ML20138K544

From kanterella
Revision as of 14:58, 29 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Rev 21 Pc 1,Part 3, Monthly Heating & Ventilation Sys Checks,Unit 2 Turbine Hall
ML20138K544
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 01/25/1997
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20138K159 List: ... further results
References
PC-1, NUDOCS 9702180411
Download: ML20138K544 (3)


Text

-- __ _ . ..

,' NUCLEAR POWER BUSINESS UNIT PC 1 PART 3 OPERATIONS PERIODIC CHECKS NNSR 1/ Revision 21

(

6 ' -

  • MONTHLY HEATING AND VENTILATION SYSTEM CHECKS, UNIT 2 TURBINE HALL January 25,1997 l

Date RECORD DSS PROCEDURE VERIFIED CURRENT AND CHECKED FOR TEMPORARY CHANGE 5 IF FIELD i CoPrEs REoUIRED. usE PaF.com IAw NP 124 AND DO MI COMPLETE TH!s BLOCK BY: DATE:

i' 1.0 PURPOSli To check the condition of filters in the heating and ventilation systems for replacement or cleaning.

)

2.0 PRECAUTIONS AND LIMITATIONS Use gloves while handling filters.

3.0 INITIAL CONDITIONS None INITIALS 4.0 PROCEDURE 4.1 Check condition of the following disposable filters and replace as i necessary:

)

NOTE 1: Allfilter material receivedfrom the storeroom must have a completed storeroom requisitionform, Form 1633.

NOTE 2: All disposablefilters are stored in No.2 warehouse.

! 4.1.1 Unit 2 rod control electric equipment room supply (2W-51, 2F-97) l (24) 16 X 20 X 2 fiberglass filters (911-7695) l 4.1.2 Water treatment supply (W-52, F-98) l (12) 16 X 25 X 2 fiberglass filters (911-7687) i 1

4.1.3 Units 1 and 2 circulating water pump (P30A&B) motor, air intake openings.

l (8 per pump) 14 X 42 X 1 fiberglass filters (911-9621) 9702180411 970210 Page1of3 INFORMATION USE '

PDR ADOCK 05000301 i P PDR .

, NUCLEAR POWER BUSINESS UNIT PC 1 PART 3 OPERATIONS PERIODIC CHECKS NNSR

  • f' Resision 21 MONTHLY HEATING AND VENTILATION January 25,1997 SYSTEM CHECKS. UNIT 2 TURBINE HALL INITIALS NOTE: Change bus ductfilters regardless of appearance during ,

months ofMay through October.

4.1.4 Generator bus duct cooling unit (2W-45A&B,2F-95) l (1) 16 X 20 X 2 (911-7695) 4.1.5 D-305/l&2 D-205 battery room recirc and supply fans (F-143/F-144) l (4) 16 X 25 X 2 (915-3402) 4.1.6 Work control center heating and air conditioning Unit (HX-299)

(4) 16 X 20 X 2 (911-7695 4.2 Clean the following industrial heater washable filters and reinstall (months of February and August only).

NOTE: Ifreplacement mediafor HX-71 is required, measure old media to determine applicable lot number.

16 X 20 X 2 (911-8101) 20 X 25 X 2 (911-8110) 4.2.1 2HX-71 A (El. 46')

4.2.2 2HX-71B (El. 46')

4.2.3 2HX-71C (El. 46')

4.2.4 2HX-71D (El. 26')

4.2.5 2HX-71G (El. 8')

4.2.6 2HX-71H (El. 8')

4.2.7 2HX-71J (El. 8')

4.2.8 2HX-71K (El, 8')

4.2.9 2HX-71M (El. 26')

4.2.10 2HX-71L (El. 26') .

Page 2 of 3 INFORMAT'ON USE 9

. NUCLEAR POWER BUSINESS UNIT PC 1 PART 3 OPERATIONS PERIODIC CHECKS NNSR 9 Resision 21

' MONTHLY HEATING AND VENTILATION January 25,1997 SYSTEM CHECKS. UNIT 2 TURBINE HALL INITIALS 4.3 2HX-259 Ion Chromatocraoh A/C Filter Across From Secondary Samole Eas]

4.3.1 Remove filter retainer and filter media.

4.3.2 Clean filter media with soap and water.

4.3.3 Blow dry and apply a light coat of oil.

(LPS-3 recommended) _

4.3.4 Replace filter media and retainer.

4.4 Check WI1 A SA/IA compressor room air circu!ation fan. Brush offdirt from guard and motor Remarks:

4 i

. . Page 3 of 3 INFORMATION USE

,