Withheld (Ref 10CFR2.790(d))
ML20237B4207 August 1998Forwards Insp Rept 70-1113/98-02 on 980713-17.No Violations Noted
ML20236U94629 July 1998Forwards Amended License SNM-1097 to Allow Requested Time Extension to Certain Specified Commitments in Fundamental Nuclear Matl Control Plan.Safeguards License Conditions SG-1.4 & SG-1.1 Were Revised.W/Safeguards Evaluation Rept
ML20249B2878 June 1998Informs of NRC Plans to Develop Emergency Response Technical Manual Suppls for Fuel Fabrication Facilities
ML20248D23627 May 1998Forwards Amend 4 to License SNM-1097,correcting Errors in Chapter 1.0 of License & Ser.Mod of Safety Condition S-1, Discussed
ML20247H97614 May 1998Forwards Insp Rept 70-1113/98-202 on 980420-24.One Noncited Violation Re Cutting & Welding Permit Program Was Identified
ML20247H83813 May 1998Forwards Insp Rept 70-1113/98-203 on 980504-08.Minor Violation Was Identified But Not Cited for Listed Reason
ML20247F9675 May 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-1113/98-01.Response Meets Requirements of 10CFR2.201
ML20216D2848 April 1998Forwards Partially Withheld Insp Rept 70-1113/98-201 on 980309-13.No Violations Identified.Insp Details Withheld (Ref 10CFR2.790)
ML20216H4566 April 1998Responds to Requesting Six Month Delay in Completion of Northwest CaF2 Storage Area Decommissioning Project,Due to Adverse Weather Conditions.Determined That Request Is Justified & Expects Completion by 981016
ML20217G08726 March 1998Forwards Insp Rept 70-1113/98-01 on 980223-27 & Notice of Violation.Violation Involved Drums Containing Used Solvent for Nuclear Criticality Safety Requirements
ML20216G72010 March 1998Forwards Amended License SNM-1097,re Organizational Changes at General Electric.Safety Conditions S-3,S-1 & SG-1.1, Revised as Listed
ML20217P87720 February 1998Forwards Matl License SNM-1097,amended to Permit Personnel Movement Between Controlled Areas & non-controlled Areas Through Access Points Other than Change Rooms
ML20203B53317 February 1998Informs That Revs to Chapters 3.0,4.0 & 7.0 of Fundamental Nuclear Matl Control Plan Are Acceptable & Safeguards License Condition SG-1.1 of License SNM-1097 Will Updated in Future License Amend.Ser Summarizing NRC Review,Encl
ML20202A6873 February 1998Informs of NRC Region II Mgt Changes,Effective 980215. Revised Organization Chart Encl
ML20198Q05915 January 1998Informs That NRC Completed Review of Licensee Submittal Re Revs to Emergency Plan & Determined Proposed Changes Do Not Decrease Effectiveness of Ep,Per 10CFR70.32(i),no Action by NRC Required Prior to GE Affecting Changes
ML20199B3966 January 1998Forwards Insp Rept 70-1113/97-08 on 971208-12.No Violations or Deviations Noted.Purpose of Insp Was to Determine Whether Activitieds Authorized Conducted Safely & Per NRC Requirements
ML20199J99620 November 1997Informs That NRC Has Regulatory Authority to Require GE to Monitor & Remediate Groundwater as Necessary to Protect Human Health & Environ,In Response to 971112 Telcon
ML20212B89020 October 1997Confirms Discussions Between C Vaughan & a Gooden on 971014 Re Mgt Meeting Requested to Discuss Results of Licensee Performance Review for GE Nep Facility.Meeting Scheduled for 971028 in Wilmington,Nc
ML20198K0287 October 1997Informs That Which Transmitted Rev 4 to Physical Security Plan,Contains 10CFR2.790(d) Info.Submittal Deemed to Be Commercial or Financial Info & Shall Be Subject to Public Disclosure on IAW Provisions of 10CFR9.19
ML20198K1001 October 1997Informs That NRC Completed Review of Submitted Changes & Determined Changes Do Not Decrease Effectiveness of Radiological Contingency & Emergency Plan & Is Acceptable Per 10CFR70.32(i)
ML20211G88026 September 1997Forwards Amend 1 to License SNM-1097,allowing Changes to Table 6.0 Re H F Effluent Recovery & Storage Facility for Dry Conversion Process.Ser Accepting Amend,Encl
ML20211D46718 September 1997Concurs W/Licensee Determination That Calcium Flouride Central Storage Area Was Improperly Identified Under 10CFR70.38.Notification Ltr of 960913 Is Withdrawn
ML20211A0855 September 1997Proposes That Ge/Nrc Conduct Workshop on Integrated Safety Analysis During Wk of 970929.Comments on Proposal & Suggested Agenda,Requested